Advises That Proposed FSAR Changes Re Use of Visual Weld Acceptance Criteria Acceptable,Per
ML18057A598
Person / Time
Site: Palisades 
Issue date: 11/23/1990
From: Brian Holian
Office of Nuclear Reactor Regulation
To: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
TAC-77951, NUDOCS 9012040082
Download: ML18057A598 (3)


Text

,,

!.";j. : **. _1.! c..~.i Docket rto. 50-255 Mr. Gerald B. Slade Plant General Manager Palisades Plant November 23, 1990

  • DISTRIBUTION:

Docket FTies-. NRC & Local PD Rs PDIII-1 r/f

  • ssoger JZwolinski BPierson SMeador BHolian OGC-WFl EJordan ACRS(lO)

POIII-1 Plant File 27780 Blue Star Memorial Covert, Michigan 49043 Highway CYCheng

Dear Mr. Slade:

SUBJECT:

PALISADES NUCLEAR POWER PLANT - APPROVAL OF NUCLEAR CONSTRUCTION ISSUES GROUP VISUAL WELD ACCEPTANCE CRITERIA FOR STRUCTURAL WELDING AT NUCLEAR POWER PLANTS Your letter dated November 5, 1990, submitted a proposed.revision to Palisades Nuclear Plant Final Safety Analysis Report (FSAR) requesting the use of the Nuclear Construction Issues Group Visual Weld Acceptance Criteria (VWAC) during the present steam generator replacement effort at Palisades.

The VWAC will be used only on uncoated structural weldmerits fabricated under the rules of the American Welding Society 01.l Structural Welding Code.

In a letter dated November 5, 1985, the NRC staff approved the use of VWAC for structural welding at nuclear power plants on a generic basis and mandated that the specific licensee wishing to use VWAC for its plant must revise its FSAR to shbw the use of this criteria.

The staff has reviewed the proposed FSAR changes describing the use of VWAC on uncoated weldments at Palisades and finds them acceptable. This action completes TAC No. 77951.

cc:

See next page Si nee.rely, original signed by Brian E. Holian, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V and Special Projects Offi~e of Nuclear Reactor Regulation DOCUMENT NAME:

TAC NO. 77951 CONSTRUCTION Office:

LAf P~h_II,li~

Surname:

~pv;.IYlr\\

Date:

  • ///43/90 PM/PDIII-1 BHo 1 i an/t~~.)..

/-z.~ /90 r-~29-j'2040o:=::~o;=;-11;:;;:;;:-..:.__~-

~

F~012040082 9_.011.?~*

DR ADni-*1,.*

p

--r. U5000255 PDC

\\

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 DockEt No. 50-255 Mr. Gerald B. Slade Plant General.Manager Palisades Plant 27780 Blue Star Memorial Highway C~vert, Michigan. 49043

Dear Mr. Slade:

Novemper 23, 19~0-

SUBJECT:

PALISADES NUCLEAR POWER PLANT - APPROVAL OF NUCLEAR CONSTRUCTION ISSUES GROUP VISUAL WELD ACCEPTANCE CRITERIA FOR STRUCTURAL WELDING AT NUCLEAR POWER PLANTS Your letter dated November. 5, 1990,. submitted a proposed revisiori' to Palisades Nuclear Plant Final Safety A~alysis'Report (FSAR) requesting the use of the

_--Nuclear Construction Issues _Group Visoa*1 Weld Acceptanc*e*criteHa-(VWAC) dur-ing the present steam generator replacement effort at Palisades. - The VWAC will be used only on uncoated structural.weldments fabricated under'. the rules of the,'

American Welding Society Dl.1 Structural Welding_ Code.

In a letter dated November 5~ 1985, the NRC staff approved the use of VWAC for structural welding at nutlear power plants on a generi~ basis ~nd mandated that the specific licensee wishing to use VWAC for its plant must ~eVi$e its FSAR to show the use of this criteria.

-The staff has re~iewed the pr6posed FSAR chan~es describi~g the use of VWAC on vncoated weldments at Palisades_~nd finds t~em acceptable~* This acticin completes TAC No. ~795i.

cc: See next page

  • sincerely,*

"?:, ____ _.~

Brian E. Holian, Project Manager Project Directorate III-1 Division of Reacttir Projects - III, IV; V and Special Projects Office of _Nu.clear Reactor Regulation

~.,.

~**

".J r* 1*

Mr. Gerald B. Slade Co'nsumers Power Company cc:

M *. I. Miller, Esquire Sidley & Austin 54th Floor One First National Plaza Chicago, Illinois 6C6GS Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan* 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Fi:gicnai Adnii11.istrate;r:, Regfori Ill U.S. Nuclear Regulatory Commission 799 Roosevelt Road.

Gl~n Ellyn, Illinois 60137 Jerry Sarno Township Supervisor Covert Township 36197 M-f40 Highway Covert, Michi~an 49043*

Off ice of the Governor Room.I - Capitol Building.

Lansing, Michigan 48913 Mr. David J. Vandewalle Director, Safety and Licensing Pa 1i sades Plant 27780 Blue Star Memorial Hwy.

Covert, Michigan 49043 Resident Inspector

  • c/o U.S. Nuclear Regulatory Commission

-Paliscd~s Plant

  • 27782 Elue Star Memorial Hwy.

~('it:: rt, fH cJ. ~~an

  • 49043 Palisades P1arit.

Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P.O. Box 30035 Lansing, Michigan 48909 Gerald Charnoff, P.C.

Shaw, Pittman, Potts &

. Trowbridge 2300 N.. S.treet, ~. W *. *

.Washington, D.C.

20037 Mr. David L. Brannen Vice Pres-ident rct-lisades Generating.Plant c/o Bechtel* Power Corporation 15740 Shady Grove.Road

  • Gaithersburg, Maryland* 20877.