ML18054B029
| ML18054B029 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/02/1989 |
| From: | Berry K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8910100246 | |
| Download: ML18054B029 (2) | |
Text
II,
- \\ consumers
,/*Power PDWERINli MICHlliAN"S PRDliRESS General Offices:
1945 West Parnell Road, Jackson, Ml 49201 *. (517) 788-1636 October 2, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
RESPONSE TO INSPECTION REPORT 89023 Kenneth W Berry Director Nuclear LJcensing NRC Inspection Report 89023 dated September 1, 1989 transmitted concerns regarding the analytical measurements and laboratory-quality assurance.
In the exit meeting at the conclusion of the inspection and documented in the report, Consumers Power Company committed to submit our corrective actions for the identified weaknesses by October 1, 1989.
Consumers Power Company's action plan including improvement items, which were developed considering NRC proposed improvements, status and description and completion date are attached in fulfillment of the previously stated commitment.
Kenneth W Berry Director, Nuclear-Licensing CC Administrator, Region III, USNRC NRC Resident. Inspector - Palisades Attachment 8910100246 891002 PDR
~GOCK 0500025~
0 F'DC OC0989-0204-NL04
/
ATTACHMENT CONSUMERS POWER COMPANY PALI SAD.ES PLANT ACTION PLAN IN REPONSE. TO INSPECTION REPORT 89023 Item Develop and implement a procedure for the chemistry date trending program.
Add mean values to the Chemistry Control Charts.
Control Chart mean values and standard deviations should be determined quarterly with a minimum of 30 data points.
Increase the control review frequency.
chart Develop procedures for establish-ing control chart quality.
Investigate the use of multi-point calibration curves for AAS.
Develop a procedure defining the parameters and acceptance criteria.
for interlaboratory cross check progr.am.
OC0989-0204-NL04 Status/Decription A procedure describing the trending, program, required reviews and distribution will be developed, Complete:
mean values have been added to the Control Charts.
This item will be included in the Laboratory Quality Control Procedure.
Complete:
The c9ntrol charts are reviewed daily by the Senio_r Technicians (for those in use that day) and weekly by the Laboratory Supervisor.
This item will be included in the Laboratory Quality Control Procedure.
Complete:
An investigation has taken place into the use of multipoint calibration for the Atomic Absorption spectropho-tonemeter (AAS).
It has been concluded that single point standardization will continue for the AAS.
Perkin-Elmer manual, Analytical Methods for AAS, recommends the single point standardization and contains valid reasons for not using a multipoint standardization within the linear range.
This will be included in the Laboratory Quality Control Procedure..
Completion Date &
Responsibility 3 /1 /90
- complete 3/1/90 Complete 3/i/90 Complete 3/1/90