Text
)
}1./#
- f
~
consumers Power PDWERINli MICHlliAN"S PRDliRESS General Offices: 1945 West Parnell Road, Jackson,' Ml 49201 * (517) 788-0550 May 1, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
1988 ANNUAL ENVIRONMENTAL OPERATING REPORT Appendix B (Environmental Protection Plan) to Provisional Operating License No. DPR-20 for the Palisades Plant requires Consumer$ Power Company to submit the Environmental Operating Report annually by May 1.
The attached report covering the period from January 1 to December 31, 1988 fulfills the referenced report requirements.
Brian D.Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment OC0589-0007-NL02
% '1 0 ') 0 L\\" 0 J... J.A?
A CMS' ENERGY COMPANY
\\\\
- ATTACHMENT Consumers Power Company Palisades Plant
- Docket 50-255 1988 ANNUAL ENVIRONMENTAL OPERATING REPORT JANUARY 1 - DECEMBER 31, 1988 May 1, 1989
- 3905040210 8812:31 r
- 1 PDR ADOCI< 05000255 I
I R
PDC W*
3 Pages OC0589-0007-NL02
~£Z-S~
'/7
PALISADES NUCLEAR PLANT ANNUAL NON-RADIOLOGICAL EWIRONHENTAL OPERATING REPORT' 1.0
Background
Appendix 8 to Provisional Operating License Number DPR-20 for the Palisades Nuclear Plant~ Consumers Power Company, is entitled "Environ-mental Protection Plan (Non-Radiological)".
This document requires*
Consumers Power Company to submit to the Nuclear Regulatory Connission ari Annual Environmental Operating Report prior to May_ l which d.escribes implementation. of the.Environmental Protection Plari during the previous year.
The period covered by this annual report isJanuaryl to December 31, 1988.
The Palisades Plant operated for 4855.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> in 1988 producing a net total of 3,434,336 MWH.
This represents 53.6% of the net demonstrated capacity for 1988.
- The operation.of the ~alisades Plant did not result.in any adverse impact on the environment near the.Plant.
2.O Environmental Impact* Evaluations '
Throughout 1988, several revisions to proced~res.or modifications to the facility were evaiuated using the Environmental* Evaluation. form for.
impact on the environment *. Eleven of the packages were identified as
'dealing with environmental concerns of.which three required formal evalua-t i ori by the Environmental.Department of General Office for impact on the en vi ronmen t.
These were:
2.1 Special Test Procedure, T-282, "Initiate Backup Service Water. Flow to Engineering Safeguard Pump Seals".
This procedure authorizes*
rel.eases to. Lake Michigan and is currently being evaiuated against the Plant NPDES permit.
2.2 Special Test Procedure, T-267, "Reverse Osmosis Treatment of Makeup D~ineral izer Water" *. This procedure authorizes special releases to
- Lake.. Michigan in order to optimize Plant water chemistry.
There is no impact on the environment, and approval was obtained from the
. Michigan Department of ~atural Resources (MDNR).
2.3 Facility Change, FC-784, "Cold Laboratory Relocation". This modifi-
~ation replaces* the old laboratory wit~ a new facility~ Certain air and.water releases were ev'aluated iri. regard to the NPDES Permit and*
were approved by the HDNR.
RP0389-0026A-OP02.
.. 3.o
\\.
Additional Acti~ities A~thorized Under NPDES
- The. Plant receive*d permission from the Michigan Department* of Natural Resouices.(MDNR) ~or the following additional activity ~ithout thanging the language of th~ Plant NPDES permit:
- 3.1 Discharge allowances for operation of a Reverse Osmosis (RO) unit.
On May 6, 1988 the MDNR. provided verbal approval for test operat"ion
- of Reverse _Osmosis makeup water treatment unit.
Operation of the. RO
~as subject to ~he constraints det~iled in c~rrespondence to the MDNR *
. Accordingly, no. formal revision. of the Pl_ ant's NPDES Waste Water Permit was required.
4.0 Unusual Environmental Events There were no Unusual Environmental Events in 1988.-
5.0 Environmental Monitoring 5.1 M~teorological Monitoring to Document Effects of Cooling Tower Operation on Meteorological Variables There was no activity on this in 1988.
5.2 Hetbtcide Application
- . No herbicides were applied in 1988.
- 6. 0. *Non-Routine Reports*
There were three Non.;.Routine Reports gE!nerated in 1988 related to the*
operation of the Palisades Plant. These were:
6.1 On January 30-31, 1988 the Plant experienced an excursion of the thermal discharge limit of 1300 HBTu/Hr.
Required daily observation of the discharge showed no adverse effect on the aquatic biota.
6.2 On May 16, 1988.the Plant exceeded the daily maxililum limit of 20 mg/Q oil arid grease.
Daily visual observations of the mixing basin and Lake Michigan showed no oil present.
6.3 On *June 16, 1988.-the Plant exceeded the daily maximum limit of 0.2 mg/Q Total Residual Chlorine during chlorination of the circu-lating water system. Visual observations of the mixing basin discharge.and Lake Michigan showed no adverse effects upon aquat~c biota.
RP0389-0026A-OP02.
. i.
. '. '(
,.i.
):.
From Date Sub_iect CTHillman, Palis.ades
/ *(}
JMO' Connor, 1'"4 9 SC, Jackso~ fl J/'i
. December. l~ 19~8
...:;j PALISADES. ENVIRONMENTAL PROTECTION PLAN*
1988 HERBICIDE USAGE ALONG THE PAL~SADES "F.Y.IT. CORRIDOR" CC RJDelinck,
- P24-116
. CONSUMERS POWER COMPANY Internal Correspondence*
As required by the Palisades.Environmental Protection Plan (non~radiological)**
herbicides used alonR the Palisades "Exit Corridor" for right of way ve~eta-*
tion mana,.e1!1ent must be repor_ted at'nually to the Environmental Coordi.nator at.
Palisades. Durinll the past year (De.cP.mber-1, 1987 to NovePJber 30, 1988), no herbicide applications were conducted alonir the "Exit Corridor" for forestry operations~ The "Exit Corridor" is described as:
tine No.
306A
- 3061' 309A 309B
- 3lOA 3108 Line Name Palisades-Vergennee
- ..
- Tallmadge-Palisades Palisades-Argenta 11 Palisades-Argenta 12 Palisades-Co6k.12 PalisadP.s~Cook 11 Struc:tures From To 1
. 1 1011 -
1011 -
1241 -
1241 21 21 1030 1030 1244 1244 If you h~ve any q~estions or require additional information, I can be
- reached on 81289~*
IC1188-0030A-DI02
.,.