Category:E-Mail
MONTHYEARML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time ML23270B1912023-09-27027 September 2023 COL Docs - Update Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters Operating ML23263A1042023-09-20020 September 2023 COL Docs - FW Fyi for Tomorrow'S Psm Meeting ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23257A0632023-09-13013 September 2023 NRR E-mail Capture - Acceptance Review of Southern Nuclear Operating Company'S License Amendment Request to Remove Combined License Appendix C ML23256A2682023-09-13013 September 2023 COL Docs - Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9172023-08-31031 August 2023 NRR E-mail Capture - (External_Sender) Re Question - Legal Contact(S) for Vogtle Electric Generating Plant, Units 3 & 4 ML23241A0452023-08-29029 August 2023 COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements ML23229A2322023-08-17017 August 2023 COL Docs - FW Re LAR 22-002 Second Round RAI Approved ML23188A151 for Vogtle Units 3 & 4 ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23221A3982023-08-0909 August 2023 COL Docs - LAR 22-002 Second Round RAI Approved ML23188A151 ML23216A1592023-08-0404 August 2023 COL Docs - FW Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-0149) ML23212A9642023-07-31031 July 2023 COL Docs - Action - Start of Annual Fees - Vogtle Unit 3 Completion of Power Ascension Testing and Declaration of Commercial Operations ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) 2024-01-31
[Table view] |
Text
Vogtle PEmails From: Patel, Chandu Sent: Friday, February 23, 2018 12:00 PM To: Vogtle PEmails
Subject:
Final RAI for Alt- 7 for Vogtle 3and 4 Attachments: RAI_9393 Final 22318.docx Hi, These are final RAI for alternate 7 (ALT 7) for Vogtle 3 and 4 as we discussed in a meeting held on February 15, 2018. Please respond to these RAI as soon as possible to support our review schedule.
Sincerely, Chandu Patel, Senior Project Manager U.S. NRC, Office of New Reactors NRC/NRO/DNRL/LB4, Washington, DC 20555-0001 301.415.3025 MS T6C20M 1
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 224 Mail Envelope Properties (BN7PR09MB2562246C3791836A5431F9FB82CC0)
Subject:
Final RAI for Alt- 7 for Vogtle 3and 4 Sent Date: 2/23/2018 12:00:04 PM Received Date: 2/23/2018 12:00:07 PM From: Patel, Chandu Created By: Chandu.Patel@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: BN7PR09MB2562.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 396 2/23/2018 12:00:07 PM RAI_9393 Final 22318.docx 27591 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Request for Additional Information 1 Issue Date: 02/23/2018 Application
Title:
VEGP Units 3 and 4 - LARs Operating Company: Southern Nuclear Operating Co.
Docket No.52-025 and 52-026 Review Section: NONE - NO SRP SECTION Application Section:
QUESTIONS NONE-11 In RAI Question 1.a, the NRC staff requested confirmation that the alternative examinations will be performed in accordance with the ASME Code as conditioned in § 50.55a of Title 10 of the Code of Federal Regulations (10 CFR). The NRC staff requests confirmation that the proposed remote VT-1 visual examination will be performed in accordance with ASME Code,Section XI, as conditioned in 10 CFR 50.55a, which requires that a visual examination performed instead of an ultrasonic examination has a magnification that has a resolution sensitivity to resolve 0.044 inch (1.1 mm) lower case characters without an ascender or descender (e.g., a, e, n, v).
NONE-12 In RAI Question 1.b.ii, the NRC staff requested a description of the alternative examinations. The NRC staff requests confirmation that the proposed remote VT-1 visual examination will cover essentially 100 percent of the examination volume for the inlet, outlet, and DVI nozzles as defined in ASME Code,Section XI, Figure IWB-2500-7(b). If not, then provide sketches or some other means detailing the examination volume for the inlet, outlet, and DVI nozzles that will be covered by the proposed remote VT-1 visual examination.
NONE-13 In the letter dated December 8, 2017, SNC stated that the stresses at the nozzle corner region for the Advanced Passive 1000 (AP1000) are similar to the operating fleet. In order to determine whether the operational experience from the current operating fleet applies, the NRC staff requests the following information:
- a. The design stress state and operating stresses at the nozzle corner region from the AP1000 reactor pressure vessel design report for each inlet, outlet, and DVI nozzle. In addition, these stresses should specifically include any thermal cycling and stratification loading for each inlet, outlet, and DVI nozzle.
- b. An evaluation that compares the design stress state and operating stresses at the nozzle corner region for each inlet, outlet, and DVI nozzle of the AP1000 provided in (a) above to the design stress state and operating stresses in the nozzle corner region of similar designed nozzles for the current operating fleet. This should include a discussion of why each inlet, outlet, and DVI nozzle is similar to the operating fleet nozzle designs.