Forwards Application for Amend to License DPR-20,revising Tech Specs Re Administrative Controls.Changes Designed to Strengthen Both Onsite & Offsite Safety Review Functions.Fee Paid
ML18053A597
Person / Time
Site: Palisades 
Issue date: 09/23/1988
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18053A598 List:
References
NUDOCS 8810030146
Download: ML18053A597 (2)


Text

...

~;~*

consumers Power l'OWERINli lllllUllliAN'S PIUllillESS General Offices:

1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 September 23, 1988 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

TECHNICAL SPECIFICATIONS CHANGE REQUEST - ADMINISTRATIVE CONTROLS Kenneth W Berry Director Nuclear Licensing Enclosed is a proposal to change the Palisades Technical Specifications.

The change makes the Plant General Manager the Plant Review Committee (PRC)

Chairman; eliminates the Plant Safety Engineering function; establishes the Plant Safety and Licensing Department organization; and establishes the Nuclear Safety Services Department.

The Plant Safety and Licensing Department will have the responsibility for review of safety evaluations and require those significant to safety to be reviewed by PRC.

The Nuclear Safety Services Department is to be responsible for independent safety reviews and replaces the Nuclear Safety Board.

The proposed changes are designed to strengthen both the onsite and offsite safety review functions.

Consumers Power initiated a discussion of these changes with the NRC staff on July 7, 1988.

A similar proposal has been submitted on the Big Rock Point docket 50-155, License DPR~6, dated September 22, 1988, also incorporating changes related to the Nuclear Safety Services Department.

Changes affecting the removal of the onsite and offsite organization charts for the Palisades Technical Specifications were submitted on September 21, 1988.

Consumers Power Company requests that the Big Rock Point and September 21, 1988 proposed changes be reviewed concurrently with this submittal with the expectation that concurrent approval will allow a rapid and smooth transition of organizational OC0988-0138-NL04 7'

w/check...:ft t£D

' \\

\\

\\

  1. = °'-1 ~;ij(,

Nuclear Regulatory Commission Palisades Plant TSCR - Administrative Controls September 23, 1988 responsibilities.

We also request these changes be addressed at the earliest possible convenience and that the amendment become effective upon issuance.

We are prepared to address any NRC staff concern at your convenience.

A check for $150.00, as required by 10 CFR 170.12, is attached.

Kenneth W Berry Director, Nuclear Licensing CC Administrator, Region III, NRC NRC Resident Inspector - Palisades.

Attachment OC0988-0138-NL04 2