Confirms That 24 H Hold Period Will Be Maintained While Performing Containment Leakage Test Using Mass Point Method in Accordance W/Ansi 45.4,Section 7.6
ML18053A580
Person / Time
Site: Palisades 
Issue date: 09/16/1988
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809220204
Download: ML18053A580 (1)


Text

  • -

I--"~

consumers Power POWERING MICHIGAN'S l'ROliRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 September 16, 1988 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

CONTAINMENT LEAKAGE RATE EXEMPTION REQUEST TO USE THE MASS POINT METHOD Consumers Power Company letter dated September 9, 1988, requested an exemption from 10CFR50, Appendix J, III.A.3 - to permit determination of containment leakage rates using the Mass Point" method as described in ANSI/ANS-56.8, 1987.

The NRC reviewer requested confirmation that a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> hold period is maintained while performing the containment leakage test.

This letter confirms that while utilizing the Mass Point Data Analysis, a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> hold period will be used in accordance with ANSI 45.4, Section 7.6.

Thomas C Bordine Administrator, Nuclear Licensing CC Administrator, Region III, NRC NRC Resident Inspector - Palisades

. (