ML18053A359
| ML18053A359 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/28/1988 |
| From: | Smedley R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8805050140 | |
| Download: ML18053A359 (3) | |
Text
..;
consumers Power POW ERIN&
MICHlliAN'S PRO&RE.SS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 April 28,. 1988 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
COMPLIANCE WITH 10CFR50.48 & 10CFR50 APPENDIX R -
FIRE PROTECTION - ADDITIONAL INFORMATION NRC letter dated April 6, 1988 confirmed that the Palisades Plant* would be inspected on May 9 through 13, 1988 for compliance with 10CFR50, Appendix R.
In addition, the April 6, 1988 NRC letter requested Consumers Power Company to provide by April 25, 1988 or a negotiated date, additional information to enable proper NRC preparation for and performance of that inspection.
During the April 20 and 21, 1988 visit to the Palisades Plant by Mr J Ulie from Region III, the majority of the requested information was provided to and/or reviewed by Mr Ulie.
As agreed to by Mr Ulie and Messers R W Philips and D J Malone of Consumers Power Company, the remainder of the information, was to be submitted by April 28, 1988.
During an April 25, 1988 telephone conversation between Messrs Ulie and Malone, Mr Ulie requested that the remaining information be sent directly to Mr Rudy Hodor at Brookhaven National Laboratory.
As indicated in the attached letter, the remainder of the requested information was transmitted to Mr Hodor on April 28, 1988.
?sm::cs-S:::i Staff Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector - Palisades Mr Rudy Hodor, Brookhaven National Laboratories Attachment OC0488-0113-NL04
consumers Power POW ERIN&
MICHlliAN'S PROliRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 April 28, 1988 Mr Rudy Hodor Brookhaven National Laboratory Department of Nuclear Safety Building 130 Upton, Long Island, NY 11973
Dear Mr Hodor:
Per the request of Mr J Ulie, USNRC Region III, to Mr D J Malone of our Palisades Plant on April 25, 1988, I am forwarding the attached information in support of the May 9 through 13, 1988 inspection of compliance with 10CFRSO Appendix R.
This information is part of that requested by USNRC _letter dated April 6, 1988.
The remainder of the information requested in the above referenced letter was presented to or reviewed by Mr Ulie during his April 20 and 21, 1988 visit to the Palisades Plant.
The requested information is provided as attachments as indicated below:
Attachments 1
2 3
4 5
RWS 88-12 Description Safe Shutdown Analysis, Post-fire Safe Shutdown Pa1.isades Plant Fire Hazards Analysis Palisades Nuclear Plant Consumers Power Company, Revision 1 Palisades Plant 10CFRS0.48(c)(S) Appendix R, IIIG Fire Protection Associated Circuits Analysis Phase I, Alternate Hot Shutdown Circuits Heating Ventilation Air Conditioning (HVAC)
Appendix R, Damage to Alternate Shutdown Equipment (includes References 1-10)
Hi/Lo Pressure Interface Analysis for Palisades 10CFRSO Appendix R Compliance
Brookhaven National Laboratory Palisades Plant Compliance Inspection Information April 28, 1988 Please feel free to contact me if you have any questions regarding the enclosed information.
~.y~~--
Staff Licensing Engineer Nuclear Licensing Department CC J Ulie, NRC Region III (w/o attachment)
Attachment RWS 88-12 2