ML18052B507

From kanterella
Jump to navigation Jump to search
Forwards 1987 Steam Generator Inservice Insp Rept of Eddy Current Testing,Data Evaluation & Tube Repair. Exam of Steam Generators Completed on 880109 W/Final Procedural Acceptance on 880111
ML18052B507
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/08/1988
From: Kuemin J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18052B508 List:
References
NUDOCS 8802120076
Download: ML18052B507 (1)


Text

consumers

  • Power,

POWERINli MICHlliAN'S PROGRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 February 8, 1988

. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

1987 STEAM GENERATOR INSERVICE INSPECTION REPORT The enclosed Steam Generator Inservice Inspection Report is submitted in accordance with Technical Specification 4.14.6.

The inspection began subsequent to a steam generator tube leak which resulted in an orderly plant shutdown on December 4, 1987.

Although referred to as the 1987 report, the examination of the steam generators was completed on January 9, 1988, wfth final procedural acceptance on January 11, 1988.

As described in our letter of January 22, 1988, a total of eighteen steam generator tubes were plugged during the past maintenance and inspection outage.

Two additional tubes, misplugged in 1985, were also plugged.

    • ~

t::::'Kuemin Staff Licensing Engineer cc Administrator, Region III, NRC NRC Resident Inspector - Palisades Attachment

(