MONTHYEARML18066A3251998-11-0909 November 1998 Application for Amend to License DPR-20,deleting CVCS Operability Requirements Currently in LCOs 3.2 & 3.17.6 & Associated Testing Requirements in SRs 4.2 & 4.17 ML18066A1981998-06-17017 June 1998 Application for Amend to License DPR-20,updating TS to Reflect Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1831998-03-13013 March 1998 Revised Application for Amend to License DPR-20,requesting Relocation of TS Section 4.16 Snubber Testing Requirements to Plant Operating Requirements Manual (Orm).Affected Orm Pages Encl ML18065B1781998-03-13013 March 1998 Application for Amend to License DPR-20,changing Auxiliary Feedwater TS to Allow Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A7051997-10-0101 October 1997 Application for Amend to License DPR-20,proposing That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note Re Insp at End of Cycle 12 ML18067A6751997-09-0303 September 1997 Application for Amend to License DPR-20,deleting Snubber Operability Requirements in LCO 3.20 & Snubber Testing Requirements in Surveillance Requirement 4.16 ML18067A6711997-09-0303 September 1997 Application for Amend to License DPR-20,reflecting Capabilities of Installed CR Ventilation Equipment & Emulate Std Tech Specs,C-E Plants,Per NUREG-1432 Requirements for Sys ML18067A4511997-03-26026 March 1997 Application for Amend to License DPR-20,allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065A4891996-02-0606 February 1996 Application for Amend to License DPR-20,requesting to Remove cross-train Testing Requirements from LCO Action Statements ML18065A4381996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS to Allow Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas,To Suppl 951211 Administrative Controls Change Request ML18065A4341996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS Re Primary Coolant Pump Flywheel Insp.Rev 1 to Structural Integrity Assoc,Inc Rept SIR-94-080, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements Encl ML18065A4051996-01-10010 January 1996 Application for Amend to License DPR-20,requesting Exemption from 10CFR50 App J TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3821996-01-0505 January 1996 Application for Amend to License DPR-20,revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3751995-12-27027 December 1995 Application for Amend to License DPR-20,rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3461995-12-11011 December 1995 Application for Amend to License DPR-20,revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 from TS ML18065A3321995-12-0606 December 1995 Application for Amend to License DPR-20,relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1741995-10-17017 October 1995 Application for Amend to License DPR-20,changing Paragraph 2.B.(2) to Ref 10CFR40 & to Allow Use of Source Matls as Reactor Fuel,Rewording Paragraph 2.E & Deleting Paragraph 2.7 & Revising TS Pressurizer Cooldown Limit ML18064A8391995-07-0505 July 1995 Application for Amend to License DPR-20,deleting TS 6.4, Training & Revising TS 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7591995-05-0101 May 1995 Application for Amend to License DPR-20.Amend Would Place Requirements in TS Section 4.7 for Periodic DG Peak Load Tests ML18064A6121995-02-10010 February 1995 Application for Amend to License DPR-20,proposing One Time Deferral of 18-month Refueling Interval Surveillance Tests ML18064A5821995-01-13013 January 1995 Tech Specs Change Request to License DPR-20 Addressing Required Settings & Allowable as Found & as Left Tolerances for Primary & Secondary Safety Valves ML18064A5341994-12-29029 December 1994 Application for Amend to License DPR-20,revising TSs Re Iodine Removal Sys ML18064A5061994-12-13013 December 1994 Application for Amend to License DPR-20,adding Third High Thermal Performance DNB Correlation to Safety Limit 2.1 ML18064A4081994-10-0505 October 1994 Application for Amend to License DPR-20,revising TS Relating to Primary Coolant Sys pressure-temp Limits.Rev 0 to Engineering Analysis EA-A-PAL-92-095-01 & Excerpts from Rosemount Instruction Manual 4515,dtd Jan 1988 Encl ML18059B0961994-07-0707 July 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Intended to Resolve Concerns Arose During NRC Review of Change Request ML18059A9751994-05-0505 May 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Necessary Due to Intervening Amends Containing Listed Differences from Pages Submitted on 930519 ML18059A9321994-04-0707 April 1994 Application for Amend to License DPR-20,requesting TS Change Re Instrumentation & Control Section ML18059A9411994-04-0707 April 1994 Application for Amend to License DPR-20,relocating Cycle Specific Operating Limits to Colr,Per Guidance of GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts. Proposed COLR Encl ML18059A8851994-03-11011 March 1994 Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17 ML18059A3721993-09-0303 September 1993 Changes to 930129 Application for Amend to License DPR-20, Modifying Radial Peaking Factor Limits in TS Table 3.23-2 to Incorporate Appropriate Limits for Modified L Fuel Assemblies Recently Installed in Reactor for Cycle 11 ML18058B8991993-06-25025 June 1993 Revises 921208 Application for Amend to License DPR-20 & Brings Proposed Specifications Closer to Model Tech Specs, While Retaining Necessary plant-specific Differences & Updating Proposed Pages to Reflect Amends 147 & 149 ML18058B7421993-03-29029 March 1993 Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks ML18058B3881993-01-29029 January 1993 Application for Amend to License DPR-20,consisting of Proposed TS Changes to Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11. Offsite Dose Calculations & EMF-92-178, Palisades Cycle 11:Disposition & ... Encl ML18058B3481993-01-19019 January 1993 Application for Amend to License DPR-20,changing Surveillance Interval for Testing Control Rod Drive mechanisms,CRD-20 & CRD-31 from Every Two Wks to Once in Mar 1993 ML18058A5631992-06-22022 June 1992 Suppl to 920317 Application for Amend to License DPR-20, Consisting of Revised Page 3-82 Re Shutdown Cooling ML18058A5561992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Better Coordinate Required Action Statement of Electrical Sys Spec W/Lco to Allow Testing & Loading of DG When Plant Above 325 F But Not Yet Critical ML18058A5491992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Delete Requirements Re Iodine Removal Sys Hydrazine Storage Tank Since Use of Hydrazine No Longer Considered in Current Rev of SRP ML18058A3631992-04-15015 April 1992 Application for Amend to License DPR-20,changing TSs to Incorporate Generic Ltr 90-06 PORV Requirements for Power Operation & Modifying Pcs Overpressure Protection Spec Venting Requirements ML18058A2921992-03-18018 March 1992 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling ML18058A1541992-02-0303 February 1992 Application for Amend to License DPR-20,deleting Three Primary Coolant Pump Testing Requirements & Revising Safety Limits & Limiting Safety Sys Settings Specs to Enhance Clarity of Subj Requirements ML18057B3711991-11-12012 November 1991 Application for Amend to License DPR-20,revising Tech Specs to Remove Schedule for Withdrawal of Reactor Vessel Matl Specimens,Per Generic Ltr 91-01 ML18057B3481991-11-0101 November 1991 Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl ML18057B3061991-09-27027 September 1991 Application for Amend to License DPR-20,proposing Change to Tech Spec 5.2.3.a Re Containment Air Cooler Design,Per 861020 & 870430 Requests ML18057B3021991-09-26026 September 1991 Application for Amend to License DPR-20,consisting of Rev 2 to 890628 Request,In Response to Recommendations of Generic Ltr 88-17 to Add Shutdown Cooling Sys Operability Requirements to Tech Specs ML18057B1681991-07-15015 July 1991 Application for Amend to License DPR-20,requesting Tech Spec Changes in Administrative Controls W/Emphasis on Changes in Engineering ML18057A9821991-06-13013 June 1991 Application for Amend to License DPR-20,revising Tech Specs to Incorporate Change to Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A9631991-05-30030 May 1991 Application for Amend to License DPR-20,changing Tech Specs to Incorporate Change to Reactor Variable High Power Trip setpoint.ANF-90-181, Review & Analysis of SRP Chapter 15 Events for Palisades W/15% Variable High Power... Encl ML18057A9551991-05-28028 May 1991 Application for Amend to License DPR-20,changing Tech Specs Re Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A8881991-05-0101 May 1991 Rev 1 to Application for Amend to License DPR-20,changing TS Re Shutdown Cooling Sys Per Generic Ltr 88-17,by Adding Operability Requirements for Shutdown Cooling Sys & Steam Generators ML18057A8291991-03-25025 March 1991 Application for Amend to License DPR-20,changing Tech Specs Section 4.5.2a(2) & 4.5.2b(3) 1998-06-17
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18066A3251998-11-0909 November 1998 Application for Amend to License DPR-20,deleting CVCS Operability Requirements Currently in LCOs 3.2 & 3.17.6 & Associated Testing Requirements in SRs 4.2 & 4.17 ML18066A1981998-06-17017 June 1998 Application for Amend to License DPR-20,updating TS to Reflect Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1831998-03-13013 March 1998 Revised Application for Amend to License DPR-20,requesting Relocation of TS Section 4.16 Snubber Testing Requirements to Plant Operating Requirements Manual (Orm).Affected Orm Pages Encl ML18065B1781998-03-13013 March 1998 Application for Amend to License DPR-20,changing Auxiliary Feedwater TS to Allow Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A7051997-10-0101 October 1997 Application for Amend to License DPR-20,proposing That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note Re Insp at End of Cycle 12 ML18067A6751997-09-0303 September 1997 Application for Amend to License DPR-20,deleting Snubber Operability Requirements in LCO 3.20 & Snubber Testing Requirements in Surveillance Requirement 4.16 ML18067A6711997-09-0303 September 1997 Application for Amend to License DPR-20,reflecting Capabilities of Installed CR Ventilation Equipment & Emulate Std Tech Specs,C-E Plants,Per NUREG-1432 Requirements for Sys ML18067A4511997-03-26026 March 1997 Application for Amend to License DPR-20,allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065A4891996-02-0606 February 1996 Application for Amend to License DPR-20,requesting to Remove cross-train Testing Requirements from LCO Action Statements ML18065A4381996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS to Allow Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas,To Suppl 951211 Administrative Controls Change Request ML18065A4341996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS Re Primary Coolant Pump Flywheel Insp.Rev 1 to Structural Integrity Assoc,Inc Rept SIR-94-080, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements Encl ML18065A4051996-01-10010 January 1996 Application for Amend to License DPR-20,requesting Exemption from 10CFR50 App J TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3821996-01-0505 January 1996 Application for Amend to License DPR-20,revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3751995-12-27027 December 1995 Application for Amend to License DPR-20,rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3461995-12-11011 December 1995 Application for Amend to License DPR-20,revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 from TS ML18065A3321995-12-0606 December 1995 Application for Amend to License DPR-20,relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1741995-10-17017 October 1995 Application for Amend to License DPR-20,changing Paragraph 2.B.(2) to Ref 10CFR40 & to Allow Use of Source Matls as Reactor Fuel,Rewording Paragraph 2.E & Deleting Paragraph 2.7 & Revising TS Pressurizer Cooldown Limit ML18064A8391995-07-0505 July 1995 Application for Amend to License DPR-20,deleting TS 6.4, Training & Revising TS 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7591995-05-0101 May 1995 Application for Amend to License DPR-20.Amend Would Place Requirements in TS Section 4.7 for Periodic DG Peak Load Tests ML18064A6121995-02-10010 February 1995 Application for Amend to License DPR-20,proposing One Time Deferral of 18-month Refueling Interval Surveillance Tests ML18064A5821995-01-13013 January 1995 Tech Specs Change Request to License DPR-20 Addressing Required Settings & Allowable as Found & as Left Tolerances for Primary & Secondary Safety Valves ML18064A5341994-12-29029 December 1994 Application for Amend to License DPR-20,revising TSs Re Iodine Removal Sys ML18064A5061994-12-13013 December 1994 Application for Amend to License DPR-20,adding Third High Thermal Performance DNB Correlation to Safety Limit 2.1 ML18064A4081994-10-0505 October 1994 Application for Amend to License DPR-20,revising TS Relating to Primary Coolant Sys pressure-temp Limits.Rev 0 to Engineering Analysis EA-A-PAL-92-095-01 & Excerpts from Rosemount Instruction Manual 4515,dtd Jan 1988 Encl ML18059B0961994-07-0707 July 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Intended to Resolve Concerns Arose During NRC Review of Change Request ML18059A9751994-05-0505 May 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Necessary Due to Intervening Amends Containing Listed Differences from Pages Submitted on 930519 ML18059A9321994-04-0707 April 1994 Application for Amend to License DPR-20,requesting TS Change Re Instrumentation & Control Section ML18059A9411994-04-0707 April 1994 Application for Amend to License DPR-20,relocating Cycle Specific Operating Limits to Colr,Per Guidance of GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts. Proposed COLR Encl ML18059A8851994-03-11011 March 1994 Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17 ML18059A3721993-09-0303 September 1993 Changes to 930129 Application for Amend to License DPR-20, Modifying Radial Peaking Factor Limits in TS Table 3.23-2 to Incorporate Appropriate Limits for Modified L Fuel Assemblies Recently Installed in Reactor for Cycle 11 ML18058B8991993-06-25025 June 1993 Revises 921208 Application for Amend to License DPR-20 & Brings Proposed Specifications Closer to Model Tech Specs, While Retaining Necessary plant-specific Differences & Updating Proposed Pages to Reflect Amends 147 & 149 ML18058B7421993-03-29029 March 1993 Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks ML18058B3881993-01-29029 January 1993 Application for Amend to License DPR-20,consisting of Proposed TS Changes to Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11. Offsite Dose Calculations & EMF-92-178, Palisades Cycle 11:Disposition & ... Encl ML18058B3481993-01-19019 January 1993 Application for Amend to License DPR-20,changing Surveillance Interval for Testing Control Rod Drive mechanisms,CRD-20 & CRD-31 from Every Two Wks to Once in Mar 1993 ML18058A5631992-06-22022 June 1992 Suppl to 920317 Application for Amend to License DPR-20, Consisting of Revised Page 3-82 Re Shutdown Cooling ML18058A5561992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Better Coordinate Required Action Statement of Electrical Sys Spec W/Lco to Allow Testing & Loading of DG When Plant Above 325 F But Not Yet Critical ML18058A5491992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Delete Requirements Re Iodine Removal Sys Hydrazine Storage Tank Since Use of Hydrazine No Longer Considered in Current Rev of SRP ML18058A3631992-04-15015 April 1992 Application for Amend to License DPR-20,changing TSs to Incorporate Generic Ltr 90-06 PORV Requirements for Power Operation & Modifying Pcs Overpressure Protection Spec Venting Requirements ML18058A2921992-03-18018 March 1992 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling ML18058A1541992-02-0303 February 1992 Application for Amend to License DPR-20,deleting Three Primary Coolant Pump Testing Requirements & Revising Safety Limits & Limiting Safety Sys Settings Specs to Enhance Clarity of Subj Requirements ML18057B3711991-11-12012 November 1991 Application for Amend to License DPR-20,revising Tech Specs to Remove Schedule for Withdrawal of Reactor Vessel Matl Specimens,Per Generic Ltr 91-01 ML18057B3481991-11-0101 November 1991 Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl ML18057B3061991-09-27027 September 1991 Application for Amend to License DPR-20,proposing Change to Tech Spec 5.2.3.a Re Containment Air Cooler Design,Per 861020 & 870430 Requests ML18057B3021991-09-26026 September 1991 Application for Amend to License DPR-20,consisting of Rev 2 to 890628 Request,In Response to Recommendations of Generic Ltr 88-17 to Add Shutdown Cooling Sys Operability Requirements to Tech Specs ML18057B1681991-07-15015 July 1991 Application for Amend to License DPR-20,requesting Tech Spec Changes in Administrative Controls W/Emphasis on Changes in Engineering ML18057A9821991-06-13013 June 1991 Application for Amend to License DPR-20,revising Tech Specs to Incorporate Change to Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A9631991-05-30030 May 1991 Application for Amend to License DPR-20,changing Tech Specs to Incorporate Change to Reactor Variable High Power Trip setpoint.ANF-90-181, Review & Analysis of SRP Chapter 15 Events for Palisades W/15% Variable High Power... Encl ML18057A9551991-05-28028 May 1991 Application for Amend to License DPR-20,changing Tech Specs Re Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A8881991-05-0101 May 1991 Rev 1 to Application for Amend to License DPR-20,changing TS Re Shutdown Cooling Sys Per Generic Ltr 88-17,by Adding Operability Requirements for Shutdown Cooling Sys & Steam Generators ML18057A8291991-03-25025 March 1991 Application for Amend to License DPR-20,changing Tech Specs Section 4.5.2a(2) & 4.5.2b(3) 1998-06-17
[Table view] |
Text
CONSUMERS POWER COMPANY Docket 50-255 Request for Change to the Technical Specifications License DPR-20 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section I below:
I. Changes A. Change 4.5.4a. to read as follows:
"Tendon inspection shall be accomplished at five-year intervals for the life of the plant. The scheduled inspection dates for all inspections may be varied by not more than plus or minus one year from the base schedule."
B. Delete specifications 4.5.4b., c. and d., and renumber 4.5.4e., f.,
- g. , h. , and i. as 4. 5. 4b. , c. , d. , e. and f."
C. Change re-lettered specification 4.5.4b. (old 4.5.4e.) as follows:
"b. The surveillance tendons shall be randomly but representatively selected from each of the following groups:
- 1. A minimum of 4 dome tendons including one from each dome tendon group.
- 2. A minimum of 4 vertical tendons.
- 3. A minimum of 5 hoop tendons.
II For each inspection, the tendons shall be D. Change re-lettered specification 4.5.4c.l. (old 4.5.4f.l) to read as follows:
"l. Lift-off readings shall be taken for each of the surveillance tendons. The tests shall include the following actions:
(a) One tendon, randomly selected from each group of tendons during each inspection, shall be subjected to essentially complete detensioning to identify broken or damaged wires.
(b) The simultaneous measurement of elongation and jacking force during retensioning shall be made at a minimum of three approximately equally spaced levels of force between the seating force and zero."
OC0887-0139-NL04 f 8709210524 870916 ' I "i ~DR ADOCK 05000255 : f ) .
PDR ,:
f I I
Revised TSCR - Containment Testing 2 Pal,isades Plant E. Delete re-lettered specification 4.5.4c.6. (old 4.5.4f .6)
F. Change re-lettered specification 4.5.4d. (old 4.5.4g.) as follows:
"Following the field testing of 4.5.4c., the following laboratory testing shall be done.
- 1. Three tensile test specimens shall be cut from each of the three inspection wires removed (one from each end and one from the middle). One additional specimen shall be cut from the wire determined by field visual inspection to have the greatest amount of corrosion. Each of the wire samples shall be tested for ultimate strength, yield strength, and elongation.
- 2. The sheathing filler samples shall be taken from each end of each tendon examined. Vertical tendon samples shall be taken from the lower end. Samples shall be thoroughly mixed and analyzed for reserve alkalinity, water content, and concentra-tion of water soluble chlorides, nitrates, and sulfides.
Analyses shall be performed in accordance with the procedures and within the acceptance limits specified in ASME Code Section XI, Table IWL-2525-1.
Procedures shall be established to minimize voids and to assure that the volume of sheathing filler removed has been replaced upon completion of the inspection and amounts documented."
G. Change re-lettered specification 4.5.4e.l. (old 4.5.4h.l.) to read as follows:
"l. The average of all measured tendon forces for each type of tendon shall be equal to or greater than the minimum required prestress level of 584 kips per tendon for dome tendons and 615 kips per tendon for hoop and vertical tendons. The measured force in each individual tendon shall not be less than 95% of the predicted force, or (a) the measured force in not more than one tendon is between 90% and 95% of the predicted force, and (b) The measured forces in two tendons located adjacent to the tendon in (a) above are pot less than 95% of the predicted forces, and (c) the measured forces in all the remaining sample tendons are not less than 95% of the predicted force.
If measured force in any tendon is less than 90% of its predicted force, the tendon shall be completely detensioned and a determination shall be made as to the cause of such an OC0887-0139-NL04
Revised TSCR - Containment Testing 3 Pal,isades Plant occurrence and corrective action shall be taken. In addition, all such tendons shall have their forces measured as additional tendons in the next scheduled inspection period.
The Commission shall be notified in accordance with Paragraph 4.5.4f."
H. Change in re-lettered specification 4.5.4e.3. (old 4.5.4h.3.)
11 Specific13:tion 4. 5. 41." to "Specification 4. 5. 4f."
I. Change re-lettered specification 4.5.4f. (old 4.5.4i.) to read as follows:
"i. If any element of the prestressing system fails to meet the acceptance criteria of 4.5.4e., the reporting provision of Specification 6. 9. 2 shall apply."
J. Change specification 4.5.5 in its entirety, to read:
"4.5.5 End Anchorage Concrete Surveillance
- a. A VT-1 visual examination shall be performed on the end anchorage concrete surface at the surveillance tendon anchor points for signs of cracking, popouts, spalling, or corrosion. Concrete cracks having widths greater than 0.010 inches shall be evaluated and documented.
- b. The end anchorage concrete surveillance inspection interval shall be the same as tendon surveillance period.
- c. Acceptance criteria
- 1. Crack widths shall be measured by using optical comparators or wire feeler gauge. Movements shall be ~easured by using demountable mechanical extensometers.
- 2. Concrete anchorage areas are acceptable if no concrete cracks are wider than 0.010 inches and no signs of new or progressive deterioration since previous inspection are found.
- 3. Concrete surface conditions exceeding those stated in 4.5.5c.2 above shall be evaluated for the effect on tendon and containment structural integrity. The results of evaluation shall be included in the final surveillance report."
K. Delete specifications 4.5.6 "Liner Plate Surveillance" and 4.5.7 "Penetration Surveillance."
L. Revise 4.5 Basis as shown in attached page changes.
OC0887-0139-NL04
Revised TSCR - Containment Testing 4 Paiisades Plant II. Discussion A. Proposed in specification 4.5.4 is the inspection schedule stipulated in the pending ASME B&PV Code,Section XI, Subsection IWL-2400, and stipulated as different allowable interval extension than that in specification 4.0.2.
Deleted are the requirements for surveillance tests that have been previously accomplished. The results of these prior tests are described in the updated FSAR, Section 5.8.8.3.
B. Deleted in old specifications 4.5.4b., e., and d. are out of date surveillance requirements that have been previously accomplished and the results of which are described in the Updated FSAR.
C. Re-lettered 4.5.4b. has been revised to be consistent with a 2%
sample size which is consistent with the ASME Code,Section XI, Subsection IWL-2521-1 and exceeds the sample selection size in 2.2 and 2.3 of Regulatory Guide 1.35 revision 3.
D. Proposed in re-lettered 4.5.4c.l are the new provisions stipulated in the Regulatory Position No. 4 of the proposed revision 3 to Regulatory Guide 1.35 and ASME Code,Section XI, Subsection IWL-2523.1. The new provisions require complete detensioning of only one tendon per each group of the surveillance tendons and additional information which is not covered in the existing Technical Specifications.
E. Re-lettered item 4.5.4c.6 has been superseded by the retension requirement in 4.5.4c.l(b).
F. The changes to re-lettered 4.5.4d.l. and 2. are made to include the additional requirements stipulated in draft ASME B&PV Code,Section XI, Subsection IWL-2523, for tensile test and IWL-2526 for sheathing filler examination, which were not clearly described in the existing Technical Specifications.
G. The changes to re-lettered 4.5.4e.l are made to incorporate the requirement stipulated in the draft ASME B&PV Code,Section XI, Subsection IWL-3221.1 for the acceptance of tendon force. These added requirements clarify the tolerances permissible for lift-off deviation.
H. The change in re-lettered section 4.5.4e.3 are editorial.
I. The change to section 4.5.4f is editorial to align it with the reporting requirements in 6.9.2 and delete obsolete wording.
J. The changes to 4.5.5 are made to incorporate the requirements stipulated in the draft ASME B&PV Code,Section XI, Subsection IWL-2524 and IWL-3221.3 which are more consistent with the overall tendon surveillance activities, rather than as a separate activity.
OC0887-0139-NL04
Revised TSCR - Containment Testing 5 Palisades Plant The change to the inspection interval is intended to eliminate the redundant inspection schedule for end anchorage concrete as sepa-rated from the tendon surveillance schedule to avoid confusion.
K. Specifications 4.5.6 "Liner Plate Surveillance" and 4.5.7 "Penetration Surveillance) contain obsolete requirements that have been previously accomplished and the results of which are described in the Updated FSAR, Section 5.8.8.5.
The Standard Technical Specifications (STS) contain requirements for an examination of containment surfaces, which are similar to these out-of-date requirements. The STS surveillance is accom-plished prior to a Type A, contairiment integrated leak rate test.
However, the STS requirement is also stipulated in 10CFR50 Appendix J, section V.A and is, therefore, unnecessary in the Technical Specifications.
L. Revisions to the Basis section 4.5 are to update the information.
Deletion of the next to last paragraph is consistent with informa-tion in FSAR Section 5.8.8.5.
M. In reference to IWL-252l(b), in Subsection IWL-252l(a) it is stipulated that surveillance tendons shall be randomly selected, preferably in a symmetrical pattern with respect to containment geometry which represents better distribution of tendon population.
However, in Subsection IWL-252l(b) it is stipulated to have a common tendon selected for all surveillance periods which imposes unnecessary cyclic load to this particular tendon that will ulti-mately induce fatigue stress and possibly result in failure to certain tendon wires. We, CPCo, feel that this provision is not technically justified. Currently, IWL Working Group is still working on. the details of this requirement.
Analysis of No Significant Hazards Consideration The proposed revision to the surveillance method incorporates current methods of conducting inservice inspections of prestressed concrete containments. The proposed changes incorporate the revisions agreed upon by the NRC and Consumers Power Company in the resolution of SEP Topic III-7.A as described in the Integrated Plant Safety Assessment, NUREG-0820, October 1982. The revisions to the method of conducting lift-off readings and conducting of the laboratory testing and accept-ance criteria are acceptable methods per the pending ASME B&PV Code,Section XI, Subsection IWL. There are no changes to the physical part of the surveillance field activities. The deletion of several sections in the specifications is considered editorial to remove obsolete requirements that have been previously accomplished and described in the Updated FSAR. As a result, there is no increase in the probability of occurrence or consequences of an accident or malfunction of equipment and the possibility of a new or different accident has not been created.
OC0887-0139-NL04
Revised TSCR - Containment Testing 6 Pa],isades Plant The change does not result in a reduction in the margin of safety as defined in the basis of the Specifications. The revisions in sample size, measurement methods, definition of laboratory testing and acceptance criteria do not result in a reduction in the margin of safety. Additionally, the number of tendons undergoing complete detensioning has been reduced from the previous requirements. This acceptable reduction ensures the margin of safety of the containment structure is not affected by detensioning and retensioning a larger sample than is necessary to conduct an appropriate surveillance program.
III. Conclusion The Palisades Plant Review Committee has reviewed this Technical Specification Change Request and has determined that this change does not involve an unreviewed safety question and, therefore, involves no significant hazards consideration. This change has also been reviewed under the cognizance of the Nuclear Safety Board. A copy of this Technical Specification Change Request has been sent to the State of Michigan official designated to receive such Amendments to the Operating License.
CONSUMERS POWER COMPANY By F W Buckman, Vice President Nuclear Operations Sworn and subscribed to before me this 16th day of September 1987.
Elaine E Buehrer~c Jackson County, Michigan My commission expires October 31, 1989 OC0887-0139-NL04