Forwards Limitorque motor-operated Valve Insp Summary Rept, Environ Qualification Insp Checklist & Limitorque Actuator Data Sheet
ML18052B177
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/01/1987
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8707070514
Download: ML18052B177 (8)


Text

consumers Power POW ERi ii&

lllllCHl&All"S PRO&RESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 July 1, 1987 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

LIMITORQUE MOTOR OPERATED VALVE INSPECTION

SUMMARY

REPORT Consumers Power Company letter dated November 21, 1986, documented the results of the November 17, 1986 meeting with NRC Region III staff concerning our

'Safety-Related Motor Operated valves.

We committed to provide a report which compiled the results of our inspection of the Safety~Related Motor Operated Valves prior to startup from our recent outage.

This commitment was originally targeted for the end of the first quarter 1987.

However, due to the extended outage, resources were not available to meet that due date.

The Senior Resident Inspector at Palisades was updated on June 15, 1987 and June 30, 1987 was established as an approximate due date for this submittal.

Attached to this letter is our Summary Report, the Environmental Qualification Inspection Checklist and the Limitorque Actuator Data Sheet.

Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector - Palisades OC0787-0095-NL02 8707070514 870701 PDR ADOCK 05000255 G

PDR

./pl

, '\\'

INTRODUCTION

..*..i-- ***~ ---* -**"'"-........ -- *****----*.... ~*-*....,............... -*- ~.-*** i... ____ -------.r.. -.:.-..,

1986 OUTAGE

SUMMARY

REPORT LIMITORQUE MOTOR OPERATOR.ACTIVITIES On November 17, 1986 a meeting was held with the NRC Staff at the Region III Offices to discuss Palisades actions on motor operated valves.

As a result of that meeting this report is being submitted to summarize those actions completed to date.

Below is a summary of actions completed prior to startup.

DESCRIPTION OF WORK PERFORMED In the spring of 1986, actions were started to verify grease quality, quantity, condition and type in motor operated valve actuators for subsequent maintenance planning.

These initial grease samples and documentation research with Limi-torque verified that some of the plant actuators contained SUN 50EP grease.

Therefore, all of the plant's environmentally qualified actuators with this grease were either refurbished or regreased as noted in Attachment 1.

Subse-quent walkdowns were performed to check additional grease compartments, obtain valve and actuator data, inspect for proper environmentally qualified subcomponents, and to verify torque switch settings., Environ-mental Qualification Inspection Checklist, and Attachment 3, Limitorque Actuator Data Sheet, were used during the inspections.

In addition, at the time of the above inspection or during other maintenance activities all valve stems associated with Q-Listed actuators were lubricated prior to startup.

During the outage, two valve operators on the HPSI system, VOP-3007 and VOP-3066, were replaced.

Operator VOP-3007 was replaced due to an earlier failure and VOP-3066 was replaced with a spare actuator due to a leaking seal.

The two plant MSIV bypass valve actuators, VOP-0501 and VOP-0510 were rebuilt due to original equipment sizing problems.

In addition, an actuator on the Chemical and Volume Control system, VOP-2140, was also refurbished due to performance problems.

This report does not address the additional activities associated with IEB 85-03 being done in preparation for the 1987 Maintenance Outage. lists all of the plant's Q-Listed Limitorque motor operators.

The attachment designates which operators were regreased or have received other similar maintenance.

The grease in all of the operators listed on Attachment 1 have been sampled for acceptability or have had their grease replaced recently.

The replacement grease being used at Palisades is Exxon Nebula EPO.

MI0687-305A-NL02

MOTOR OPERATED VALVES Containment MOV's - 24 Total VOP-1042A VOP-1043A

  • VOP-3007
  • VOP-3008
  • VOP-3009
  • VOP-3010
  • VOP-3011
  • VOP-3012
  • VOP-3013
  • VOP-3014
  • VOP-3015
  • VOP-3016 VOP-3041 VOP-3045 VOP-3049 VOP-3052
  • VOP-3062
  • VOP-3064
  • VOP-3066
  • VOP-3068
  • VOP-3080
  • VOP-3081
  • VOP-3082
  • VOP-3083 (SMB-000)-Regreased (SMB-000)-Regreased (SMB-00) -Replaced*

(SMB-3)

(SMB-00) -Refurbished (SMB-3)

(SMB-00) -Refurbished (SMB-3)

(SMB-00) -Refurbished (SMB-3)

(SMB-2)

(SMB-2)

(SMB-2)

(SMB-2)

(SMB-2)

(SMB-2)

(SMB-00) -Refurbished (SMB-00) -Regreased (SMB-00) -Replaced (SMB-00) -Refurbished (SMB-0)

(SMB-0)

(SMB-00)

(SMB-00)

Outside Containment VOP-0501 CCW (SMB-000)-Rebuilt VOP-0510 CCW (SMB-000)-Rebuilt

  • VOP-0743 CCW (SMB~OO)
  • VOP-0748 W Safeguards (SMB-00)
  • VOP-0753 CCW (SMB-00)
  • VOP-0754 W Safeguards (SMB-00)
  • VOP-0755 W Safeguards (SMB-00)
  • VOP-0759 W Safeguards (SMB-00)
  • VOP-0760 CCW (SMB-00)
  • VOP-0798 CCW (SMB-00)

VOP-2087 Charging Pump Room (SMB-00) SUN50EP VOP-2140 Boric Acid Tank Storage Room (SMB-00)-Refurbished VOP-2160 Boric Acid Tank Storage Room (SMB-00) SUN50EP VOP-2169 Boric Acid Tank Storage Room (SMB~OO) SUN50EP VOP-2170 Boric Acid Tank Storage Room (SMB-00) SUN50EP VOP-3072 CCW (SMB-00) SUN50EP

  • VOP-3189 W Safeguards (SMB-0)
  • VOP-3190 W Safeguards (SMB-0)
  • VOP-3198 W Safeguards (SMB-0)
  • VOP-3199 W Safeguards (SMB-0)

P0-1745 MER (SMB-000)

P0-1746 MER (SMB-000)

  • EEQ Qualified MOV's MI0687-305A-MA05 tachment 1 age 1 of 1

I, I

. -. -* ***-. --.., ---*...... ~*--*-- *---.. -**-~...-. __....... -... _..... _

EEQ INSPECTION CHECKLIST LIMITORQUE VALVE OPERATORS W/O NUMBER:

EQUIPMENT NUHBER:

1.

!-Drains, Quantity Two 1.1 Are two t-drains i~stalled?

1.2 Can they.be installed?

(ie, does the motor have plugged holes) 1.3 Install two t-drains, if possible, per per SC 86*310.

Two T-Drains installed?

2.

Motor Leads Attatlent 2 Page 1 of 3 Yes/No Yes/No Yes/No 2.1 How many leads are coming from the motor?

Qty:

2.2 How are the three motor leads connected to th~ field wires?

.2.3 If a terminal board is used, giv~ type and manufacturer, if possible.

2.4 Are there leads coming out from a motor heater?

Yes/No 2.5 If yes, are the leads connected to the field wires?.

Yes/No 2.6 If yes, what is the field cable number they are connected to and bow are they connected?

3.

Local Position Indicator 3.1 Is a LPI installed?

3.2 If yes, is it mechanically coupled to the limit switch? (on SMB-0 thru SMB-3 only)

KI1186-0002-MA06 Yes/No Yes/No

  • ** I
4.

Terminal Boards 4.1 Inspect the terminal boards for damage.

4. 1. 1 Is damage visible?

Describe Yes/No 4.2 Record manufacturer and model number, if possible.

5.

Limit Switches 5.1 Inspect the metallic portion of the gear box.

5. 1. 1 Is it aluminum or bronze?

Note: The rotor end is smooth on bronze gear boxes and has casting valleys on aluminum gear boxes.

2 of 3 5.2 Inspect the nonmetallic portions of the limit switch for material color.

5.2.1 Whitish gray?

Yes/No 5.2.2 Brown?

Yes/No 5.2.3 Red?

Yes/No 5.2.4 Black?

Yes/No 5.2.5 Inspect the noametallic portion of the limit switch for any cracks and record the findings.

6.

Torque Switch 6.1 Inspect the non-metallic portion of the torque switch for color.

6.1.1 Whitish Gray?

Yes/No*

6.1.2 Brown?

Yes/No 6.1.3 Red?

Yes/No

6. 1. 4 Black?

Yes/No 6.1.S Inspect the noametallic portions of the limit switch for any cracks and record the findings.

. I

7.

Limit Switch Compartment Heaters 7.1 Are heaters installed?

Yes/No

7. 2 If yes, 7.2.1 Are the leads connected to the field wires?

Yes/No 7.2.2 How are they connected?

7.2.3 What is the field cable number that the leads are connected to?

8.

Grease Relief Val~e 8.1 Is a grease relief valve installed?

8.2 If yes,

8. 2.1 8.2.2 Is the shipping cap removed?

Remove shipping cap.

8.3 If no, install a grease relief valve, if needed, per SC 86*310.

Grease relief valve installed?

KI1186*0002*MA06 Yes/No Yes/No Yes/No 3 of 3

    • -............... - ' -----*---**- ***-~- -

~

.. Page l of 2 LIMITORQUE ACTUATQR O.'\\TA SHEET STYLE MQTOR 'INION GEAR

.SIZE worm SHAq GL~P.

~----~~--~---

SE RI AL NUt*!BE R ----,------

ORDER NUMBER -------

I W L -----------

M 0 TO n:

TH~E.'H1ED SIZE : FOOT POLIN OS NON-RI S I~rn HORSEPOHEn -----

VOLTAGE:

AC -------

DC -------

TOR~UE S~ITCH CALICRATION PLATE:

INSULATION CLASS ------

SP~ING PACK PART NUMBE~ -------

!)UTY RATING --------

NUr.BER OF :*:ASHERS AMPS:

RUN --------

LOCKED ROTOR ----'-

ENCLOSURE SPHD TORQUE S\\H TCH :

FOOT POUNCS -----

TYPE: NUCLEAR ---------

NON-NUCLEAR -----

G!lEt\\SE:

LIMITER PLATE ----------

LI f~IT SWITCH: ' -

HAIN GE~'R BOX -------

L. S. GEAR BOX --~-----

TYPE: NUCLEAR -------

ATTACHED.TO VALVE:

v..

~s

---~N~

NON -NUCLEAR -----

~~NUFACTURER GEARS: 4 C()JNTERS SIIE ------------------

5 COUNTERS ------

STY L: / M 0 D~l ----------------

SIZE:

2 TR'I~*. -------

4 TRAI!f * -------

I

-ge 2 of 2

11.

VALVE lNFORKATlOM THAT ACTUATOR WAS SIZED FOR

l. ftANUFACTURER I ---------------------------
2.

PURCHASE ORDER I : --------------------

DATE : ---------------

3.

VALVE TYPE !BUTTERFLY, SATE, &LOBEi

4.

VALVE SIZE : -------------

5.

STEft -

DIAftETER : ---------, PlTCH : ---------, LEAD : ---------, LEAD - SINGLE I DOUBLE : --------~---

6. LINE TEltPERATURE : ------------
7.

CLOSING TlftE - ftlN. : ----------, STEK SPEED !IN. PER ftlN.1 : -----------

8. LINE DIFFERENCIAL PRESSURE : ------------------
9.

tttttt CALCULATED ACTUATOR. OUTPUT TO OVERCOftE LlNE D.P.tttttt TORQUE <FT.-LB.I : ------------

1 THRUST <LB.I

~~-.

. :.i-n*::

~**,...

~-**