ML18052B120

From kanterella
Jump to navigation Jump to search
Forwards Rev to 840928 Proposed Tech Spec Change Request to License DPR-20,allowing Steam Generator Insp Interval to 24 Months But Can Be Extended to 30 Months Provided Mean Degradation Increase Less than 1%,per NRC Request
ML18052B120
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/05/1987
From: Kuemin J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18052B121 List:
References
NUDOCS 8706090402
Download: ML18052B120 (1)


Text

....

\.,

consumers Power POWERiNii NllCHlliAN'S PROGRESS General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-0550 June 5, 1987 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

TECHNICAL SPECIFICATIONS CHANGE REQUEST - REVISION STEAM GENERATOR INSPECTION INTERVAL Consumers Power Company proposed a Technical Specifications Change Request on September 28, 1984 which included a revision to the Steam Generator inspection interval to 30 months. We wish to revise that proposal to state that the interval will be 24 months but can be extended to 30 months provided that the mean degradation increase of the Steam Generator tubes for the previous Steam Generator inspection interval was less than 1%. This is indicative of essentially no degradation.

This change is provided in response to concerns raised by the NRC reviewer.

Revised page changes are attached which include a modified format. Two pages from the previous submittal are not included as they were not affected by the revision or modified format *

~~

~Kuemin

~~~::: ~icensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector - Palisades Attachment I, ~6~6090402 870605 Pi . ADOCK 05000255 I;

J

- ' - j J_

OC0687-0085-NL04