10 CPR 50.4(b)(l)
February 7, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units 1 and 2 An EnergySofutions Company Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304
Subject:
License Termination Plan Request for Additional Information
References:
ZS-2018-0008
- 1) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Amendment Request for the License Termination Plan",
dated December 19, 2014
- 2) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Update of the Site-Specific Decommissioning Costs", dated February 26, 2015
- 3) John B. Hickman, U.S. Nuclear Regulatory Commission, Letter to John Sauger, ZionSolutions, "Request for Additional Information Related to the License Termination Plan for Zion Nuclear Power Station, Units 1 and 2,"
dated December 10, 2015
- 4) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Request for Additional Information",
dated March 8, 2016
- 5) John B. Hickman, U.S. Nuclear Regulatory Commission, Letter to John Sauger, ZionSolutions, "Request for Additional Information Related to the License Termination Plan for Zion Nuclear Power Station, Units 1 and 2," dated May 31, 2016
- 6) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Request for Additional Information",
dated July 20, 2016
- 7) John B. Hickman, U.S. Nuclear Regulatory Commission, Letter to John Sauger,.
ZionSolutions, "Request for Additional Information Related to the License Tennination Plan for Zion Nuclear Power Station, Units 1 and 2,"
dated November 30, 2016
- 8) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Request for Additional Information",
dated July 20, 2017
- 9) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan, Revision 2", dated February 7, 2018
. /J ivf.S 5 D /
101 Shiloh Boulevard, Zion* IL 60099 (224) 789-4016
- Fax: (224) 789-4008
- www.zionsolutionscompany.com
ZionSolutions, LLC ZS-2018-0008 Page2 of2 Revision 2 of the Zion Station License Termination Plan (LTP) was submitted to the U.S Nuclear Regulatory Commission (NRC) for review on February 7, 2018 as documented in Reference 9. This letter provides additional support documentation to assist in the review of LTP, Revision 2. Note that the procedures provided in this submittal do not estabiish methodology used in the site restoration process. The methodology is defined in the LTP and implemented though the use of controlled documents including those contained in this submittal.
The support documents are contained in Enclosure 1. Enclosure 2 contains a preflight' report for *.
There are no regulatory commitments made in this submittal. If you should have any questions regarding this submittal, please contact me at (860) 462-9707.
Respectfully, fc,v-ard van Noordennen ice President Regulatory Affairs
Enclosures:
- Support Documentation containing:
RAI Set 3 Revised Responses Response to October 10, 2017 NRC Review Comments TSD List TSD-14-022, Revision 1, Use ofln-Situ.Gamma Spectroscopy for FSS of End State Structures TSD-17-004, Revision 3, Operational Derived Concentration Guideline Levels for FSS TSD-17-007, Revision 1, Evaluation of Static Measurements Performed for URS of*
Building Material Used for Backfill at Zion TSD-17-010, Revision I, Final Report-Unconditional Release Survey at Zion Station
. Restoration Project ZS-LT-02, Revision 3, Characterization Survey Plan
- ZS-LT-100-001-001, Revision 2, Characterization Survey Package Development ISOCS Circulating Water Discharge Tunnel Geometry ISOCS Circulating Water Intake Pipe Geometry : Preflight Report for Enclosure 1 to this submittal cc:
John Hickman, U.S. NRC Senior Project Manager (1 hard copy and 2 CDs of the enclosures)
Regional Administrator, U.S. NRC, Region III (1 hard copy and 1 CD of the enclosures)
Service List (Cover l~tter only, no enclosures)
Zion Nu~lear Power Station, Unit 1 and 2 License Transfer Service List cc:
Ken Robuck Group President Disposal and Decommissioning Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger Executive VP & Chief Nuclear Officer ReactorD&D Energy Solutions 2701 Deborah Avenue Zion, IL 60099 Bruce Hinkley General Manager ZionSolutions, LLC 2701 Deborah Avenue Zion, IL 60099 Gerard van Noordennen VP Regulatory Affairs Energy Solutions 2701 Deborah Avenue Zion, IL 60099 Jerry Houff
. Decommissioning Plant Manager ZionSolutions, LLC 2701 Deborah Avep.ue Zion, IL 60099 Dan Shrum Senior VP Regulatory Affairs Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Ken Evans Section Head, Nuclear Facility Inspection Bureau, of Nuclear Facility Safety Illinois Emergency Management Agency 1035 Outerpark Drive Springfield, IL 62704'
- Kelly F. Grahn Senior Health Physicist, Unit Supervisor Bureau of Radiation Safety, Environmental Management Illinois Emergency Management Agency 245 W Roosevelt Road, Building 8, Suite 55 West Chicago, IL 60185 William P. Mazzeno Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue Libertyville, IL 60048-1308 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW
- Washington, DC 20004
__ __J
! I Support Documentation PDF file on attached CD
.. *~-.. -*....... -*- ---... '
\\ '
Zion Station ~es~oration Project License Termination Plan Supplementt_ *~ Q=-~o-_c _umentation
- Ri\\vision 2 Y,ebt,uaey 20~,
,/
I
' \\
y_
/,
i 1*
l :,
Preflight Report for Enclosure 1
ZionSolutions, LLC ZS-2018-0008: Enclosure 2 Page 1 of2 This document serves as preflight report for Enclosure 1 to ZS-2018-0008 submittal. The following files do not.pass pre-flight criteria or do not meet NRC criteria, but text is word searchable with clarity/legibility of high quality.
Reference Document Name File Name Preflight Reason Status RAJ Set 3 Revised Responses RAJ Set 3 Revised Responses.pdf Passed Response to October 10, 2017 NRC NRC LTP Reponses Letter.pdf Passed Review Comments TSD List LTP TSDs and Revisions.pdf Passed TSD-14-022, Revision 1, Use of In-Situ TSD-14-022 Rev 1 Use of In-Situ Document contains logos, graphs, Gamma Spectroscopy for FSS of End State Gamma Spectroscopy for FSS of End Failed drawings, screen shots, signatures and maps< 300 ppi, clear and Structures State Structures.pdf legible TSD-17-004, Revision 3, Operational TSD-1 7-004 Rev 3 _ Operational Document contains logos and Derived Concentration Guideline Levels Derived Concentration Guideline Failed signatures< 300 ppi, clear and forFSS Levels for FSS.pdf legible TSD-17-007, Revision 1, Evaluation of TSD-17-007 Rev 1 Eval of Static Document contains logos and Measurements Performed for URS of Static Measurements Performed for URS of Bldg Material Used for Backfill at Failed signatures< 300 ppi, clear and Building Material Used for Backfill at Zion Zion.pdf legible TSD-17-010, Revision!, Final Report-TSD-17-010 Rev 1 _ Final Report -
Document contains logos, graphs, Unconditional Release Survey at Zion Unconditional Release Survey at Zion Failed drawings, photos, signatures and/or Station Restoration Project Station Restoration Project.pdf maps< 300 ppi, clear and legible Document contains logos, graphs, ZS-LT-02, Revision 3, Characterization ZS-LT-02 Rev 3 Characterization Failed drawings, photos~ scanned signatures Survey Plan Survey Plan. pdf and/or maps < 300 ppi, clear and lemble Document contains logos, graphs, ZS-LT-100-001-001, Revision 2, ZS-LT-100-001-001 Rev
~
Characterization Survey Package 2 _ Characterization Survey Package Failed drawings, photos, scanned signatures and/or maps< 300 ppi, clear and Development Development.pdf legible
ZionSolutions, LLC ZS-2018-0008: Enclosure 2 Page 2 of2 Reference Document Name ISOCS Circulating Water Discharge Tunnel Geometry ISO CS Circulating Water Intake Pipe Geometry File Name Circ Water Discharge Tunnel Geometry.pdf Circ Water Intake Pipe Geometry.pdf Preflight Reason Status Failed Document contains scanned pages <
300 ppi, clear and legible Failed Document contains scanned pages <
300 ppi, clear and legible