ML18052A530

From kanterella
Jump to navigation Jump to search
Solutions, LLC License Termination Plan Request for Additional Information
ML18052A530
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/07/2018
From: Gerard van Noordennen
ZionSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
ZS-2018-0008
Download: ML18052A530 (7)


Text

An EnergySofutions Company 10 CPR 50.4(b)(l)

February 7, 2016 ZS-2018-0008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Subject:

License Termination Plan Request for Additional Information

References:

1) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Amendment Request for the License Termination Plan",

dated December 19, 2014

2) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Update of the Site-Specific Decommissioning Costs", dated February 26, 2015
3) John B. Hickman, U.S. Nuclear Regulatory Commission, Letter to John Sauger, ZionSolutions, "Request for Additional Information Related to the License Termination Plan for Zion Nuclear Power Station, Units 1 and 2,"

dated December 10, 2015

4) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Request for Additional Information",

dated March 8, 2016

5) John B. Hickman, U.S. Nuclear Regulatory Commission, Letter to John Sauger, ZionSolutions, "Request for Additional Information Related to the License Termination Plan for Zion Nuclear Power Station, Units 1 and 2," dated May 31, 2016
6) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Request for Additional Information",

dated July 20, 2016

7) John B. Hickman, U.S. Nuclear Regulatory Commission, Letter to John Sauger,.

ZionSolutions, "Request for Additional Information Related to the License Tennination Plan for Zion Nuclear Power Station, Units 1 and 2,"

dated November 30, 2016

8) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Request for Additional Information",

dated July 20, 2017

9) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan, Revision 2", dated February 7, 2018 . /J ivf .S 5 D /

101 Shiloh Boulevard, Zion* IL 60099 (224) 789-4016

  • Fax: (224) 789-4008
  • www.zionsolutionscompany.com

ZionSolutions, LLC ZS-2018-0008 Page2 of2 Revision 2 of the Zion Station License Termination Plan (LTP) was submitted to the U.S Nuclear Regulatory Commission (NRC) for review on February 7, 2018 as documented in Reference 9. This letter provides additional support documentation to assist in the review of LTP, Revision 2. Note that the procedures provided in this submittal do not estabiish methodology used in the site restoration process. The methodology is defined in the LTP and implemented though the use of controlled documents including those contained in this submittal.

The support documents are contained in Enclosure 1. Enclosure 2 contains a preflight' report for

  • Enclosure 1.

There are no regulatory commitments made in this submittal. If you should have any questions regarding this submittal, please contact me at (860) 462-9707.

Respectfully, fc,v- ard van Noordennen ice President Regulatory Affairs

Enclosures:

Enclosure 1: Support Documentation containing:

  • RAI Set 3 Revised Responses
  • Response to October 10, 2017 NRC Review Comments
  • TSD List
  • TSD-14-022, Revision 1, Use ofln-Situ.Gamma Spectroscopy for FSS of End State Structures
  • TSD-17-004, Revision 3, Operational Derived Concentration Guideline Levels for FSS .
  • TSD-17-007, Revision 1, Evaluation of Static Measurements Performed for URS of*

Building Material Used for Backfill at Zion

  • TSD-17-010, Revision I, Final Report-Unconditional Release Survey at Zion Station

. Restoration Project

  • ZS-LT-02, Revision 3, Characterization Survey Plan
  • ZS-LT-100-001-001, Revision 2, Characterization Survey Package Development
  • ISOCS Circulating Water Discharge Tunnel Geometry
  • ISOCS Circulating Water Intake Pipe Geometry Enclosure 2: Preflight Report for Enclosure 1 to this submittal cc: John Hickman, U.S. NRC Senior Project Manager (1 hard copy and 2 CDs of the enclosures)

Regional Administrator, U.S. NRC, Region III (1 hard copy and 1 CD of the enclosures)

Service List (Cover l~tter only, no enclosures)

Zion Nu~lear Power Station, Unit 1 and 2 License Transfer Service List cc:

Ken Robuck Russ Workman Group President Disposal and General Counsel Decommissioning EnergySolutions EnergySolutions 299 South Main Street, Suite 1700 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Salt Lake City, UT 84111 Ken Evans John Sauger Section Head, Nuclear Facility Inspection Executive VP & Chief Nuclear Officer Bureau, of Nuclear Facility Safety ReactorD&D Illinois Emergency Management Agency EnergySolutions 1035 Outerpark Drive 2701 Deborah Avenue Springfield, IL 62704' Zion, IL 60099

  • Kelly F. Grahn Bruce Hinkley Senior Health Physicist, Unit Supervisor General Manager Bureau of Radiation Safety, Environmental ZionSolutions, LLC Management 2701 Deborah Avenue Illinois Emergency Management Agency Zion, IL 60099 245 W Roosevelt Road, Building 8, Suite 55 West Chicago, IL 60185 Gerard van Noordennen VP Regulatory Affairs William P. Mazzeno EnergySolutions Emergency Management Coordinator 2701 Deborah Avenue Lake County Emergency Management Zion, IL 60099 Agency 1303 N. Milwaukee Avenue Jerry Houff Libertyville, IL 60048-1308

. Decommissioning Plant Manager ZionSolutions, LLC Regional Administrator 2701 Deborah Avep.ue U.S. NRC, Region III Zion, IL 60099 2443 Warrenville Road Lisle, IL 60532-4352 Dan Shrum Senior VP Regulatory Affairs John E. Matthews EnergySolutions Morgan, Lewis & Bockius LLP 299 South Main Street, Suite 1700 1111 Pennsylvania Avenue, NW

__ _ _ J

Enclosure 1 Support Documentation PDF file on attached CD

..*~- .. -* ....... -*- ---... '

! I y_

/,

\

i 1*

l Zion Station ~es~oration Project License Termination Plan Supplementt_*~ Q=-~o-_c_umentation

.

  • Ri\vision 2

_ Y,ebt,uaey 20~,

I

,/ ', '

\

Enclosure 2 Preflight Report for Enclosure 1

ZionSolutions, LLC ZS-2018-0008: Enclosure 2 Page 1 of2 This document serves as preflight report for Enclosure 1 to ZS-2018-0008 submittal. The following files do not.pass pre-flight criteria or do not meet NRC criteria, but text is word searchable with clarity/legibility of high quality.

Preflight Reference Document Name File Name Reason Status RAJ Set 3 Revised Responses RAJ Set 3 Revised Responses.pdf Passed Response to October 10, 2017 NRC -

NRC LTP Reponses Letter.pdf Passed Review Comments TSD List LTP TSDs and Revisions.pdf Passed Document contains logos, graphs, TSD-14-022, Revision 1, Use of In-Situ TSD-14-022 Rev 1 Use of In-Situ drawings, screen shots, signatures Gamma Spectroscopy for FSS of End State Gamma Spectroscopy for FSS of End Failed and maps< 300 ppi, clear and Structures State Structures.pdf legible TSD-17-004, Revision 3, Operational TSD-1 7-004 Rev 3_ Operational Document contains logos and Derived Concentration Guideline Levels Derived Concentration Guideline Failed signatures< 300 ppi, clear and forFSS Levels for FSS.pdf legible TSD-17-007 Rev 1 Eval of Static TSD-17-007, Revision 1, Evaluation of Document contains logos and Measurements Performed for URS of Static Measurements Performed for URS of Failed signatures< 300 ppi, clear and Bldg Material Used for Backfill at Building Material Used for Backfill at Zion legible Zion.pdf TSD-17-010, Revision!, Final Report- TSD-17-010 Rev 1_ Final Report - Document contains logos, graphs, Unconditional Release Survey at Zion Unconditional Release Survey at Zion Failed drawings, photos, signatures and/or Station Restoration Project Station Restoration Project.pdf maps< 300 ppi, clear and legible Document contains logos, graphs, ZS-LT-02, Revision 3, Characterization ZS-LT-02 Rev 3 Characterization drawings, photos~ scanned signatures Failed Survey Plan Survey Plan. pdf and/or maps < 300 ppi, clear and lemble

' Document contains logos, graphs, ZS-LT-100-001-001, Revision 2, ZS-LT-100-001-001 Rev ~

drawings, photos, scanned signatures Characterization Survey Package 2_ Characterization Survey Package Failed and/or maps< 300 ppi, clear and Development Development.pdf legible

ZionSolutions, LLC ZS-2018-0008: Enclosure 2 Page 2 of2 Preflight Reference Document Name File Name Reason Status ISOCS Circulating Water Discharge Circ Water Discharge Tunnel Document contains scanned pages <

Failed Tunnel Geometry Geometry.pdf 300 ppi, clear and legible ISO CS Circulating Water Intake Pipe Document contains scanned pages <

Circ Water Intake Pipe Geometry.pdf Failed Geometry 300 ppi, clear and legible