'-i' consumers Power company General Offices: 1945 West Parnell Road, *Jackson, Ml 49201 *.{517J 766-0550 December 20, 1985 Director, Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
PHYSICS TEST PROGRAM The. physics test program to be utilized for Cycle 7 start-up is attached.
This is the first revision to the Palisades Plant Physics test program since Cycle 4 submitted Octob~r 31, 1979.
The test program has been revised to bring it into alignment with the newly developed ANS 19.6 and to reflect more recent general industry practices at PWRs.
The procedure retains both the "review" and "acceptance" criterion for each test and maintains the commitments with regard to remedial action in case a criterion is exceeded.
The attached program is provided for your information.
~/.~
t1'James L Kuemin Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades
~g~22402s1 ss1220
\\
p ADOCK 05000255- ! l PDR L\\
OC1285-0006-NL02 I
I.
Tests and Test Criteria A.
Low Power Tests Measured Parameter ARO HZP Critical Boron Concentration
(
Differential Soluble Boron WortI:i/Reference Rod Group Worth Control Rod Group Worths by Rod Swapping Method STARTUP PHYSICS TEST PROGRAM PALISADES PLANT Review Criterion Within 50 Ppm of Prediction Within 15 ppm/% 6p of Predicted/
Within +/- 10~ of Predicted Reference Rod Group Worth Individual Group within +/- 15% or
+/-.15% 6p of predicted, whichever is greater.
Sum of Groups +/- 10%
(Reference Rod troup should be within +/- 10% by Boron dilution method)
Moderator Temperature Coefficient
( ITC) all rods withdrawn Within 5 X 10 - 5 6p/°F of the Predicted Value Acceptance Criterion None, however,Tech Spec limit applies to total reactivity anomolies.
Less than 125 ppm/% 6p Sum of groups within +/-
of predicted 10%
-5 Between + 5 ~5 10 6p/°F and -35 X 10 6p/°F when extropolated to full power Flux Symmetry at Power ~ 30%
Symmetric locations within +/- 10%
None a) Incore flux measurement Deviation between the highest and lowest values in symmetric locations and deviations from predicted
- values for locations greater than 0.9 relative power.
OC1285-0006-NL02 Assembly Power within +/- 10% of prediction if relative power ~ 0.9.
Mea*sured Parameter B.
Intermediate Power Level Power Distribution Power 40 -
75%
C.
Full Power Power Distribution at 90 - 100 % FP
OC1285-0006-:NL02 Review Criterion Quadrant Tilt ~ 3 %
Assembly Power +/- 10% of Prediction if Rel. Power >.9
+/- 15% of Prediction if Rel.
Power *:.l. 9 Assembly Power RMS Deviation ::! 5%
Same as Intermediate Power Level Within 50 ppm of predicted Acceptance Criterion Power Distribution Technical Specificatqns are met Same as Intermediate Power Level None, however, Tech Spec limit applies to total reactivity anomolies.
- r' START-UP PHYSICS TEST PROGRAM Palisades Plant II.
REMEDIAL ACTION A.
REVIEW CRITERIA Failure to meet a test result review criterion is an indication that there may be some deficiency in the test, prediction or core loading.
If a test result falls outside the review criterion, an engineering review will be conducted to determine the reason for the deviation and its impact on reactor safety.
Such a review may consist of, but not be limited to, a review of the test and equipment, a repeat of the measurement, a review of the predictive calculation, a correlation with the results of other tests and/or a review of the results of testing from previous cycles.
B.
ACCEPTANCE CRITERIA Failure to meet an acceptance criterion indicates that a deficiency exists which may result in a violation of technical specification limits.
In such a case, further operation shall beappropriately restricted to maintain margins of safety.
An engineering review as described above shall be conducted to determine the cause.of the
. deviation and appropriate corrective actio~.
In the case of rod worths, the worth of an additional rod bank will be measured.
The Plant Review Committee will review the action taken and disposition of the deviation before commencement of normal operation.
OC1285-0006-NL02