ML18051B353

From kanterella
Jump to navigation Jump to search
Confirms That Newly Installed 8 H Emergency Lights Operational & Will Be Declared Operable Before End of May 1985,per 841001 Commitment & 10CFR50,App R Requirements
ML18051B353
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/30/1985
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8505020434
Download: ML18051B353 (1)


Text

consumers Power company General Offices: 1945 West Parnell Road, Jackson, Ml 49201 *:1517) 1aa-osso April 30, 1985

Director, Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

FIRE PROTECTION - COMPLIANCE - 10CFR50.48 AND APPENDIX R TO 10CFR50 - EMERGENCY LIGHTS Attachment lC to Consumers Power Company's submittal dated October 1, 1984 indicates that additional permanent eight hour emergency lights were scheduled to be operational by the end of April 1985. This submittal confirms that the newly installed 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> emergency lights are operational and will be declared operable (ie, Technical Specifications Surveillance Tests complete and accepted by the Operations Department) before the end of May.

1985.

Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades r asoso~oD~4oE~-~~g~~g55 PDR F .

PDR

\f'\

.~

OC0485-0188A-NL04