ML18051A909
| ML18051A909 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 05/30/1984 |
| From: | Johnson B Consumers Energy Co, (Formerly Consumers Power Co) |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18051A910 | List: |
| References | |
| NUDOCS 8406060192 | |
| Download: ML18051A909 (1) | |
Text
r' General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-0550
_/Ma-Y 30, 1984
/"'
Dennis M Crutchfield, Chief Operating Reactor Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - REPORT OF EDDY CURRENT TESTING, DATA EVALUATIONS, AND TUBE PLUGGING.
The attached report entitled "Final Report 1983-1984 Palisades Steam Generator Eddy Current In-Service Inspection," summarizes the Eddy Current Testing (ET) program and results obtained for the Palisades Steam Generator (S/G)
Inspection which occurred during the period of August 30, 1983 to April 30, 1984.
The information in this report is submitted in accordance with the Palisades Plant Technical Specifications Section 4.14.6 and demonstrates compliance with the requirements of"_'.l'ec:hn_icci.l. Specification 4.14.
,:, -.. c,-:.-:._;:--,\\-.,,~*
2*.~;'.::-..*~/:: *'.*,*
The NIS-1 Owner's D:~:~*::k~~~'.i{i,or Inservice Inspection will be submitted -as an addenda to this repbtti'*a:Et'ei-;':di.e review of the Final Report and Record by the authorized inspectof,{:'~Ti{if.-iar:m is not addressed in the Technical Specifica-tions but is requir~<l-'J?y: s'e:ction XI of the ASME Code to be submitted within 90 days of completion of/tliE;i~-:it:Us~rvice inspection.
r**.;// --~-
OC0584-Q020A-NLO~
8406060192 840530 PDR ADOCK 0500025-5_
G PDR
(."I'