ML18051A829

From kanterella
Jump to navigation Jump to search
Requests Extension to Respond to Generic Ltr 83-28 to Reflect Extension of Current Refueling Outage.Work Necessary to Address Remaining Issues Will Commence 60 Days After End of Current Refueling Outage
ML18051A829
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/22/1984
From: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GL-83-28, NUDOCS 8403260115
Download: ML18051A829 (2)


Text

.. ---

. r consumers Power company General Offices: 1945 West _Parnall Raad, Jackson, Ml 49201 * {517) 7$$-0550 March 22, 1984 Darrell G Eisenhut, Director Division of Licensing Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR

This 'letter requests that the submittal dates of that schedule be deferred.

At the time of our November 7, 1984 submittal the Palisades Plant was in a refueling outage which was scheduled to be completed by December, 1983 with Generic Letter 83-28 activities expected to begin 60 days following the end of the refueling outage.

The start of Generic Letter 83-28 activities followed the end of the refueling outage because much of the manpower necessary for addressing the concerns of the Generic Letter was also required to support the outage.

Thus the plan and schedule for Generic Letter 83-28 reflected, and was dependent upon, the completion of the refueling outage.

Subsequent to our November 7, 1983 submittal the scope and duration of the Palisades refueling outage were significantly increased due to the discovery of a number of new in,dications of defects in the steam generator tubes.

An extensive program, which included tube removal for analysis, was begun to resolve the concerns with the steam gen~rators. As a consequence, much of the manpower originally scheduled to address the remaining issues of Generic Letter 83-28 was diverted to the steam generator repair project.

8403260115 840322 PDR ADOCK 05000255 P

PDR OC0384-0001AA-NL02

-~

Darrell G Eisenhut, Director Palisades Plant EXTENSION REQUEST FOR GENERIC LETTER 83-28 March* 22, 1984 2

Consumers Power Company requests that the dates submitted in our November 7, 1983 response to Generic Letter 83-28 be deferred to reflect the extension of the current refueling outage.

Consumers Power Company expects to commence the work necessary to address the remaining issues of Generic Letter 83-28 60 days after the end of the current refueling outage. A revised completion schedule will be submitted at that time.

iJ()JJrd ~ ~riWiL

~~id J~ndeWalle Director, Nuclear Licensing CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection & Enforcement Administrator, Region III, USNRC NRC Resident Inspector - Palisades OC0384-0001AA-NL02