ML18047A202

From kanterella
Jump to navigation Jump to search
NRC Presentation on PRA Acceptability 180216
ML18047A202
Person / Time
Issue date: 02/16/2018
From: Anders Gilbertson
NRC/RES/DRA/PRB
To:
References
Download: ML18047A202 (8)


Text

Public Meeting on the NRC Staff Plans for Implementation of the Term PRA Acceptability Anders Gilbertson Reliability and Risk Analyst RES/DRA/PRB Anders.Gilbertson@nrc.gov February 21, 2018

Overview

  • Background

Background (1 of 2)

  • Differing professional opinion1 (DPO)

DPO-2016-0012 raised the issue that different terms are used when discussing the ability of a PRA to support risk-informed regulatory decisionmaking 3 of 9 NRC Staff Plans for Implementation of the Term PRA Acceptability 2/21/18 1

The DPO Program is governed by the NRCs Management Directive 10.159 (see Agencywide Document Access and Management System (ADAMS) accession number ML15132A664) which allows staff and contractors to have their differing views considered by the highest levels of management.

2 The DPO-2016-001 case file may be accessed in ADAMS under accession number ML17013A015.

Background (2 of 2)

  • A panel of U.S. Nuclear Regulatory Commission (NRC) PRA experts was convened to evaluate the issue raised in the DPO
  • In response to the DPO, NRC Senior Management decided that the term PRA acceptability should be used consistently in NRC documents and information
  • The management decision was upheld through the DPO appeal process 4 of 9 NRC Staff Plans for Implementation of the Term PRA Acceptability 2/21/18

Implementation of the Term PRA Acceptability (1 of 4)

  • The staff will consistently use the term PRA acceptability rather than terms such as PRA quality or technical adequacy to describe the overall goodness of a PRA in risk-informed regulatory decisionmaking
  • PRA acceptability is measured in terms of:

- Scope

- Conformance to the technical elements of a PRA

- Level of detail

- Plant representation 5 of 9 NRC Staff Plans for Implementation of the Term PRA Acceptability 2/21/18

Implementation of the Term PRA Acceptability (2 of 4)

  • Implementing the term PRA acceptability will involve revising:

- Regulatory guidance (e.g., regulatory guides, NUREGs, etc.)

- Standard review plans

- Training materials

- Other information supporting the NRCs regulatory program (e.g., NRC online glossary)

  • Revisions will be performed consistent with the NRCs planned revision schedules 6 of 9 NRC Staff Plans for Implementation of the Term PRA Acceptability 2/21/18

Implementation of the Term PRA Acceptability (3 of 4)

  • Implementing the term PRA acceptability only affects the NRCs usage of terms; this change does not:

- Change any regulatory processes (e.g., review methods, criteria for acceptability, etc.)

- Require or compel, nor is it intended to suggest, that the nuclear industry make conforming changes 7 of 9 NRC Staff Plans for Implementation of the Term PRA Acceptability 2/21/18

Implementation of the Term PRA Acceptability (4 of 4)

  • Planned revisions of NRC documents related to this implementation will be coordinated with the public and stakeholders, as appropriate
  • Staff will ensure revisions are consistent with backfit requirements in Title 10 of the Code of Federal Regulations Section 50.109 8 of 9 NRC Staff Plans for Implementation of the Term PRA Acceptability 2/21/18