Requests Use of General Ofc Control Ctr as Temporary Emergency Operations Facility (EOF) for Periods Up to 6-h While Establishing Manning of Permanent Eof.Basis for Request Encl
ML18046B211
Person / Time
Site: Palisades 
Issue date: 01/04/1982
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8201180373
Download: ML18046B211 (2)


Text

-. ~..,...,..

consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Ml 49201 * (517) 788-0550 January 4, l982 James G Keppler, AdJ:ninistrator Office of Inspection and Enforcement Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60l37 DOCKET 50-255 - LICENSE DPR

  • RECEIVED JAN l '51982~

Ml 8H£UAR DW!!RY cur.iltla 16mlim rm:Amim u Tille

'J PALISADES PLANT -

REQUEST FOR USE OF A TEMPORARY EMERGENCY OPERATIONS FACILITY Consumers Power Company letter dated November 6, 198l and entitled "Response to October 7, l98l Confirmation of Action Letter", indicated that we submit a formal request for use of the General Office Control Center (GOCC) as a temporary Emergency Operations Facility (EOF) for periods of up to six hours while establishing manning of the permanent EOF.

We hereby make that request, and provide the following basis for such action.

BASIS Consumers Power Company feels strongly that manning of onsite plant technical and operational support positions with locally available plant staff personnel has priority over immediate manning of the local EOF's.

Senior plant personnel who would be capable of responding within one hour to act as EOF Director and as the required EOF support staff are not available due to the higher priorities of onsite plant support.

On the other hand, qualified General Office personnel may require up to six hours travel time in severe weather to reach the permanent EOF's.

The alternative we propose is to provide temporary EOF support facilities at the GOCC until the permanent EOF is manned by assigned General Office personnel.

We agree to provide plant critical function display parameters as well as the other communications and data transmittal equipment now installed at the GOCC.

However, we do not expect to meet those requirements of NUREG-0696 which obviously do not apply to a temporary remote facility.

For example, we propose to provide space for federal, state and local emergency personnel 8201 i86373 820104 --~-~-

PDR ADOCK 05000255 F

PDR

'JAN 8 1982

JGKeppler, Administrator Palisades Plant January 4, l982 2

only at the permanent EOF.

Also, eq~ipment for monitoring*GOCC radiation levels will not be installed at the temporary EOF because of its distance (greater than lOO miles from either plant site).

This alternative provides the best method available to support EOF functions within one hour of an emergency event., :* *..., : *

  • i : :.:

~-.

~*',*.. ~***

/.:;)_,,./

  • '... ; *j '*

~

    • .~.

""*.')*

BJ.i*~h~:~.-~.J~~n~o~ :.:.:.<:: ~.1 se~i.dr* '1ic.en:s i_ri:~<Engi!\\e~~

cc

/*.... *"

', f'

,.~ -. *

  • I Direbtb-;;~:-;Offi~*e of Nuclear Reactor Regulation Direct;-:r *:*~(5ffice of Inspection and Enforcement NRC Resident Inspector -* Palisades