ML18046B208

From kanterella
Jump to navigation Jump to search
Forwards Data for 1976-80 Re Diesel Generator Operation, Diesel Generator Down Time & Diesel Generator Mod,In Response to NRC 810720 Request Re Station Blackout, Unresolved Safety Issue A-44
ML18046B208
Person / Time
Site: Palisades, Big Rock Point  File:Consumers Energy icon.png
Issue date: 01/07/1982
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR GL-81-04, GL-81-4, NUDOCS 8201130457
Download: ML18046B208 (35)


Text

{{#Wiki_filter:*.j General Offices: 212 West Michigan Avenue, Jackson, Ml 49201 * (517) 788-0550 January 7, 19&-{ ')- Dennis M Crutchfield, Chief Operating Reactors Branch No 5 Nuclear Reactor Regulation US Nuclear Regula.tory Commission Washington, DC 20555 DOCKET 50-155 - LICENSE DPR-6 ~ BIG ROCK POINT PLANT DOCKET 50-255 - LICENSE DPR PALISADES PLANT - STATION BLACKOUT - UNRESOLVED SAFETY ISSUE A-44 NRC letter dated July 20, 1981 and entitled "Information Request Regarding Station Blackout Unresolved Safety Issue A-44, Big Rock Point and Palisades", requested Consumers Power Company to complete a questionaire covering histori-cal data for the years 1976-1980 pertaining to Diesel Generator operation, Diesel Generator down time, and Diesel Generator modification. The letter also requested Consumers Power Company to review LER documentation presently docketed for Palisades and Big Rock Point regarding station blackout. Our letter of November 23, 1981 identified the need for additional time to complete the requested information. This letter encloses the requested infor-mation. Completed tables for both the Palisades and Big Rock Point Plants are included. The information provides a summary of our detailed log sheets, maintenance orders, equipment outage records, surveillance test records and facility change records. The tables for the Palisades Plant and Big Rock Point Plant are provided as attachments 1 and 2 respectively. ~~ cG .. c.rt/L Thomas C Bordine Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector-Big Rock Point NRC Resident Inspector-Palisades Attachment !~Palisades Plant -Big Rock Point Plant oc0182-0006b142 8201130457 920107 PDR ADOCK 05000155 F PDR. Palisades Plant Diesel Generator Data 1976 - 1980 ~)

TABLE l Reason for DG Operation & Scheduled DG Duration of Run No Tech Spec Required Test Monthly Test M0-7 1 6 Hours 1 Start/Test 2 I : Refueling Outage Test R0-8 l .2: 30 Min 1 Start/Test 2 DG Actual Demand Starts Hot for 'l'esting Miscellaneous Tests (Specify Type) Test Starts After Maintenance 1 (Duration Not Available) 2 Number of Starts 12 12 1 1 b 5 DIESEL GENERATOR OPERATIONS DATA Calendar Year 1976 Number Percent DlU'ation of Run of Loading of. Before Stop for Faillll'es DG (kW) Each DG Failure 0 100% 0 100% 0 100% 0 100% 0 Not Avail 0 Not Avail Enclosure l - Page l Plant Name Palisades Unit No Identification of Failure (Refer to Attached LERs of 'l'able 1-

3)

~'ABLE 1 Reason for DG Number Operation & Scheduled DG of Duration of Run No Starts Tech Spec Required Test Monthly Test M0-7 1 12 6 Hours 1 Start/Test 2 12 DG Actual Demand Starts Uot for Testing Loss of Offsite Power \\ 1 3 I 2* 3 Miscellaneous Tests (Specify Type) Test Starts After 1 6 Maintenance (Duration Not Available) 2 8 DIESEL GENERATOR OPERATIONS DATA Calendar Year 1977 Number Percent Duration of Run of Loading of Before Stop for Failures DG (kW) Each DG Failure 0 BO Min @100% !330 Min @ 40% 0 !30 Min @ 100% B30 Min@ 40% 0 100% 0 100/:> 0 Not Avail 0 Not Avail

    • ~*-'~---

Enclosure l - Page 1 Plant Name Palisades Unit No ~~~~~~~~- Identification of Failure (Refer to Attached LERs of Table 3) I

DIESEL GENERATOR OPERATIONS DATA TABLE l Calendar Year 19-1§ Reason for DG Number Number Percent Duration of Run Operation & Scheduled DG of of Loading of Before Stop for Duration of Run No Starts Failures DG (kW) Each DG Failure Tech Spec Required Test Monthly Test M0-7 1 12 0 30 Min @100: 6 Hours 330 Mine!! 40 1 Start/Test Monthly Test M0-7 2 12 0 30 Min @! 1 oo: 6 Hours ljjU M1n ~ 4Ui l Start/Test Refueling Outage Test R0-8 j_ j_ 0 100~ ~ 30 Min 2 1 0 100% 1 Start/Test DG Actual Demand Starts Hot for Testing Miscellaneous Tests (Specify Type) Test Starts After 1 q 0 Not Aw1i 1 Maintenance (Duration Not Available) 2 6 0 Not Avai.l Enclosure l - Page l Plant Name Palisades Unit No ~~~~~~~~ Identification of Failure (Refer to Attached LERs of Table 3) i I ei

~*.... I ~ TABLE 1 Reason for DG Number Operation & Scheduled DG of Duration of Run No Starts Tech Spec Required Test Monthly Test M0-7 l 13 6 Hours 1 Start/Test 2 12 DG Actual Demand Start.s Uot for Testing Miscellaneous Tests (Specify Type) Test Starts After 1 15 Maintenance (Duration Not Available) 2 11 DIESEL GENERATOR OPERATIONS DATA Calendar Ye~r 19~ Number Percent Duration of Run of Loading.of Before Stop for Failures DG (kW) Each DG Failure 1 30 Min 'IT"O-Oi 1 Failure to Start 330 Min@ 40' 0 30 Min @100 330 Min@ 40 0 Not Avail 0 Not Avail Enclosure l - Page 1 Plant Name Palisades Unit No Identification of Failure (Refer to Attached LERs of Table LER 2

3)

I ! f-'

TABLE l Reason for DG Number Operation & Scheduled DG of Duration of Run No Starts Tech Spec Required Test Monthly Test M0-7 l 12 6 Hours l Start/Test 2 12 Refueling Outage Test R0-8 l l ?: 30 Min 1 Start/Test 2 1 DG Actual Demand Start.s Hot for Testing Miscellaneous Tests (Specify Type) Test Starts After 1 13 Maintenance (Duration Not Available) 2 15 DIESEL GENERATOR OPERATIONS DATA Calendar Year i980 Number Percent Duration of Run of Loading of Before Stop for Failures DG (kW) Each DG Failure 0 130 Min@ 100% 1330 Min @ 40% 0 130 Min ('I! 100% B30 Min @! 40% 0 100% 0 100% 0 Not Avail 0 Not Avail Enclosure l - Page l Plant Name Palisades Unit No ~~~~~~~~ Identification of Failure (Refer to Attached LERs of Table

3)

TABLE 2 Reason for Downtime Scheduled Maintenance Preventive Maintenance Time DG Is Unavailable for Emergency Service Because of Required Tests . -~'.... DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 19_1_6 Hours of Downtime Reactor Shut Down Reactor Not Shut Down DG # DG # DG # DG H DG H DG H DG # DG II DG # DG # 1 2 1 2 0 8 22 0 0 0 75 71 Page 2 Plant Name....;....Pa;.;.;1'°'""1=* s;;....;;a.;;..;;d;;.;;;e""'s __ Unit No -------- Comments j' !.. fi ! I _. f *.*** l,

TABLE 2 Reason for Downtime Scheduled Maintenance Preventive Maintenance Time DG ls Unavailable for* Emergency Service Because of Required Tests DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 1977 Hours of Downtime Reactor Shut Down Reactor Not Shut Down DG # DG # DG # DG # DG # DG # DG U DG # DG # DG # 1 2 1 2 0 0 11.5 36 16 8 8 32 ... *' - Page 2 Plant Name Palisades Unit No ~~~~~~~~ Comments i f:. 'I '

'l'ABLE 2 Reason for Downtime Scheduled Maintenance Preventive Maintenance I' I Time DG Is Unavailable for Emergency Service Because of Required Tests -"-~ ---*-*---*~--~*

  • ~-

.. :* ~. DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 191§. Hours of Downtime Reactor Shut.Down Reactor Not Shut Down DG # DG # DG H DG II DG # DG # DG/ DG # DG # DG # 1 2 1 lb 91 1J 0 0 0 38 24 '*.... : *** - Page 2 Plant Name Palisades Unit No ~~~~~~~~- Comments 91 I f

TABLE 2 Reason for Downtime Scheduled Maintenance Preventive Maintenance Time DG Is Unavailable for Emergency Service Because of Required

  • re*sts DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 19'79 Hours of Downtime Reactor Shut.Down Reactor Not Shut Down DG # DG # DG # DG # DG # DG # DG2 # DG II DG # DG #

1 2 1 36 39 104 90 72 146 21 0 . ' - Page 2 Plant Name Palisades Unit No ~~~~~~~~ Comments

'.!'ABLE 2 Reason for Downtime Scheduled Maintenance Preventive Maintenance Time DG Is Unavailable for Emergency Service Because of Required 'l'ests 1:... *_, _.. '..' "... *.:... ' DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 1980 Hours of Downtime Reactor Shut Down Reactor Not Shut Down DG # DG # DG # DG # *na # DG # DG' # DG II DG # DG # 1 2 1 2 124 183 32 65.5 13 19 57 63 Page 2 Plant Name Palisades Unit No ~~~~~~~~ Comments I . t.

TABLE 3 LER Abstract No (Refer to Attached Total LER Abstracts) Hours 9 0 -..,.;.. ~ '.. : ~*.. '-... *. -~...... .. <.:,. ~,, ~-.: ---.'... ' DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 19 76 - Page 3 Plant Name Palisades Unit No Downtime Hours Comments - If any of the reported failures would not

Parts, have been a failure under emergency* con<li-Trouble-
Delivery, Repai:r/

tions, please explain here. Refer to attached shooting Etc Replace LERs or the failures listed in Table 1. Tech Spec violation only. No failure occurred. l e" '. I i - ~ [ t ' ! L.

t.

'l'ABLE 3 LER Abstract No (Refer to Attached Total LER Abstracts) Hours 6 0 7 0 8 0 DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 19f.1._ Plant Name Page 3 Palisades Unit No ~~~--~~~ Downtime Hours Comments - If any of the reported failures would not

Parts, have been a failure under emergency condi-Trouble-
Delivery, Repair/

tions, please explain here. Refer to attached shootini;!; Etc Replace LERs or the failures listed in Table 1. Tech Spec violation only. No failure occurred. Tech Spec violation only. No failure occurred. Only 1 of 2 air motors was disabled on one DG. i i'

TABLE 3 LEH Abstract No (Refer to Attached Total LEH Abstracts) !lours 5 0 DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 191§_ Enclosure l Plant Name Unit No Page 3 Palisades Downtime Hours Comments - If any of the reported failures would not

Parts, have been a failure under emergency condi-Trouble-
Delivery, Repair/

tions, please explain here. Ret'er to attachecl shooting Etc Replace LERs or the failures listed in Table 1. Tech Spec violation. No failure occurred. i

TABLE 3 LER Abstract No (Refer to Attached Total LER Abstracts) Hours 2 16.5 3 15 4 5 .I

.: *~.
  • ... *~

~ ~, *

  • I
      • ***** I' DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 1912. - Page 3 Plant Name Palisades Unit No--------

Downtime Hours Comments - If any of the reported failures would not

Parts, have been a failure under emergency condi-Trouble-
Delivery, Repair/

tions, please explain here. Refer to attached shootinp,: Etc Renlace LERs or the failures listed in Table 1. 2 11~. 5 1 1 13 1 4 i I I t*'

TABLE 3 LER Abstract No (Refer to Attached Total LER Abstracts) Hours 1 16 ~ - -- -*** .. 'I .~ DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 19.Jio Page 3 Plant Name Palisades Unit No ~~~~~~~~- Downtime Hours Comments - If any of the reported failures would not

Parts, have been a failure under emergency condi-Trouble-
Delivery, Repair/

tions, please explain here. Rel'er to attached shooting Etc Replace LERs or the failures listed in Table 1. DG was inoperable for testing not failure. Tech Spec violation onlv. ei

TABLE 4 Equipment or Procedt1re Modified Operating Procedures ONSITE EMERGENCY DIESEL GENERATOR AND AUXILIARY EQUIPMENT MODIFICATION RECORD Enclosure l - Page 11 Plant Name Palisades Unit No Date of Reason for Modification and Mod Desired Improvement Description of Modification 3/80 Reduce Operator Errors Complete Revision of Operating Procedures I l.

e.

~:... : ;. Big Rock Point Plant Diesel Generator Data 1976 - 1980 . l

" : **' : *:*~ TABLE 1 Reason for DG Number Operation & Scheduled DG of Duration of Run No Starts Tech Spec Required Test Weekly Test T7-0l 1 86 1 Hour 1 Start/Test DG Actual Demand Starts Hot for Testing Miscellaneous Tests (Specify Type) .' ' _;.. :.:~." DIESEL GENERATOR OPERATIONS DATA Calendar Year 19.1.Q Number Percent Duration of Run of Loading of Before Stop for Failures DG (kW) Each DG Failure 13 32 @ 51% 13 Failures To Start 54 @ 0% Duration of Run=O Sec

  • '., **I, *~*-*--:..*_,L ___ **-****:
  • Enclosure l - Page l Plant Name Big Rock Point Unit No Identification of Failure (Refer to Attached LERs of Table LERs 19-26 (From Attached LERs)
3)

TABLE 1 Reason for DG Operation & Scheduled DG Duration of Run No Tech Spec Required Test Weekly Test T7-01 1 1 Hour 1 Start/Test DG Actual Demand Starts Hot for Testing Miscellaneous Tests (Specify Type) Refueling Outage Test TR-42 1 50 Min 1 Start/Test Nwnber of Starts 74 1 DIESEL GENERATOR OPERATIONS DATA Calendar Year 19_)) Nwnber Percent Duration of Run of Loading of Before Stop for Failures DG (kW) Each DG Failure b 27 @ 51% 6 Failures To Start 47 @ 0% Duration of Run=O Sec J. u7. DG Did Not Fail Subsystem Failed Duration Not Known 0 30 Min @ 50~ 20 Min @ 90~ ~ Page 1 Plant Name Big Rock Point Unit No Identification of Failure (Refer to Attached LERs of Table LERs 9, 10, 12, 13, 14, 16 LER 11

3)

I t i

TABLE l Reason for DG Operation & Scheduled Duration of Run Tech Spec Required Test Weekly Test T7-0l l Hour 1 Start/'l'est DG Actual Demand Starts Hot for Testing Miscellaneous Tests (Specify Type) DG No 1 ... ~. Number of Starts 57 DIESEL GENERATOR OPERATIONS DATA Calendar Year 19.1§ Number Percent Duration of Run of Loading of Before Stop for Failures DG (kW) Each DG Failure 2 co@ 51% 0 Min; 25 Min 31@! Ula Enclosure l - Page l Plant Name Big Rock Point Unit No ~~~~~~~~- Identification of Failure (Refer to Attached LERs of 'I'nble LERs 6 & 7

3) i f.

TABLE l Reason for DG Nwnber Operation & Scheduled DG of Duration of Run No Starts Tech Spec Required Test Weekly Test T7-01 1 b2 1 Hour l Start/Test DG Actual Demand Starts Hot for 'l'esting Miscellaneous Tests (Specify Type) I. Refueling Outage Test TR-42 1 1 50 Min l Start/Test DIESEL GENERATOR OPERATIONS DATA Calendar Year 19..,12 Number Percent Duration of Run of Loading of Before Stop for Failures DG (kW) Each DG Failure I

.. /

. ::.,,... - Page 1 Plant Name Big Rock Point Unit No ~~~~~~~~- Identification of Failure (Refer to Attached LERs of Table 2 23@ 51% 2 Failures To Start LERs 4 & 5 39 @ 0% 0 30 Min le! 5G 20 Min @! 9l.J \\

3)

~:

'i 'i i I TABLE 1 Reason for DG Operation & Scheduled Duration of Run Tech Spec Required Test Weekly Test T7-0l 1 Hour 1 Start/Test 3-Day Test T3-0l l Hour 1 Start/Test DG Actual Demand Starts Hot for Testing Miscellaneous Tests (.Specify Type) seecial 21~-Hour Test TR-42 2 Hour 1 Start/Test Number DG of No Starts 1 33 1 .:so 1 2 DIESEL GENERATOR OPERATIONS DATA Calendar Year 19~ Number Percent Duration of Run of Loading of Before Stop for Failures DG (kW) Each DG Failure 0 14 ~ 51% 19 ~ 0% 1 5170 0 Sec ] 100% TJnknown ..... -~--~*~*'"'.'" Enclosure l - Page l Plant Name Big Rock Point Unit No ~~~~~~~~- Identification of Failure (Refer to Attached LERs of Table LER 3 T.RR ~

3) e1*

I ' ~ i !

TABLE 2 Reason for Dmmtime Scheduled Maintenance Preventive Maintenance

l i

Time DG Is Unavailable for Emergency Service Because of Required 'l'ests .. ~*"-*"....... DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 19'.I.§_ Hours of Downtime Reactor Shut.Down Reactor No*t Shut Down DG # DG # DG # DG H DG # DG # DG # DG # DG # DG # l l 37, ~ 73,9 0 12.0

    • I I - Page 2 Plant Name Big Rock Point Unit No

~~~~~~~~- Comments ' ! I* I

'l'ABLE 2 Reason for Downtime Scheduled Maintenance* Time DG Is Unavailable for Emergency Service Because of Required Tests . : ~*:.... ... : ~. ; '~. DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 19..11 Hours of Downtime Reactor Shut.Down Reactor Not Shut Down DG # DG # DG # DG # DG II DGl DG # DG # DG # DG # l 102 28.3 1

  • . L

. : *', ~-... - Page 2 Plant Name Big Rock Point Unit No ~~~~~~~~- Comments Full Load Test

TABLE 2 Reason for Downtime Scheduled Maintenance Preventive Maintenance Time DG Is Unavailabl~ for Emergency Service Because of Required Tests .,. -~ DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 19.tl!. Hours of Dcnmtime Reactor Shut.Down Reactor Not Shut Down DG II DG II DG II DG II DG II DG II DG II DG II DG II DG II 1 1 0 lil. 5 8 0 ~-. - Page 2 Plant Name Big Rock Point Unit No ~~~~~~~~- Comments

TABLE 2 Reason for Downtime Scheduled Maintenance Time DG Is Unavailable for Emergency Service Because o*f Required Tests DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 1979 Hours of Downtime Reactor Shut Down Reactor Not Shut Down DG II DG # DG # DG II DG # DG II DG II DG # DG # DG # 1 1 10 5 Dayi: 1 .... ~ :...:.. ' - Page 2 Plant Name Big Rock Point Unit No ~~~~~~~~

  • comments Full Load Test
  • f
e.

TABLE 2 Reason for Downtime Scheduled Maintenance Preventive Maintenance Time DG Is Unavailable for Emergency Service Because of Required Tests DIESEL GENERATOR SCHEDULED DOWNTIME RECORD Calendar Year 1980 Hours of Downtime Reactor Shut Down Reactor Not Shut Down DG # DG # DG # DG # DG # DG # DG # DG # DG # DG # 1 1 38 0 8 0 24 .-*:. - Page 2 Plant Nrune Big Rock Point Unit No ~~~~~~~~- Comments Generator Full Load Test

TABLE 3 LER Abstract No (Refer to Attached Total LER Abstracts) Hours 17 5.5 18 0 19 0 20 8 21 0 22 0 23 0 24 0 25 0 26 0 27 0 28 0 29 9 30 8

  • ~

'.*.. ;,l_; *.. DIESEL GENERA'l'OR UNSCHEDULED DOWNTIME RECORD Calendar Year 1976 - Page 3 Plant Name Big Rock Point Unit No Domitime Hours Comments - If any of the reported failures would not

Parts, have been a failure under emergency condi-Trouble-
Delivery, Repair/

tions, please explain here. Refer to attached shooting Etc Replace LERs or the failures listed in Table 1. .5 5 Tech Spec violation. Starting criteria exceeded by 3 sec. Tech Spec violation. Starting criteria exceeded by 4 sec. 1 1 Tech Spec violation. Starting criteria exceeded by 5 sec. Tech Spec violation. Starting criteria exceeded by 2.2 sec. Tech Spec violation. Starting criteria exceeded by 13 sec. Tech Spec violation. Starting criteria exceeded. Tech Spec violation. Starting criteria exceeded. Tech Spec violation. Starting criteria exceeded by 10 sec. Design review. Auto transfer failed. Manual transfer made. 1 8 1 7 i :.

i i'

TABLE 3 LER Abstract No (Refer to Attached Total LER Abstracts) Hours 8 0 9 0 10 0 11 12 0 13 0 111 0 15 8 16 . 5 ~. : DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 19.11 Enclosure l - Page 3 Plant Name Big Rock Point Unit No Downtime Hours Comments - If any of the reported failures would not

Parts, have been a failure under emergency con<lJ-Trouble-
Delivery, Repair/

tions, please explain here. R*~l'er to attached shooting Etc Renlace LERs or the failures listed in Table l. Auto Transfer failed. Manual transfer made. Tech Snee violation. Starting criteria exceeded by 19.l sec. Tech Spec violation. Starting criteria exceeded by 7.9 CP Co LER 77-27 was assigned both #8 and #11. For info see #8 above. Tech Spec violation. Starting criteria exceeded by 2.6 Tech Spec violation. Starting criteria exceeded by 12 Tech Snee violation. Starting criteria exceeded by.8 8 . 5 Cause unknown. No repairs made. sec. sec. sec. sec. I I el I I e! I

TABLE 3 LER Abstract No (Refer to Attached Total LER Abstracts) Hours 6 0 7 2lf

I L'

DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 19_1_8 Page 3 Plant Name Big Rock Point Unit No Downtime Hours Comments - If any of the reported failures would not

Parts, have been a failure under emergency condi-Trouble-
Delivery, Repair/

tions, please explain here. Refer to attached shooting Etc Replace LERs or the failures listed in Table 1. ~ Tech Spec violation. Starting criteria exceeded bv 14.6 sec. 1 22 1 el I

t.

TABLE 3 LER Abstract No (Refer to Attached LER Abstracts) 4 5 Total Hours 10 Davs 0 '~ :...

~

DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 1979 - Page 3 Plant Name Big Rock Point Unit No ~~~~~~~~- Downtime Hours

Parts, Trouble-
Delivery, shooting Etc 10 Davs Repair/

Reolace Comments - If any of the reported failures would not have been a failure under emergenc,y condi-tions, please explain here. Refer to attached LERs or the failures listed in Table 1. No Exact cause found. No repairs made. Tech Snee violation. Starting criteria exceeded bv 1.9 sec 'I!

'rABLE 3 LER Abstract No (Refer to Attached Total LER Abstracts) Hours 1 3 2 18 Days 3 1 Hr DIESEL GENERATOR UNSCHEDULED DOWNTIME RECORD Calendar Year 1980 Enclosure l - Page 3 Plant Naine Big Rock Point Unit No ~~~~~~~~- Downtime Hours Couunents - If any of the reported failures would not

Parts, have been a failure under emergency condi-Trouble-
Delivery, Repair/

tions, please explain here. Refer to attached shooting Etc Replace LERs or the failures listed in Table 1. l l l

1 Hr 17 Days
1 Hr

"' 22 Hr 1/2 1/2 ... -~---*. I 1 a! W'1 ! i I I i 91 I ' i.

TABLE 4 Equipment or Procedure Modified FC-394 Start Timer FC-411 Governor Oil Line FC-412 Throttle Arm SFC-78-006 Pump Seal Tech Spec Test '1'7-01 Acceptance Criteria Tech Spec Test '1'7-01 I ONSITE EMERGENCY DIESEL GENERATOR AND AUXILIARY EQUIPMENT MODIFICATION RECORD - Page 11 Plant Name Big Rock Point Unit No --'--------- Date of Reason for Modification and Mod Desired Improvement Description of Modification 10/21/76 Improve Starting Time Change timer from crank-pause to con-tinuous crank for 25 sec. 1/10/77 Improve Starting Time New oil line was installed to governor. 5/27/77 Improve Starting Time Install throttle arm to replace governor control. 4/20/78 Reduce Seal Leakage Problems Replace water pump conventional seal with mechanical seal. 10/20/76 Accident Timing Analysis Acceptance criteria changed from 15 sec to 12 sec. 5/ 4/77 Accident Timing Analysis Acceptance criteria changed from 12 sec to 13.9 sec. I ei I ~ !.}}