Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 11/05/1981 |
From: | BECHTEL GROUP, INC. |
To: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
Shared Package | |
ML18046B033 | List: |
References | |
CON-12447-039, CON-12447-39, RTR-NUREG-0578, RTR-NUREG-0737, RTR-NUREG-578, RTR-NUREG-737, TASK-2.E.1.2, TASK-TM E-9196(Q), NUDOCS 8111110791 | |
Download: ML18046B037 (1) | |
Similar Documents at Palisades | |
---|---|
Category:DRAWINGS
MONTHYEARML20266B0341996-01-16016 January 1996
[Table view]Piping & Instrument Diagram Chemical & Volume Control System.Sheet 1 ML20266B0371996-01-16016 January 1996 Piping & Instrument Diagram Chemical & Volume Control System.Sheet 1B ML20266B3181996-01-16016 January 1996 Piping & Instrument Diagram Htg Vent & Air Cond Containment Building.Sheet 2 ML20266B2661996-01-16016 January 1996 Piping & Instrument Diagram Dirty Waste & Gaseous Waste. Sheet 1 ML20266B2971996-01-15015 January 1996 Piping & Instrument Diagram Instrument Air Walkdown. Sheet 4 ML20266B4201996-01-15015 January 1996 Piping & Instrument Diagram Radwaste Auxiliary Systems ML20266B4231995-12-11011 December 1995 P&Ed Plant Heating & Fuel Oil Systems Condensate & Makeup Demin Bldg ML20266B0981995-12-0909 December 1995 Piping & Instrument Diagram Main Steam & Auxiliary Turbine Systems.Sheet 2 ML20266B0591995-11-16016 November 1995 Piping & Instrument Diagram Safety Injection Containment Spray and Shutdown Cooling System.Sheet 1A ML20266B3631995-11-14014 November 1995 Piping & Instrument Diagram Gas Analyzing Systems.Sheet 1 ML20266B0571995-11-14014 November 1995 Piping & Instrument Diagram Safety Injection Containment Spray and Shutdown Cooling System.Sheet 1 ML20266A9861995-11-14014 November 1995 Piping & Instrument Diagram Radioactive Waste Treatment System Clean.Sheet 1A ML20266B1281995-11-14014 November 1995 Piping & Instrument Diagram Auxiliary Feedwater System. Sheet 2 ML20266B1511995-11-14014 November 1995 Piping & Instrument Diagram Component Cooling System. Sheet 3 ML20266A9731995-10-0404 October 1995 Piping & Instrument Diagram Primary Coolant System.Sheet 1 ML20266B1411995-09-29029 September 1995 Piping & Instrument Diagram Component Cooling System. Sheet 1 ML20266B3101995-09-19019 September 1995 Piping & Instrument Diagram Lube Oil Fuel Oil & Diesel Generator Systems.Sheet 1 ML20266B3381995-09-19019 September 1995 Piping & Instrument Diagram Spent Fuel Pool Cooling System. Sheet 2 ML20266B3021995-09-11011 September 1995 Piping & Instrument Diagram Service Water Screen Structure and Chlorinator ML20266B0011995-09-0707 September 1995 Piping & Instrument Diagram Primary Coolant System. Sheet 2 ML20266B0421995-08-15015 August 1995 Piping & Instrument Diagram Safety Injection Containment Spray & Shutdown Cooling System.Sheet 1A ML20266B1311995-08-14014 August 1995 Piping & Instrument Diagram Service Water System. Sheet 1A ML20266B1171995-08-0909 August 1995 Piping & Instrument Diagram Feedwater & Condensate System. Sheet 1A ML20266B1371995-08-0606 August 1995 Piping & Instrument Diagram Service Water System.Sheet 1B ML20266B3351995-08-0303 August 1995 Piping & Instrument Diagram Shield Cooling System.Sheet 1 ML20266B1211995-08-0202 August 1995 Piping & Instrument Diagram Feedwater & Condensate System. Sheet 1B ML20266B2561995-08-0202 August 1995 Piping Instrument Diagram Radioactive Waste Treatment System Clean.Sheet 2 ML20266B0471995-08-0202 August 1995 Piping & Instrument Diagram Safety Injection Containment Spray & Shutdown Cooling System.Sheet 2 ML20266B0931995-08-0202 August 1995 Piping & Instrument Diagram Main Steam Main & Auxiliary Turbine Systems.Sheet 1 ML20266B0691995-08-0202 August 1995 Piping & Instrument Diagram Safety Injection Containment Spray.Sheet 1B ML20266B1071995-08-0202 August 1995 Piping & Instrument Diagram Feedwater & Condensate System. Sheet 1 ML20266B3151995-08-0202 August 1995 P&ID Plant Heating System.Sheet 1 ML20266B3561995-07-31031 July 1995 Piping & Instrument Diagram Miscellaneous Gas Supply Systems.Sheet 2 ML20266B3811995-07-11011 July 1995 Containment Penetrations.Sheet 1 of 3 ML20266A9911995-06-20020 June 1995 Piping & Instrument Diagram Radioactive Waste Treatment System Clean.Sheet 1B ML20266B3921995-06-16016 June 1995 Containment Penetrations.Sheet 2 of 3 ML20266B3961995-06-15015 June 1995 Containment Penetrations.Sheet 2A ML20266B3991995-06-15015 June 1995 Containment Penetrations.Sheet 3 ML20266B3681995-06-14014 June 1995 Piping & Instrument Diagram Fsd Containment Hydrogen Monitoring System.Sheet 2 ML20266B3301995-06-14014 June 1995 Piping & Instrument Diagram MAKE-UP Domestic Water & Chemical Injection Systems.Sheet 1 ML20266B3231995-04-12012 April 1995 Piping & Instrumentation Diagram Process Sampling System. Sheet 1B ML20266B0291995-01-15015 January 1995 Piping & Instrument Diagram Chemical & Volume Control System.Sheet 1 ML20266B2691994-10-18018 October 1994 Piping & Instrument Diagram RADIO-ACTIVE Waste Treatment System Gaseous Waste.Sheet 2 ML20266B1451994-06-14014 June 1994 Piping & Instrument Diagram Component Cooling System. Sheet 2 ML18065A1131994-03-14014 March 1994 Nozzle Details for Consumers Power Pressurizer ML20266B2891993-10-20020 October 1993 Piping & Instrument Diagram Service & Instrument Air System. Sheet 1 ML20266B3751992-07-0101 July 1992 Piping & Instrument Diagram Steam Generator Blowdown Modification.Sheet 1 ML18065A1021992-02-0606 February 1992 Primary Head Assembly Unit 1 Consumers Power Co Replacement Steam Generator.Sheet 44 ML18065A1011991-12-13013 December 1991 Surface Preparation & Weld Seam Marking Unit 1 Steam Generator.Sheet 104 ML18065A1031991-12-12012 December 1991 Primary Head Assembly Unit 1 Steam Generator.Sheet 40 1996-01-16 Category:ELECTRICAL DRAWINGS-APPLICANT'S FACILITY MONTHYEARML18052A1771985-12-0303 December 1985
[Table view]Schematic Diagram:Service Water Pumps. Sheet 1 ML18052A1761985-12-0303 December 1985 Schematic Diagram:Diesel Generator Bkrs. Sheet 1 ML18052A1791985-10-31031 October 1985 Schematic Diagram:480V Load Centers & Switchyard Feeders. Sheet 1 ML18052A1781985-08-12012 August 1985 Schematic Diagram:Solenoid Operated Circuit Breaker. Sheet 1 ML20260D9721982-02-16016 February 1982 Schematic Diagram:Main Steam Isolation Valves. Sheet 4 of 5.No Revision Date ML20260D9561982-02-16016 February 1982 Schematic Diagram:Main Steam Isolation Valves. Sheet 3 of 5.No Revision Date ML18046B0341981-11-0505 November 1981 Schematic Diagram:Motor Driven Auxiliary Feedwater Pump. Sheet 5.No Revision Date ML18046B0361981-11-0505 November 1981 Schematic Diagram:Main Steam Isolation Valves. Sheet 5.No Revision Date ML18046B0371981-11-0505 November 1981 Schematic Diagram:Motor Driven Auxiliary Feedwater Pump. Sheet 2.No Revision Date ML18046B0391981-09-15015 September 1981 Connection Diagram:Junction Box J540. Sheet 540 ML18046B0421981-09-15015 September 1981 Connection Diagram:Junction Box J541. Sheet 541 ML20260D9511981-08-0404 August 1981 Schematic Diagram:Pressurizer Level Control Instrumentation. Sheet 4 of 5 ML20260D9641981-08-0404 August 1981 Schematic Diagram:Steam Generator Level Instrumentation Sheet 1 of 2 ML20260D9741981-08-0404 August 1981 Schematic Diagram:Pressurizer Level Control Instrumentation. Sheet 5 of 5 ML20260D9801981-08-0404 August 1981 Schematic Diagram:Steam Generator Level Instrumentation. Sheet 2 of 2 ML20260D9481981-07-13013 July 1981 Schematic Diagram:Main Steam Isolation Valves. Sheet 5 of 5 ML20260D9601981-07-13013 July 1981 Schematic Diagram Indication - E/P Hand Controller. Sheet 3 of 3 ML20260D9691981-07-13013 July 1981 Schematic Diagram:Feedwater and Turbine Driver Instrumentation. Sheet 4 of 8 ML18046B0351981-04-27027 April 1981 Schematic Diagram:Steam Generator Level Instrumentation. ML20260D9581980-04-29029 April 1980 Schematic Diagram:Pressurizer Pressure Control & Measurement Channel Instrumentation. Sheet 3 of 4 ML18044A6411980-03-0303 March 1980 Schematic Diagram:Safety Injection Motor Operated Valves. Sheet 2 of 2 ML20260D9781980-02-19019 February 1980 Schematic Diagram Indication - E/P Hand Controller. Sheet 2 of 3 ML18044A6371979-04-0303 April 1979 Schematic Diagram:Safety Injection Motor Operated Valves. Sheet 2 of 2 ML18044A6431979-04-0303 April 1979 Schematic Diagram:Safety Injection Tank Motor Operated Valves. Sheet 1 of 2 ML18044A6421978-10-21021 October 1978 Schematic Diagram:Safety Injection Motor Operated Valves. Sheet 1 of 4 ML18044A6401978-09-0505 September 1978 Schematic Diagram:Safety Injection Motor Operated Valves. Sheet 3 of 4 ML20262K0931978-08-31031 August 1978 Wiring Diagram:Section C12-1 & C12-2. Sheet 17 ML20262K0961978-08-31031 August 1978 Wiring Diagram:Racks & Auxiliary Equipment Sect C12-6 & 7. Sheet 23 ML20262K0891978-01-11011 January 1978 Auxiliary Trip Unit Schematic Diagram Nuclear Instrumentation ML20262K0901977-08-0404 August 1977 Wiring Diagram:Section C12-3 (Partial). Sheet 16 ML20262K0941976-08-18018 August 1976 Wiring Diagram:Section C12-4 Section C12-3 Partial. Sheet 15 ML20262K0851970-12-0101 December 1970 Bistable Trip Unit Schematic Diagram, as-built ML20262K0831970-07-21021 July 1970 Trip Unit Interconnection Module Wiring Diagram, as-built ML18044A6471970-01-16016 January 1970 Schematic Diagram:Vol Control Shutdown Cooling & Press Relief Motor Operated Valves. Sheet 2 of 4 1985-08-12 |
Text
- t
(~*-;f re~ .10,;th) ;L S I 6
- IQ.
(C)
I. I !
I I
I J":.7B LII 0
I 5
l~
b~
I.. s. 'f.. -*). -; :*/_
vet~
ENE.>'\6 IZ.t.D ON Low LC;.VEL