ML18046A956
| ML18046A956 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/07/1981 |
| From: | Johnson B CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8110140387 | |
| Download: ML18046A956 (1) | |
Text
- ~
consumers Power company General Offices: 212 West Mlchlgen Avenue, Jackson, Ml 49201 * (517) 788-0550 October 1, 1981 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Regulatory Commission 199 Roosevelt Road Glen Ellyn., IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - COMPLIANCE WITH ORDt:R MODIFYING LICENSE The NRC Order issued November 9, 1979 required Consumers Power Company to inspect accessible valves and other controls for engineered safety systems at our Palisades Plant on a monthly basis.
This is to inform you that the inspection was not conducted for the month of September 1981 becau.se the plant was shut down for the entire month* due to* refueling.
{\\'
Brian D Johnson Senior Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, O~fice of Inspection and Enforcement NRC Resident Inspector, Palisades Plant
'81110140387 81 l007
- PDR'ADOCK 05000255*
~-!
PDR I
)
OCT g f.QRf