consumers Power company Palisades Nuclear Plant:
Route 2, Box 154, Covert, Michigan 49043 May 8, 1981 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclea:fc'Plimt for the month of April 1981.
CJ)~ [iAJ)e>I 30 Dewey VanDenBerg General Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffman, P24-115 GHRPetitjean, Palisades Resident Inspector, Palisades JJDellas, Pll-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health Lansing, Mi SMierzwa, Mich Dept of Labor RCallen, Mich Public Service Commission BLavallee, NSAC Document Control (2) 950*22*35*10/L
OPERATING DATA REPORT OPERA TING ST A TUS I. Unit Name:
Palisades
- 2. Reporting Period:
--~8=1=0'-4~0=1~-~8=1=0'-4,_3""0'--------
- 3. Licensed Thermal Power (MWt):
2530
- 4. Nameplate Rating (Gross MWe):
811. 7
- 5. Design Electrical Rating (Net MWe):
805
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 675.
- 635 Notes DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-255 5-5-81 DPetersop (616) 764-8913
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date
- 11. Hours In Reporting Period 719 2879
- 12. Number Of Hours Reactor Was Critical 119 2858.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 712 2850.2
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1,750,200 7.012,328
- 17. Gross Electrical Energy Generated (MWH) 220,820 2,212,520
- 18. Net Electrical Energy Generated (MWH)
__5_22
- l'.22 2.022.204
- 19. Unit Service Factor 100 99.0
- 20. Unit Availability Factor 100 99.0
- 21. Unit Capacity Factor (Using MDC Net) 114.4 114.8
- 22. Unit Capacity Factor (Using DER Net) 90.2 90.6
- 23. Unit Forced Outage Rate 0. 9 8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
Bef11el i ng
- A.11g11st 8,
- approximately 100 day* duration.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on Condenser Back Pressure.
s 105140 ~ot Forecast Cumulative 82,094 46 380.s 44 044.4 86,783,064 26,776,230 25,142,508 23.6 53.6 48.2 33.4 Achieved
I
.RAGE DAILY UNIT POWER LEVEL e MONTH April 1981 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2*
723 3
685 4
687 5
744 6
747 7
730 8
14 9
726 10 705 11
.703 12 721 13 1
14 722 15 743 16 735 INSlRUCTIONS DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-255 Palisades 5-5-81 DPeterson (616) 764-8913 AVERAGE DAILY POWER LEVEL (MWe-Net) 712 740 738 741 744 736 26 731 4
710 730 696 740 743 On this format. list the average.daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
SUMMARY
OF OPERATING EXPERIENCE FOR APRIL 1981 Plant ran at near full power for entire month of April 1981.