ML18046A193

From kanterella
Jump to navigation Jump to search
Forwards LER 80-043/01T-0
Date released: 12/25/2019 Download: ML18046A193


LER 80-043/01T-0:on 801106,measured Leakage Through Containment Penetration 14 Exceeded Tech Spec Limit.Cause Under Evaluation.Check Valve & Butterfly Valve Seat Replaced
ML19345B493
Person / Time
Site: Palisades 
Issue date: 11/25/1980
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19345B493 (1)
Forwards LER 80-043/01T-0
ML18046A192
Person / Time
Site: Palisades 
Issue date: 11/25/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML18046A192 (2)