Forwards Palisades 180-Day Response to IE Bulletin 80-11, `Masonry Wall Design. Updated Rept Will Be Issued Upon Completion of re-evaluation Work Re Design Adequacy
ML18046A181
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/06/1980
From: Frost S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18046A182 List:
References
IEB-80-11, NUDOCS 8011260101
Download: ML18046A181 (1)


Text

..

j

\\ '..

consumers Power company G.,*1'111 Offlcn: 212 Wat Mlchlgen Avenue, J*ckson, Mlchlgen ~9201 * (517) 788-0660 November 6, 1980 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT - RESPONSE TO IE BULLETIN 80 MASONRY WALL DESIGN

--:*J

)

I.

I

~ *~** ~

.1

l. ~:.;:.: ~§ C~)

~'J C')

r*r1

(./)

~

():)"

0 z a <

~

l

-0

~

  • i'\\)

011

-....j IE Bulletin 80-11, Masonry Wall Design, dated May 8, 1980, required the identification of any masonry walls which are in proximity to, or have attachments from, safety-related piping and provide a reevaluation of the design adequacy of the walls.

The response for the Palisades Plant, titled "Sixty-Day Response to NRC IE Bulletin 80-11," was submitted to you on July 9, 1980.

In that report we committed to submit the reevaluation of the design adequacy of the masonry walls in accordance to the subject IE Bulletin.

ti lIJ iifll:i:I M~

?]gi tsa

/Ti~

~d}i c:::~.

.;:;::ffi

~~

a

-2 The reevaluation program for the Palisades Plant is expected to be completed in December 1980.

The attached report, prepared by Bechtel Power Corporation, titled "Palisades 180 Day Response to NRC IE Bulletin 80-11," contains information on the work that has been completed prior to the issuance of this report.

An update report will be issued upon completion of the reevaluation work.

Steven R Frost Palisades Nuclear Licensir.g Engineer Attachment Palisades 180 Day Response to NRC IE Bulletin 80-11 CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection 3nd Enforcement NRC Resident Inspector-Palisades B 0112ao101