ML18046A153

From kanterella
Jump to navigation Jump to search
Forwards LER 80-039/03L-0
Date released: 12/19/2019 Download: ML18046A153


LER 80-039/03L-0:on 801023,during Review of Testing Requirements for CV-3027 & CV-3056 It Was Determined That Valves Must Be Stroked Quarterly.Caused by Testing Requirements Not Addresing Potential for Degraded Equipment
ML19339C626
Person / Time
Site: Palisades 
Issue date: 11/14/1980
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19339C626 (1)
Forwards LER 80-039/03L-0
ML18046A152
Person / Time
Site: Palisades 
Issue date: 11/14/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML18046A152 (2)