ML18045A370
| ML18045A370 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/15/1980 |
| From: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8007210394 | |
| Download: ML18045A370 (1) | |
Text
)
General Offices: 212 West Michigan Avenuo, Jackson, Michigan 49201 * (517) 788-0550 July 15, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield Projects Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255
~ LICENSE DPR PALISADES PLANT - LONG-TERM COOLING EQUIPMENT MODIFICATION BIMONTHLY STATUS REPORT Bechtel Corporation is preparing final design details for the long-term cooling modifications.
These modifications are still schedu.led for the 1981 refueling outage.
This serves as a bimonthly status report. for June-July 1980, as required by Technical Sp~cification 6.9.3.3.b.
}) fMd_J)(l #ft~-- -
David* P Hoffman Nuclear Licensing Administrator CC JGKeppler, USNRC NRC Resident Inspector-Palisades soo721 o3'7'(
.. ~