ML18045A291

From kanterella
Jump to navigation Jump to search
Forwards Rept on Endurance Testing of Auxiliary Feedwater Pumps.
ML18045A291
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/01/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML18045A292 List:
References
TASK-10, TASK-RR NUDOCS 8007030250
Download: ML18045A291 (1)


Text

General O.fflces: 212 West Mlchiga.n Avenue, Jackson, Michigan 49201 * (517) 788-0550

.July 1, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief

  • Operating Reactors Branch No 5.

US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - AUXILIARY FEEDWATER PUMPS ENDURANCE TEST RESULTS ConSU-"llers Po.wer Company committed by letter dated* December 11, 1979 to perform an endurance test on the auxiliary feedwater pumps at the Palisades Plant.

This test was performed in accordance with NRC recommendations received by tele-copy en January 25, 1980.. The results .of the tests state that the auxiliary feedwater pumps performed as designed without exceeding any operating limits.

A detailed report on the endurance testing of the auxiliary feedwater pumps is attached to this letter.

David P Hoffman Nuclear Licensing Administrator CC . JGKeppler, USNRC.

NRC R~si~ent Inspector-Palisades 80070SOl50 ~