ML18045A291
| ML18045A291 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/01/1980 |
| From: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18045A292 | List: |
| References | |
| TASK-10, TASK-RR NUDOCS 8007030250 | |
| Download: ML18045A291 (1) | |
Text
General O.fflces: 212 West Mlchiga.n Avenue, Jackson, Michigan 49201 * (517) 788-0550
.July 1, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief
- Operating Reactors Branch No 5.
US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - AUXILIARY FEEDWATER PUMPS ENDURANCE TEST RESULTS ConSU-"llers Po.wer Company committed by letter dated* December 11, 1979 to perform an endurance test on the auxiliary feedwater pumps at the Palisades Plant.
This test was performed in accordance with NRC recommendations received by tele-copy en January 25, 1980..
The results.of the tests state that the auxiliary feedwater pumps performed as designed without exceeding any operating limits.
A detailed report on the endurance testing of the auxiliary feedwater pumps is attached to this letter.
David P Hoffman Nuclear Licensing Administrator CC. JGKeppler, USNRC.
NRC R~si~ent Inspector-Palisades 80070SOl50
~