ML18044A777
| ML18044A777 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/21/1980 |
| From: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8004240450 | |
| Download: ML18044A777 (1) | |
Text
consumers Power company
- General Offices: 212 West Mlchlga_n Avenue, Jackson, Michigan 49201 * (517) 788-0550 April 21, 1980 *
- Director, Nuclear Reactor Regulation Att Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
QUALITY ASSURANCE REQUIREMENTS REGARDING DIESEL GENERATOR FUEL OIL
.e Consumers Power Company was requested by NRC letter, Quality Assurance Require-ments Regarding Diesel Generator Fuel Oil, dated January 7, 1980, to rev~ew*our
. Quality Assurance (QA) Program with regard to diesel fuel oil for the Palisades Plant.
Diesel fuel oil is included in the Palisades Plant QA Program as required by Quality Assur_ance Program Procedures ( QAPP) 2-52, Section 5. 2. 2.
Testing require-ments are defined in the Palisades Plant Technical Specifications 4.17.2.2.b(l) which requires that a sample of diesel fuel from the main storage tank (T-10) be tested in accordance with ASTM-D270-65 and is within the acceptable limits with respect to viscosity, water content and sediment.
This test is conducted at least once every three (3) months.
David P Hoffman Nuclear Licensing Administrator ftoot s
CC JGKeppler, USNRC NRC Resident Inspector-Palisades 1/()
/)µD~
<..f~
t;,¥<.. --
QA~
I I
8004240~~0