ML18044A777

From kanterella
Jump to navigation Jump to search
Responds to NRC 800107 Request to Review Aspects of QA Program Re Diesel Fuel for Facility.Diesel Fuel Oil Is Included in QA Program.Sample of Main Storage Tank Diesel Fuel Is Tested Every Three Months,Per ASTM-D270-65
ML18044A777
Person / Time
Site: Palisades 
Issue date: 04/21/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 8004240450
Download: ML18044A777 (1)


Text

consumers Power company

  • General Offices: 212 West Mlchlga_n Avenue, Jackson, Michigan 49201 * (517) 788-0550 April 21, 1980 *
  • Director, Nuclear Reactor Regulation Att Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

QUALITY ASSURANCE REQUIREMENTS REGARDING DIESEL GENERATOR FUEL OIL

.e Consumers Power Company was requested by NRC letter, Quality Assurance Require-ments Regarding Diesel Generator Fuel Oil, dated January 7, 1980, to rev~ew*our

. Quality Assurance (QA) Program with regard to diesel fuel oil for the Palisades Plant.

Diesel fuel oil is included in the Palisades Plant QA Program as required by Quality Assur_ance Program Procedures ( QAPP) 2-52, Section 5. 2. 2.

Testing require-ments are defined in the Palisades Plant Technical Specifications 4.17.2.2.b(l) which requires that a sample of diesel fuel from the main storage tank (T-10) be tested in accordance with ASTM-D270-65 and is within the acceptable limits with respect to viscosity, water content and sediment.

This test is conducted at least once every three (3) months.

David P Hoffman Nuclear Licensing Administrator ftoot s

CC JGKeppler, USNRC NRC Resident Inspector-Palisades 1/()

/)µD~

<..f~

t;,¥<.. --

QA~

I I

8004240~~0