ML18044A611
| ML18044A611 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/04/1980 |
| From: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8003110389 | |
| Download: ML18044A611 (1) | |
Text
--
i'.
\\._/
consume11 Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49_201 * (517) 788-0650 March 4, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - CONTAINMENT TENDON SURVEILLANCE PROGRAM Consumers. Powe.r Company is informing the NRC by this letter that the Palisades Plant Contairiment Building Tendon Surveillance Program will not be conducted in.1980 but rescheduled for 1981.
Paragraph 4.0.2 of the Palisades Plant Technical Specifications allows an extension to a test or surveillance program time interval not to exceed 25% cf the specific interval.
The one-year postponement of the Containment Building Tendon Surveillance Program falls within the limits specified in this Technical Specification.
This test was last conducted in 1975 which demonstrated that no abnormal degradation of the containment buildings post tensioning system has occurred.
David P Hoffman Nuclear Licensing Administrator CC JGKeppler, USNRC
,(
I i