Text
...
consumers Power company
- General Offices: 212 West Michigan.Avenue, Jackson, Michigan 49201 * (517) 788-0650 January 29, 1980 Charles G. Tinkler Phillips Building, P-904 7920 Norfolk Ave Bethesda, MD. 20014
Subject:
QUESTIONS FROM. PAUL O'CONNOR ON PALISADES CONTAINMENT RESPONSE Paul O'Connor recently called WJBeckius, our SEP Administrator and ~sked the questions which follow.
We have compiled the answers.and have sent them for your infonnation.
Please call me at (517) 788-2243 or Mr. Beckius at 788-2445 if you have *any additional questions.
- Q.
What is the fan cooler d~ty coefficient?
A.
It is given by the following table of Air Cooler Duty versus Containment Temperature.
OF 104 112
- ).-20 125" 135 143 172 193 212 236 247 265 287 350 TABLE 1 Q.
For the shutdown heat exchanger;
- 1.
Heat transfer area?
- 2.
Heat transfer coefficient?
- 3.
Coolant irilet temperature?
- 4.
Coolant flow rate?
BTU/hr 3 x 106 4
5 6
8
- l x107 2
- 3 4
5 6
7 8*
9.75 x 107
- 8002 07 0 -~b3 p.*.*
~.. 1.
- 5790 ft2
__ ea.
(11, 580 ft2 total)
- 2.
196.3 BTU/°F hr ft
- 3.
90°F to 114°F 4..
- 6 I
2 _x 10 lb hr Q.
What is the mass and energy release for a 42" double ended guillotine.
break?
A.
See attached Table 2.
Q.
What is the containment air cooler fan and containment ~pray start time?
- 2.
A.
Assuming DBA conditions (LOCA with*coincident loss of off-site power) and failure of a diesel generator.
With the 1-2 diesel failed the only fan cooler is operational in 23 seconds.
The sprays, with two spray pumps available, are operational in 84 seconds.
With the 1-1 diesel failed one fan cooler is operational in.23 seconds and the remaining two in 33 seconds.
The sprays are operational in 104 seconds with one spray puinp available.
a
~-
C/-~ ~
JLKuemin Senior* Engineer Nuclear Activities cc:
WJBeckius SEP File.
Doc Control 950; 02211 KUEM 3-80
/
t.J,,?'
f*
TABLE 2
+,-.
-~~--
MASS AND ENERGY RELEASE FOR A 42" DOUBLE-ENDED LOCA Time m
h Sec (lbm/hr)
(BTU/lbni) 0.0 l.28E08
. 591.3 0.1 6.3E08
.586.0 0.5 6.055E08 586.5
.. ~. :..
. 5.66E08 587.4 l.l© 1.5 5.14E08 589.1.
2.0 4.455E08 593.0
. 2. 5 3.645E08 599.3 3.0 2.655E08 603.1 J.5 l.71E08 584.3 3.82 l.198E08 571.5 3.84 7.80E07
. 673.7 3.86.
7.10E07 716.0 3.90 6.29E07
- 765.0 4.00 5*.19E07 771.8 4.20 2.975E07 796.0 4.24
- 2. 77E07.
783 4.32 2.375E07 710 4.50 2.03E07 605.6 4.70 2.025E07. _
605 4.80 5.93Eo6 1100 5.0 5.49E06 1102 5.5 4.5Eo6 1145.7 6.0 3.69Eo6 1141.3 6.5 3.04Eo6 1100 7.0 2.46E06 1102.5
. 8.. 0
. l.645E06 1103.1 9.0 l.09Eo6 1102.3
- 10.
7.3E05 1103.4 17.8 0.0 1103.4