ML18044A472
| ML18044A472 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 01/28/1980 |
| From: | Huston R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8001310219 | |
| Download: ML18044A472 (1) | |
Text
\\
~.
consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201 * (517) 788-0650 January 28, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - LONG-TERM COOLING EQUIPMENT MODIFICATION BIMONTHLY STATUS REPORT Bechtel Coq)oration is preparing final design details for the Long-Term Coo.ling Modifications.. These modifications are still scheduled for the -1981 refueling outage~
This serves as a bimonthly status report for.October-November 1979 and December-January 1979/1980 as required.by Technical Specification 6.9.3.3.b.
Senior Licensing Engineer ct JGKeppler, USNRC
.-.{
~-*
Aoo~
s 1/0