Forwards Update to Proposed Change to Tech Specs Section 6 Re Administrative Controls.Clarification Provided to Identify Util Organization Position Re ANSI N18.1-1971
ML18043A904
Person / Time
Site: Palisades, Big Rock Point  File:Consumers Energy icon.png
Issue date: 08/03/1979
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
TASK-13-01, TASK-13-1, TASK-RR NUDOCS 7908060349
Download: ML18043A904 (4)


Text

\\

.1:.c;;;;~J:~.~:2rJ

J~
~i;3T i~ ~ ;*.i¥\\ -~.... ".!I~ *l iJ-;., *.i '-'.=~--~:; _J General Offices: 212 West Mlcnlge.n Avenue *.Jackson, Michigan 49201
  • Area Code 317 788-0330 August 3, 1979 Director, Nuclear Reactor Regulation
  • Att Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DJCKETS 50~155 AND 50-255 - LICENSES DPR-6 LR.EGUlA JORY DOCKET flt[ COPY AND DPR BIG ROCK POINT AND PALISADES PLAL1TS -

PROPOSED TECHNICAL SPECIFICATIONS CHANGE REQUEST UPDATE - SECTION 6 - ADMINISTRATIVE CONTROLS.

Consumers Power Company proposea changes to Section 6 - Administrative Controls of the Big Rock Point and Palisades Plants Technical Specifications on July 16, 1979.

As a result of discussions with NRC staff, the clarifica-tions to that request are provided ~s an attachment.

This clarification is provided to identify the equivalent Consumers Power Company position (title) for positions specified in ANSI Nl8.1~1971.

Consumers Power Company requests that these changes be reviewed and approved as soon as possible.

David P Hoffman Assistant Nuclear Licen_sing Administrator-CC JGKeppler, US Nuclear Regulatory Commission

.ATTACHMENT COMPARISON OF CONSUMERS POWER COMPANY ORGANIZATIONAL TITLES TO THOSE OF ANSI Nl8.l-1971 Section 6.3.1 of the Big Rock Point and Palisades Technical Specifications require that each meritber of the plant staff meet or exceed the minimum qualifications of ANSI Nl8.1.:..

1971 for comparable positions.

The tabulation below specifies the comparison between Cons\\imers Power Company organizational titles and those used in ANSI Nl8.l-1971.

ANSI Title Plant Manager Operations Manager Maintenance Manager Technical Manager Licensed Supervisors BIG ROCK POINT PLANT Radiation Protection Manager (l)

QA Group Leader CPCO Title/ s Plant Superintendent Operations &: Maintenance Superintendent Operations Supervisor Maintenance Engineer Technical Superintendent Shift Supervisor Health Physicist Q). Superintendent In addition, at least one of the individuals working in ea~h area listed in Note A of the organization chart vill possess the qualifications of a group leader in that area

\\

as delineated in the ANSI Standard and will direct efforts* in that area.

( l)Shall meet the qualification require~nts of Regulatory Guide 1.8, Rev l:..R*,

September, 1975 ANSI Title Plant Manager

- Operations Manager Maintenance Manager Technical Manager Licensed Supervisors PALISADES PLANT Radiation Protection Manager( 2 )

  • QA Group Leader CPCo Title/s General Manager Operations &: Maintenance superintendent Operations Superintenden~i)

Operations Supervisor.

Maintenance Superintendent Technical Superintendent Shi ft Supervisors Health Physicist QA Superintendent In addition, at least one. of the individuals working in each area listed in Note A of the organization chart vill possess the qualifications of a group leader in that area as delineated in the ANSI standard and will direct efforts in that area.

(l)The operations supervisor need not meet the requi~ments of ANSI Nl8.l-1971.provid-ed the operations superintendent position is filled.

In this instance, the Oper-ations Superintendent vill be equivalent to the Operations Manager.

<2 )Shall meet the qualification requirements of Regulatory Guide 1.8, Rev 1-R, September, 1975.

Q.A - Admin Off Site QA Superintend I

Operations Supervisor SOL Shift Supervisor SOL

J~1ist~:r~s ?S~*~. ::::.r:.. ~..:?9!

Flar.~ Grgani:.a~io::

Plant (a)

Superintendent Biti: Rock Point

--!Plant P.eview Commi tt ee r

r uperat1ons "

I Technical I Maintenance Superintendent Superintendent I

I Maintenance Engineer Health Physicist A.

Personnel knawledgeable in the following areas identified in ANSI Nl8. 7-1976/ ANS 3.2 will report at the* discretion of the Plant Superintendent.

l. Uuclear Pover Plant Mechanical, Electrical and Electronic Systems
2.

Nuclear Engineering

3.

Chemistr.r and RadiochemistrJ

4.

Radiation Protection (reports to the Health Physicist)

A single individual mey be qualified and perform in more than one discipline.

B.

The Security Force *.rill be supertised as described in the Plant Security Plan.

c.. Quality Control Activities will be in accordance with the Consumers POT.rer Quality Assurance Program Policies.

(a)

Responsi9le for the Plant Fire Protection Program.

(SOL-Senior Operator Licensee)

I i I

I i

\\

, I

~

~'

z QA -

Adm.in Off Site QA Suoerint Operations Sup-erintendent (SOl (b)) &/or Super' Shift Supervisors SOL CONS~ POWER COMP ANY PL.ANT ORGANIZATION General Manager Palisades (a)


-- -- -l ---- - - - - -[ Plant Reviev Committee I

I I '.

Operations &

Technical Maintenance Suoerintendent I Suoerintendent I

I Maintenance Superintendent Health Physicist A.

Personnel knovledgeable in the following areas identified i oft

. ANSI Nl8. 7-1976/ ANS 3.2 rlll report at the discretion General Manager.

1.

Nuclear Power Pla.~t l~echanical, Electrical. and

'l:i'

... lectronic Systems

2.

Nuclear Engineering* *

  • 3.

Chemistry and Radiocheir.istrf n

he

4.

Radiation Protection (reports to the Health Physicist)

A single individual :a.y be qualified and perform in more than one discipline.

B.

iihe Security Force will be si..'Pervised as described in the Plant Security Plan.

C.

Quality Control Activities will be in accordance vi th the Cons"Umers Power Quality Assurance Progl'.a.m Policies~

(a}

Responsible for the Piant Fire Protection Progrm:i.

(b) Either the Operations Superintendent or the Operations Supervisor will hold an SOL and meet the other requirements of 6. 3.1 of these Technical Specifications (as appli-cable to Operations Manager in ANSI Nl8.l).

The individual holding an SOL shall be responsible for directing the activities of licensed operators.

(SOL-Senior Operator Licensee)

i.