Submits Mods to 790301 Followup to Fire Protection Administrative Guidelines.Audits Are Performed Biennially, Not Biannually.Fire Protection Needs Must Be Identified When Maint Orders Submitted
ML18043A832
Person / Time
Site: Palisades, Big Rock Point  File:Consumers Energy icon.png
Issue date: 07/16/1979
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7907190415
Download: ML18043A832 (1)


Text

General Offices: 212 West Michigan Avenue, Jackson, Michl.gen 49201

  • Area Code *517 7.BB-0550
  • July *16, 1979 Directo~, Nuclear Reactor Regulation Att Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKETS 50-155 & 50-255 - LICENSES DPR-6 & DPR BIG ROCK POINT & PALISADES PLANTS - FOLLOW-UP TO FIRE PROTECTION ADMINISTRATIVE GUIDELINES Reference (1) Letter D L Ziemann to D A Bixel Dated February 15, 1979 (2) Letter w s Skibitsky toD L Ziemann Dated June 19' 1978 (3) Letter D p Hoffman to D L Ziemann Dated September 29, 1978 (4) Letter D p Hoffman to D L Ziemann Dated October 6, 1978 (5) Letter D p Hoffman to D L Ziemann Dated March 1, 1979 (6) Letter D p Hoffman to D L Ziemann Dated March 15,
  • J979 Consumers.Power Company's follow-up *to fire protection administrative guidelines (Reference 5) contained two responses that require modification.

Response 6 to Enclosure 1 indicates that audits of the fire protection program are performed biannually. The response should read "Audits are performed biennially ... " which is consistent with the technical.audit frequency identified in Technical Specification 6.5.2.8. In addition, QA audits are performed on a biennial basis in accordance with Consumers Power Company's Quality Assurance Program Policy 18.

Response 9 to Enclosure 2 should be clarified. The response should read, "Consumers Power considers- first-line supervision as part of the -plant's management and, therefore, res~onsible for fire protection needs 6f any particular work order. Whenever a maintenance order is filled out, fire protectiori needs (including a fire watch) must be identified. The plant QC organization provides a ch~ck of this process by reviewing (generally after the work is complete) all safety-related maintenance orders."

0;::_fj1jo/

David P Hoffman Assistant Nuclear Licensing Administrator CC: JGKeppler, USNRC