ML18043A791
| ML18043A791 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 05/23/1979 |
| From: | Hoffman D, Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 7907110278 | |
| Download: ML18043A791 (3) | |
Text
(
consumers Power company General Offices: 212 West Michigan Avenue,.Jackson, Michigan 49201
- Area Code 517 788-0550 May 23, 1979 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - RESPONSE TO IE BULLETIN 79 REQUALIFICATION TRAINING PROGRAM STATISTICS IE Bulletin 79-10 requested informatiop relating to operator retraining program' statistics.
The attached Table 1 provides all of the requested information.
David P Hoffman (Signed}
David P Hoffman Assistant Nuclear Licensing Administrator CC:
Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement z 5 i979 79071 Jod-73
I.
,.f)
TABLE l Utility: Consumers Power Company Date:
May 18, 1979 Facility: Palisades Plant Operators Senior Operators
- Exa.I:l Exam Exam Exam Exa.I:l Ex;m Exam Exa::;
l 2
3 4
l 2
3 4
- l. Action l: Responses A.
Total number !ailed annual examination 0
0 0
0 0
0 0
0 B.
Percent that failed annual examination 0%
0%
0%
0%
0%
0%
0%
0%
- 2.
Action 2:
Responses A.
Percent required to attend additional lectures 88%
63%
54%
29%
83%. 45%
40%
11%
l B.
Number of operators 1/1 3/1 4/1 2/1 1/2 2/1 4/1 1/1 attending specified*
2/2 2/2 1/2 2/2 1/3 1/2 number of lectures (no.
1/3 2/3 1/4 of operators/no. of 1/5 2/5 lectures) 2/6
- 3. Action 3:
Responses A.
Total number attending accelerated training because 70 percent on annual written examination 0
0 0
0 0
0 0
0 B.
Percent attending accelerated training lesson because 70 percent on annual written examination 0%
0%
0%
0%
0%
0%
0%
0%
- c.
Total number attending accelerated training because unsatisfactory oral exa.m.ination N/A N/A N/A N/A N/A N/A N/A N/A
(
J
(
/.
(
D.
Percent attending accelerated training because unsatisfactory oral examination Date of Exam l 1975 2
1976 3
1977 4
1978 Operators Senior Operators Exam Exam Exam Exam Exam Ex~ Exa~ Exa~
1 2
3 4
l 2
3 4
N/A N/A N/A N/A N/A N/A N/A N/A