Forwards Drawings of Reactor Vessel Supports,In Response to 790614 Telcon Request & 790613 Internal Memo Addressing Remaining Questions.W/O Drawings
ML18043A758
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/14/1979
From: Fields H
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Snaider D
Office of Nuclear Reactor Regulation
References
TASK-06-02.B, TASK-6-2.B, TASK-RR NUDOCS 7906250290
Download: ML18043A758 (3)


Text

,.

consumers Power company General Offices: 212 West Michigan Avenue, Jack.on, Michigan 49201 * (617) 788-0660 June 14, 1979

~ETUaN 10 Rf.ACTOR OOCKEJ flLES Mr Dick Snaider US Nuclear Regulatory Commission

' *. !.... -<.'~~.;;~;~~;

7920 Norfolk Avenue, Phillips Building Bethesda, Maryland 20014 Enclosed you will :rind the drawings of the Palisades reactor vessel supports you requested per our telephone conversation* on June 14, 1979.

Also :rind a copy of the internal memo that addresses the remaining questions on the reactor.vessel.supports.

Howard Fields Associate Engineer Enclosures ( 6)

HF-3-79 7 9 0 6 2 5 0-:;}-qo

  • ~-

! l

To fROM

. DATE 9.JB.JECT cc File BFields, P-24-120 /\\('./.

J\\me 13, 1979 RAPID RESPONSE TO NRC ON PALISADES REACTOR VESSEL SUPPORT STRUCTURE DABixel, P-24-119 OSCashell, P-24-122 RWHuston, P-24-124 Document Cont rel ( 950*2101 *1807, 5 yrs)

A v

consumars PDt"Jer

. compuny INTERNAL CORRESPONOENCE BF-2-79 On June T, 1979, Nuclear Licensing received from Dick Sns.ider of the NRC the following infonnation.. Response due June 15, 1979.

Question:

1 -

Do we have a water-filled neutron shield tank Answer:

No Question:

2 - Send diagram of reactor vessel support structure.

Ansver:

The following drawings were formally sent to NRC.

Their numbers are included here for reference.

Combustion Engineering Drawing 2966-D-?D78 Rev A - Rx Vessel Support Assembly Inlet Nozzle 2966-D-3079 Rev A - Rx Vessel Support Assembly Outlet Nozzle E-232-116 Rev 5 - Vessel Supports E-232-111 Rev 3 - General Arrangement Elevation

  • Bechtel Company Drav'ing C-157 Rev 6 -

Rx Vessel Supports Question:

3 - Types of material end location of reactor vessel support structure.

Answer:

See Drawings referred to in question number two.

Question:

4 - Thickness of material in ( 3) above.

Answer:

See Drawings referred to in question number two.

  • L 1

2-Question:

5 - HDT measurements on materials in (3) above, it available.

Answer:

ASME Boiler end Pressure Vessel Cede Section XI 1979 Edition - Summer, 1975, Addendum Category B-H "Vessel Support"*

Table IWB-2500 Exempts us from NDT measurements on the reactor vessel supports *

  • .