Discusses Interpretation of Tech Spec Section 3.11e Re Failure of Data Logger & Ensuing Required Power Reduction. Tech Spec Implies 2-h Period for Repair of Failed Data Logger
ML18043A718
Person / Time
Site: Palisades 
Issue date: 06/01/1979
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7906060236
Download: ML18043A718 (1)


Text

~I consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201 * (517) 788-0550 Jtme 1, 1979 Director, Nuclear Reactor Regulation Att:

Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 lB Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 -

LICENSE DPR PALISADES PLANT -

CLARIFICATION OF TECHNICAL SPECIFICATION 3.11. e Technical Specification 3.11.e states:

"The data logger can be inoperable for two hours.

If at the end of two hours it is not available, the power level shall not exceed 85% of rated power"

'The bases for Technical Specification 3.11.e state:

"If the data logger for the in-core readout is not in operation for more than two hours,

power will be reduced to provide margin... "

Consumers Power Company interprets Technical. Specification 3.11.e to mean that if the data logger fails, we have two hours to repair it. If at the end of the two hours it is not available, power level is to be decreased at the normal shutdown rate to less than 85% of rated power.

IJ~a~

David P Hoffman Assistant Nuclear Licensing Administrator CC:

JGKeppler, USNRC 7906060d-~

A1J1nf s

'/'lo.