ML18043A413

From kanterella
Jump to navigation Jump to search
Forwards Suppl Info for 781227 Tech Specs Change Re Plant Organization
ML18043A413
Person / Time
Site: Palisades, Big Rock Point  File:Consumers Energy icon.png
Issue date: 01/12/1979
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7901180144
Download: ML18043A413 (7)


Text

- - *.JI consumers Power company General Offices: 212 West Michigan Avenue, .Jackson, Michigan 4g201

  • Area Code 517 788-0550 January 12, 1979 Director, Nuclear Reactor Regulation Att: Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-155/255 - LICENSE DPR-6/20 -

BIG ROCK POINT/PALISADES PLANTS - PLANT ORGANIZATION, TECHNICAL SPECIFICATIONS CHANGE The attached material supplements our proposed Technical Specifications change dated December 27, 1978 concerning Plant Organization. It is consistent with the original propo*sed change, meets the requirements of ANSI N18. 7-1976 and was discussed with members of your staff on January 5, January 8 and .

January ~, 1979.

David P Hoffman (Signed)

David P Hoffman Assistant Nuclear Licensing Administrator CC: JGKeppler, USNRC RtGULA10RY DOCl\ET FILE CO?Y 79011.S O\ t/tJ

ATTACHMENT 1 PALISADES PLANT Docket 50-255 License DPR-20

6. 5 REVIEW .AND AUDIT 6.5.1 PLANT REVIEW COMMITTEE (PRC) 6.5.1.1 FUNCTION The PRC shall function to advise the Plant Superintendent on all matters related to nuclear safety.

6.5.1.2 COMPOSITION The PRC shall be composed of the:

Chairman:. Plant Superintendent or Designated Alternate Member: Operations Superintendent*.

Member: Technical Superintendent Member: Maintenance Superintendent*

Member: Plant Instrument and Control Engineer or Supervisor Member: Plant Reactor Engineer Member: Health Physicist Member: Cheinical Engineer or Supervisor Member: Shift Supervisor (One)

Member: Senior or General Engineer (One)

  • When these positions are combined in accordance with the Plant Organization, Figure 6.2-2, the individual holding both positions serves as a single voting member of .the PRC.

6.5.1.3 ALTERNATES Alternate members shall be appointed in writing by -the PRC Chairman to serve on a temporary basis; however, no more than two alternates shall participate in PRC activities at any one ti.me.

6.5.1.4 MEETING FREQUENCY The PRC shall meet at least once per calendar month with special meetings as required.

6.5.1.5 QUORUM A quorum of the PRC shall consist of the Chairman and four members (including alternates).

6.5.1.6 RESPONSIBILITIES The PRC shall be responsible for:

a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) a:n:y other proposed procedures or changes thereto as de-termined by the Plant Superintendent to affect nuclear safety.
b. Review of all proposed tests and experiments that affect nuclear safety.

6-5

COi'TSUMERS POWER COMPA.i.TI Plant Organization Genera.ting Plant QA - Ad.min Superintendent-Off Site Nuc.lear a)

______ - - ~ Plant Review Committee I OJ?erations Ma.intena.nc e Rea.1th Tecbnica.l Superintendent* Superintendent Phj'sicist Superintendent-SOL (b) (d) (d)

Operations A. The following other disciplines, as identified by .ANSI Supervisor Nl8. 7-1976/.ANS-3. 2, will be represented by qualified per-SOL (c ). sonnel who will report at the discretion of the Generating Plant Superintendent-Nuclear:

1. Nuclear Power Plant Mechanical, Electrical Shift . . and Electronic Systems SuJ?ervisors 2. Nuclear Engineering SOL 3. Chemistry and Radiochemistry
4. .Radiation Protection (Reports to Health Physicist)

A s-ingie individua;t. mey be qualified and perform in more than one discipline.

B. The Security Force will be supervised as described in the Plant Security Plan.

C. Quality Control Activities will be in accordance with the Consumers Power Quality Assurance Program Policies.

(a) Responsible for the Plant Fire Protection Program (b) The Operations Superintendent need not hold an SOL provided he meets the other requirements of 6.3.1 of these Specifications and the position of "Operations Supervisor" is filled. Under these conditions, the Operations Supervisor shall be responsible for directing the activities.of licensed operators.

(c) This position need not be filled if the Operations Superintendent holds an SOL. However, when the Operations Supervisor position is filled, that indi-vidual shall hold an SOL.

(d) The Operations and Ma;ntenance Superintendents' positions ma.y be combined under one individual- When this occurs, the operations supervisor position will be filled.

(SOL - Senior Operator Licensee)

Figure 6.2-2

ATTACHMENT 2 BIG ROCK POINT PLANT Docket 50-155 License DPR-6

CONSUMERS POWER COMP Al.TI P.la.nt Organization Generati::ig P.la.nt G.A - Admin SuDerintendent-Off Site - ( a)

-+ ___ -----~

Nuc.lee.r

..--Q--lA~~u-:o_t_ _..,.I __________ P1ant Renew Ccm!nittee I Operations Superintendent Ma.intena.nc e Superintendent

a:euth Physicist I Teclmica.l Superintendent*

SOL (b) (d) (d)

Operations A. T'ne following other disciplines, as identified by .AlISI Su-cervisor NJ.8.7~1976/.ANS-3.2, wil.l be represented by qualified per-SOL (c) sonne.l who will :report at the discretion of the Generating*

Plant Superint endent-Uucl.ear:

l. Nuc.lear Power Plant M~chanical, Electrical Shi!'t and Electronic Systems Supe..-rl.sors 2. Nuclear Engineering SOL .3. Cllemistry and Radiochemistry
4. Radiation Protection (Reports to Hea..lth Physicist)

A single individual may be qualified and perform in more than one discip.line.

B. The Security Force will be supervised as described in the

.Plant Security Plan.

C. Quality Control Activities will be in accordance with the Consumers Power Quality Assurance Program Policies.

(a) Responsible for the Plant Fire Protection Program (b) The Oi:iera.tions Su];)erintendent need not hold an SOL provided he meets the other requirements of 6.3.1 of ~hese Specifications and the position of "Operations Supervisor" is filled. Under these conditions, the Operations Supervisor shall be responsible for directing the activities of licensed opera.tors *

( c) This position need not be filled if the Operations Superintendent holds a.n S.OL. However, when the Operations Supervisor position is filled, that indi-vidual shall hold an SOL.

(d) The Operations and Maintenance Superintendents' positions may be combined Under one individual. When this occurs, the operations sui:iervisor position will be filled.

(SOL - Senior Opera.tor Licensee)

Figure 6.2-2

r~

6.4 TRAINING 6.4.1 A retraining and replacement training program for the plant staff shall be maintained under the direction of the Plant Superintendent and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI Nl8.l-1971 and Appendix "A" of 10 CFR, Part 55, 6.4.2 A training program for the Fire Brigade shall be maintained under the direction of the Plant Training Coordinator and shall meet or exceed the requirements of Section 27 of the NFPA Code-1975 except for Fire Brigade training sessions which shall be held at least quarterly.

6.5 REVIEW AND AUDIT 6.5.1 PLANT REVIEW COMMITTEE (PRC) 6.5.1.1 The Plant Review Committee (PRC) shall function to advise the Plant Superintendent on all matters related to nuclear safety.

6.5.1.2 COMPOSITION The PRC shall be composed of the:

Chairman: Plant Superintendent Member: Operations Superintendent*

Member: Technical Superintendent Member: Maintenance Superintendent*

Member: Operations Supervisor Member: Instrument and Control Supervisor Member: Reactor Engineer Member:

Member: .

Member:

Health Physicist Shift Supervisor Maintenance Engineer

  • When these positions are combined in accordance with the Plant Organizat~bn'., Figure 6. 2-2, the individual holding both positions serves as a single voting member prithe PRC.

6.5.1,3. ALTERNATES Alternate members shall be appointed in writing by the PRC Chairman to s.erve on a temporary basis; however, no more than two alternates. shall participate in PRC actiivities at any one time. *:

107 I I