Ack Receipt of Energy Inc Project Scope Rept.Will Also Request Project Scope Rept from Bechtel.C-E Is Consultant. Const Phase Is Scheduled for 1981 Refueling Outage
ML18043A398
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/12/1979
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7901160147
Download: ML18043A398 (1)


Text

{{#Wiki_filter:./ .- . consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201

  • Area Code 517 788-0550 January 12, 1979 Director, Nuclear Reactor Regulation Att: Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 -.LICENSE DPR PALISADES PLANT - LONG-TERM COOLING EQUIPMENT MODIFICATION BIMONTHLY STATUS REPORT Consumers Power Company has received the Energy Incorporated (EI) project scope report and has reviewed it internally. Bechtel Corporation will be asked to submit a project scope report also. Combustion Engineering is _acting as our consultant on this project and is presently reviewing several design basis aspects of the EI report . .

The actual construction phase is still scheduled for the 1981 refueling outage. This serves as the bimonthly status report for Novembe~-December 1978,as required by Technical Specification 6.9.3.3.b. r1 , 6-~~L)