ML18043A376

From kanterella
Jump to navigation Jump to search
Items 3.1.7 & 3.1.21 of Table 3.1 of Fire Protection Safety Evaluation Will Not Be Completed Until March 1979 Due to Problems in Establishing Design Requirements & in Procurement of Matls
ML18043A376
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/05/1979
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7901090244
Download: ML18043A376 (1)


Text

  • *

-~~: __ ......

consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201

  • Area Code 517 788-0550 January* 5, 1979 Director, Nuclear Reactor Regulation Att: Mr Dennis L Ziemann, Chief Operating Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - FIRE PROTECTION MODIFICATIONS UPDATE In Amendment No 42 to Provisional Operating License No DPR-20 for the Palisades Plant, a schedule was established for plant fire protection modifications. A report must be submitted if completion dates .listed in Table 3 .1 of the NRC' s Fire Protection Safety Evaluation cannot be met per Paragraph 3.E of the license.

In accordance with the above requirement, Items 3.1.7 and 3.1.21 of Table 3.1*

will not be completed until March 1979.* The delays are due to difficulties in establishing design requirements and in procurement of materials.* We feel that these delays will not affect the overall completion of fire protection modifi-cations.

,i~c Assistant Nuclear Licensing Administrator CC