ML18043A339

From kanterella
Jump to navigation Jump to search
Forwards LER#78-040/01X-1
Date released: 10/31/2018 Download: ML18043A339


LER#78-040/01X-1 on 781128:during Venting of Control Tank, Leakage from Surge Tank Resulted in Gaseous Release W/Out 15 Day Holdup Time Required by Tech Specs.Cause Is Still Under Exam;Updated Rept Will Be Submitted by 790105
ML18043A340
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/18/1978
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML18043A340 (1)
Forwards LER#78-040/01X-1
ML18043A338
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/18/1978
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML18043A338 (3)