ML18041A200

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 99900403/89-01 on 890313-23 & Notice of Nonconformance.Description of Steps Taken to Correct Items, Prevent Recurrence & Dates Corrective Actions & Preventive Measures Will Be Completed Requested within 30 Days
ML18041A200
Person / Time
Issue date: 07/10/1989
From: Brach E
Office of Nuclear Reactor Regulation
To: Wolfe B
GENERAL ELECTRIC CO.
Shared Package
ML18041A201 List:
References
CON-IIT07-620-91, CON-IIT7-620-91, REF-QA-99900403 NUREG-1455, NUDOCS 8907130075
Download: ML18041A200 (4)


Text

.P~Pg REOI I

Ie ry

~

0

>a*+~

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 July 10, 1989 0$

QP.

01 Dr. Bertram Wolfe, Vice President and,Ge eral Mana er

.AGE.;.;giiilear~g~eigy 175 Curtner Avenue San Jose, California 95125

Dear Dr. Wolfe:

This letter addresses the inspection of your facility at San Jose, California conducted by Messrs.

Richard P. McIntyre and Stephen D. Alexander of the Vendor Inspection Branch on March 13-23,

1989, and the discussion of our findings with Mr. James Fox and other members of your staff at the conclusion of the inspection.

The inspection was conducted to review GE Nuclear Energy's (GENE) process for dedicating commercial grade mechanical and electrical items for use in safety-related applications.

Additionally a review of unresolved items 87-02-01, concerning the GE "White Paper" and the issue of associated circuits at Nine Nile POint 2

(NMP2) anO 88-02-02, COnCerning the adequaCy Of GEIIE S

dedication of commercially procured molded case circuit breakers for safety-related applications was also performed.

During the inspection, it was found that the implementation of you guality Assurance program failed to meet certain NRC requirements, specifically in the area of the implementation of your dedication process used for commercial grade items procured for use in safety-related applications as described in GE Engineering Operation Procedure EOP 65-2.20, "Dedication of Commercial Grade Items."

In addition, the GENE dedication of molded case circuit breakers in

general, and the dedication of replacement parts from Dresser-Rand for the Limerick-2 reactor core isolation cooling (RCIC) Terry Turbine governor valve were considered to be inadequately accomplished.

In response to the enclosed Notice of Nonconformance, please provide us within 30 days from the date of this letter, a written statement containing:

(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective action and preventive measures were or will be completed.

We will consider extending the response time if you can show good cause for us to do so.

The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Dr. Bertram Wolfe July 10, 1989 In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of thi. letter and the enclosed inspectior report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

S i ncere ly, Original signed by E. William Brach E. William Brach, Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosures:

1.

Appendix A-Notice of Nonconformance 2.

Appendix B-Inspection Report 99900403/89-01 DISTRIBUTION:

~IO C <<:09 Central Files VIB Reading DRIS Reading JLieberman LShao BKGrimes AThadani EWBrach SNewberry UPotapovs JHauck RVcIntyre SAlexander DHurphy, Ol

<<SEE PREVIOUS CONCURRENCE PAGE.

[GE NUCLEAR EhERGY LETTER 2j

~

~

~

18<<

~

~

~

tNHE :RHcIntyre:jh

UPotapovs
E h
BKGrimes W&

W

<<WW W

W

~

~

%W DATE :06/"3/89

06/26/89
06/29/89
07/03/89 OFFICIAL RECORD COPY WWWW&I WA W W W W '%

i h