ML18040A898

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 49 to License NPF-22.Amend Modified Tech Spec Table 3.6.3-1, Primary Containment Isolation Valves
ML18040A898
Person / Time
Site: Susquehanna 
Issue date: 05/24/1988
From: Butler W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18040A899 List:
References
NUDOCS 8806020313
Download: ML18040A898 (8)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSEE DOCKET NO. 50-388 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Reoulatory Commission (Commission) has issued Amendment No.

49 to Facility Operating License No. NPF-22, issued to Pennsylvania Power and Light Company (the licensee),

which revised the Technical Specifications for operation of the Susquehanna Steam Electric Station, Unit 2, located in Luzerne County, Pennsylvania.

The amendment was effective upon star tup following Unit 2 second refueling

.outage expected in Mav 1988 except for those changes which have been marked (*)

to indicate that they will be effective upon startup following Unit 2 third refueling outage expected at the end of November 1989.

The amendment modified the

SSES, Unit 2 Technical Specifications'able 3.6.3-1 related to "Primary Containment Isolation Valves."

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Comnission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment to Facility Operatinq License and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on March 11, 1988 (53 FR 7995).

No request for a hearing or petition for leave to intervene was filed following this notice.

The Commission has prepared an Environmental Assessment related to tt e action and has determined not to prepare an environmental impact statement.

Based upon the environmental assessment, the Commission has concluded that the issuance of this amendment wi11 not have a significant effect on the quality of the human environment.

For further details with respect to the action see (I) the application for amendment dated December 23,

1987, and supplemented March ll and 24,
1988, (2) Amendment No.

49 to License No. NPF-22, and (3) the Commission's related Safety Evaluation and Environmental Assessment.

All of these items are available for public inspection at the Commission's Public Document

Room, 1717 H Street NW, and at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Wilkes-Barre, Pennsylvania 18701.

A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:

Director, Division of Reactor Projects I/II.

Dated at Rockville, Maryland this 24th day of May 1988.

FOR THE NUCLEAR REGULATORY COMMISSION Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

1

'I

~

P 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSEE DOCKET NO. 50-388 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (Commission) has issued Amendment No.

49 to Facility Operating License No. NPF-22, issued to Pennsylvania Power and Light Company (the licensee),

which revised the Technical Specifications for operation of the Susquehanna Steam Electric Station, Unit 2, located in Luzerne County, Pennsylvania.

The amendment was effective upon startup following Unit 2 second refueling outage expected in May 1988 except for those changes which have been marked (*)

to indicate that they will be effective upon startup following Unit 2 third refueling outage expected at the end of November 1989.

The amendment modified the SSES, Unit 2 Technical Specifications'able 3.6.3-1 related to "Primary Containment Isolation Yalves."

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on March 11, 1988 (53 FR 7995).

No request for a hearing or petition for leave to intervene was filed following this notice.

à I

880b0203i3 880524 W

".~

<(g

1-f The Commission has prepared an Environmental Assessment related to the action and has determined not to prepare an environmental impact statement.

Based upon the environmental assessment, the Commission has concluded that the issuance of this amendment will not have a significant effect on the quality of the human environment.

For further details with respect to the action see (1) the application for amendment dated December 23,

1987, and supplemented March 11 and 24,
1988, (2) Amendment No. 49 to License No. NPF-22, and (3) the Commission's related Safety Evaluation and Environmental Assessment.

All of these items are available for public inspection at the Commission's Public Document

Room, 1717 H Street NW, and at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Wi lkes-Bar re, Pennsylvania 18701.

A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:

Director, Division of Reactor Projects I/II.

Dated at Rockville, Maryland this 24th day of Nay 1988.

FOR THE NUCLEAR REGULATORY COMMISSION Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Docket. "ile 50-388~

PDI-2 eading NThadani/DFischer MOABrien (2)

~

~

k Y+

DOCKET NO.

Rules and Procedures Branch MEMORANDUMFOR:

Division of Rules and Recorda-Office of A'dmin'istration FROM Office'of Nuclear Reactor Regulatlon"-

SUBJECT:

PENNSYLVANIA HNER AND LIGHT CONPHHX SUSQUEHANNA STEAN ELECTRIC STATIONr UNIT 2 One signed original of the Federal Register Notice'identified below Is enclosed'for your transmittaf to the Office of the Federal Register for publication. Additional confo'rmed copies (

5

) of the Notice are enclosed foryour use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for'Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

Notice of Consideration of Issuance of Am'endment to Facility Operating License.

Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Reporf; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunl'ty for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited WorK A'uthorlzatlon.'otice of Availabilityof Safety'Evaluation RepOrt:

Notice of Issuance of Construction Permit(s).

Nj Notice of issuance'o Amendmenf(s);

Order:

Exemption.

'otice of Granting Exemption.

Environmental Assessment..

Notice of Preparation of Environmental Assess'ment.

Other:

Office of Nuclear Reactor Regulation

Enclosure:

As stated

Contact:

N-B. O'rien Phone:

)+$424 OFFICE>

SVRIVAMEW r

OATE> Q/$/8 NRc FoAM sie IIO/e v.I 0240 OFFICIAL RECORD COPY

1 c

~

l

'l k

I

'I

> ~

J.