ML18039A596

From kanterella
Jump to navigation Jump to search
Forwards LER 98-003-00 Re Automatic Reactor Scram on Unit 2 from 100% Power.Event Was Result of Valve Failure Which Caused Generator Stator Cooling Water to Exceed High Temp Setpoint for Tt Which Resulted in Automatic Reactor Scram
Date released: 09/27/2018 Download: ML18039A596


LER 98-003-00:on 981001,Unit 2 Received Full Automatic Scram from 100% Reactor Power.Caused by Failure of Normally Open Isolation Valve Which Blocked Flow of Stator Cooling Water Through Associated Heat Exchangers.Replaced Failed Valve
ML18039A597
Person / Time
Site: Browns Ferry 
Issue date: 10/28/1998
From: Rogers A
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML18039A597 (10)
Forwards LER 98-003-00 Re Automatic Reactor Scram on Unit 2 from 100% Power.Event Was Result of Valve Failure Which Caused Generator Stator Cooling Water to Exceed High Temp Setpoint for Tt Which Resulted in Automatic Reactor Scram
ML18039A595
Person / Time
Site: Browns Ferry 
Issue date: 10/28/1998
From: Singer K
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18039A595 (6)