CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SUBJECT:
Forwards rev 24 to EPIP 1
S revised index for BFN,Units 1,2
& 3.NRC controlled copies are recgxested to be updated within 30 days of rev dates.
T DZSTRZBUTZON CODE..A045D COPTER RECEZVED..LTR I
ENCL 3 SZEE.
TITLE: OR Submittal:
- Plans, Implement'g Procedures, NOTES:
ACCESSION NBR:9810260248 DOC-DATE: 98/10/20 NOTARIZED: NO DOCKET FACIL:50-259 Browns Ferry Nuclea'r Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION ABNEY,T.E.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
I RECIPIENT ID CODE/NAME PD2-3-PD INTERNAL: AEOD/HAGAN,D NRR/DRPM/PERB EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME DEAGAZIO,A CE ER 01 NUDOC NRC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1' Y
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9
ENCL 9
Tennessee Valley Authority. Post Office Box 2000. Decatur, Alabama 36609 October 20, 1998 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentleman:
In the Matter of
)
Tennessee Valley Authority
)
Docket Nos.
50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, and 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE
{EPIP) REVISION TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, to provide NRC with EPIP 1 Revision 24 and Index.
The revision date for this change is October 6,
1998.
TVA requests that your controlled copies be updated within 30 days of the revision dates as noted on the transmittal/receipt acknowledgment sheet.
The enclosed information is being sent by certified mail.
The signed receipt signifies that you have received this information and will be taken as verification that the NRC copy of the procedures have been updated, and the superseded material has been destroyed.
od~
P'DtJU~
98'260248 98i020 PDR ADOCK 05000259, F
\\
U.S. Nuclear Regulatory Commission Page 2
October 20, 1998 If you have any questions, please telephone me at (256) 729-2636.
S'e e
. Abney Manager of 'ns ng and Industry Af airs Enclosure cc (Enclosure):
NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road
Mr. H.
O. Christensen, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street S.W.
Suite 23T85
- Atlanta, Georgia 30303 (2 copies)
Mr. A.
W.
De Agazio, Project Manager (w/o Enclosure)
U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP)
EPIP -1 SEE ATTACHED
GENERAL REVISIONS GENERIC FILING INSTRUCTIONS FILE DOCUMENTS AS FOLLOWS:
PAGES TO BE REMOVED PAGES TO BE INSERTED EPIP INDEX (ALL)
EPIP -1 REVISION 23 (ALL)
EPIP INDEX (ALL)
EPIP -1 REVISION 24 (ALL)