ML18039A551
| ML18039A551 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/30/1998 |
| From: | Abney T TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18039A552 | List: |
| References | |
| NUDOCS 9810080119 | |
| Download: ML18039A551 (22) | |
Text
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM {RIDS)
ACCESSION NBR:9810080119 DOC.DATE: 98/09/30 NOTARIZED: NO DOCKET I FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION ABNEY,T.E.
Tennessee Valley Authority a2 RECIP NAME RECIPIENT AFFILIATION r
Records Management Branch (Document Control Desk)
SUBJECT:
Forwards listed revised EPIPs IAW 10CFR50,App E,Section V
for Browns Ferry Nuclear Plant.Rev date for changes is 980924.
Q T
DISTRXBUTION CODE: A045D COPXES RECEXVED:LTR ENCL SIZE:
TITLE: OR Submittal:
- Plans, Implement '
Procedures, G
NOTES:
RECIPIENT XD CODE/NAME PD2-3-PD
'NTERNAL: AEOD/HAGAN,D NRR/DRPM/PERB EXTERNAL: NOAC.
COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME DEAGAZIO,A LE CENTER 0
NUDOCS-ABSTRA'CT'RC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1 E
N NOTE TO ALL "RIDS" RECIPIENTS:
EAS HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMEN CONTROL T
DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
~
II
Tennessee Valley Authority, Post Office Sox 2000, Decatur, Alabama 36609-2000 September 30, 1998 10 CFR 50 Appendix E
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentleman:
In the Matter of
)
Tennessee Valley Authority
)
Docket Nos.
50-259 50-260 50-296 BROWNS FERRY NUCLEAR'PLANT (BFN)
UNITS 1, 2, and 3 EMERGENCY PLAN. IMPLEMENTING PROCEDURE (EPIP)
REVISIONS TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, to provide NRC with the following EPIP revisions:
(1)
- Index, (2)
EPIP 1 Revision 23, and (3) EPIP 5 Revision 25.
The revision date for the changes is September 24, 1998.
TVA requests that your controlled copies be updated within 30 days of the revision dates as noted on the transmittal/receipt acknowledgment sheet.
The enclosed information is being sent by certified mail.
The
. signed receipt signifies that you have received this information and will be taken's verification that the NRC copy of the procedures have been updated, and the superseded material has been destroyed.
98i0080ii9 980930 PDR ADQCK 05000259; F
ca@ g.
U.S. Nuclear Regulatory Commission Page 2
September 30, 1998 If you have any questions, please telephone me at (256) 729-2636.
cerely ney Manager of
'cens'ng and Ind stry Af irs
'I, Enclosures cc (Enclosures):
NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road
Mr. H. O..Christensen, Branch Chief (2 copies)
U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street S.W.
Suite 23T85
- Atlanta, Georgia 30303 Mr. A. W.,DeAgazio, Project Manager (w/o Enclosures)
U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
GENERAL REVISIONS GENERIC FILING INSTRUCTIONS FILE DOCUMENTS AS FOLLOWS:
PAGES TO BE REMOVED EPIP INDEX (ALL)
EPIP -1 REVISION 22 (ALL)
EPIP -5 REVISION 24 (ALL)
PAGES TO BE INSERTED EPIP INDEX (ALL)
EPIP -1 REVISION 23 (ALL)
EPIP -5 REVISION 25 (ALL)
Unit Proc Type Proc Number Browns g'erry Nuclear Plant Curator Procedu Folder Screen status~ACTIVE ProcTyp P Doc Type~PROCEDURE Sorted Type Doc Type Title Eff Dt Group Doc Stat Section REV Page 1
0
/98 0
EPIP EPIP-1 0
EPIP EPIP.-10 0
EPIP EPIP-11 0
EPIP EPIP-13 0
EPIP EPIP-15 0
EPIP EPZP-16 0
EPIP EPIP-14 PROCEDURE EMERGENCY PION CLASSIFICATION LOGIC PROCEDURE SECURITY AND ACCESS CONTROL PROCEDURE RADIOCHEMICAL LABORATORY PROCEDURE PROCEDURE RADIOLOGICAL CONTROL PRO PROCEDURE EMERGENCY EXPO URE PROCEDURE TERMI ON AND RECOVERY PROC URE PROCEDURE MEDICAL EMERGENCY PROCEDURE 07/27/1998 ACTIVE ACTIVE 07/09/1998 ACTIVE ACTIVE 09/15/199 ACTIVE ACTI 09 5/1995 CTIVE ACTIVE 11/17/1997 ACTIVE ACTIVE 06/26/1996 ACTIVE ACTIVE 11/01/1995 ACTIVE ACTIVE OTHER REP OTHE RE OTHER REP OTHER REP OTHER REP OTHER REP OTHER REP 022 019 007 006 013 005
~ 003 0
EPZP 0
EPZP 0
EPZP 0
EPIP 0
EPIP 0
EPZP EPZP-17 EPIP-2 EPIP-20 EPIP-21 EPIP-3 PZP-4 OTHER PROCEDURE REP OTHER REP ACTIVE 06/14/1996 OTHER ACTIVE'EP ACTIVE 06/25/1997 OTHER ACTIVE REP ACTIVE 05/12/1997 OTHER ACTIVE REP ACTIVE 05/12/1997 OTHER ACTIVE REP ACTIVE PROCE RE PROCEDURE PLANT DATA PROCEDURE FIRE EMERGENCY PROCEDURE PROCEDURE ALERT PROCEDURE SITE AREA EMERGENCY RGENCY EQUIP
?g AND SUPPLIES 07/14/1998 (INVENTORY AND OPERABILITY ACTIVE PROCEDURE)
ACTIVE NOTIFICATION OF UNUSUAL EVE 05/12/1997 ACTIVE 022 020 009 002 023 022
Unit Proc Type Proc Number Brows Ferry Nuclear Plant Curator Procedures Folder Screen status~ACTIVE ProcType~EPIP Doc Type=PROCEDURE Sorted hy Type Doc Type Title Eff Dt Group Doc Stat Section i
REV Page 2
pg10lcc 07/27/98 0
EPIP EPIP-6 0
EPIP EPIP-7 0
EPIP EPIP-8 0
EPIP EPIP-5 PROCEDURE GENERAL EMERGENCY
, PROCEDURE PROCEDURE ACTIVATIONAND OPERATION OF THE OPERATIONS SUPPORT CENTER (OSC)
PROCEDURE PERSONNEL ACCOUNTABILITYAND EVACUATION ACTIVATIONAND OPERATION OF THE TECHNICAL SUPPORT CENTER (TSC) 05/12/1997 ACTIVE ACTIVE 11/20/1996 ACTIVE ACTIVE 11/20/1996 ACTIVE ACTIVE 11/17/1997 ACTIVE ACTIVE OTHER REP OTHER REP OTHER REP OTHER REP 024 017 017 010
~
I
~
TENNESSEE VALLEYAUTHORITY 4
BROWNS FERRY NUCLEARPLANT EMERGENCY PLAN IMPLEMENTINGPROCEDURE EPIP-5 GENERAL EMERGENCY REVISION 24 PREPARED BY:
A. H. FELTMAN PHONE: 3666 RESPONSIBLE ORGANIZATION: EMERGENCY PREPAREDNESS APPROVED BY:
MASOUD BAJESTANI DATE: 04/17/97 EFFECTIVE DATE: 05/12/97 LEVELOF USE: REFERENCE USE VALIDATIONDATE: NOT REQUIRED QUALITY-RELATED 0733104394 BFNP EPIP EPIP" 5 051297 24
REVISION LOG Procedure Number:
EPIP-5 Revision Number:
24 Pages Affected:
1-4, 7, 8,
9 Description of Change:
IC-29 THIS PROCEDURE REVISION ZS BEING CONDUCTED TO UPDATE TELEPHONE
- NUMBERS, PROVIDE CLARIFING INFORMATION REGARDING THE NOTIFICATION OF THE ODS AND STATE OFFICIALS, CLARIFY INFORMATION REGARDING PERIODIC EVALUATIONS, HUMAN FACTOR THE NOTIFICATION ZNFORMATIN REGARDING THE ACTION OF PORTECTIVE ACTION RECOMENDATIONS.
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEARPLANT
'l.0 PURPosE 1.1 Provide for timely notification of appropriate individuals or organizations when the Shift Manager/Site Emergency Director (SED) has determined by EPIP-1 that an incident has occurred which is classified as a GENERAL EMERGENCY (GE).
1.2 Provide for periodic evaluation'of the current situation by the Shift Manager/SED to determine whether the GE should be terminated, or continued.
2.0 ScoPE This procedure applies to emergency events that are classified as General Emergency by EPIP-1, Emergency Classification Procedure.
PAGE 1 OF 11 REVISION 24
GENERAL EMERGENCY EPIP-5 BROWNS FLURRY NUCLEARPLANT 3.0 INsTRUcTioNs NoTE:
IF ALLEMERGENGY CENTERs ARE STAFFED STEPs 3.'I THRU 3.2 Do NoT APPLY. (NIASTEPs IF NQT APPLIGABLE) 3.1 Notification of the 0 erations Dut S ecialist ODS & Emer enc Res onders Note: The ODS should be notified within 5 minutes after the emergency event is declared.
Date:
3.1.1
~Com tete Attachment A (Notification Information).
3.1.2 Direct the Unit 1, Unit Operator to make notifications from Attachment 8 (Unit 1, Unit Operator Notification) 3.1.3
~Motif the ODS and Provide the information from Attachment A.
INITIALS iNITIALS INITIALS TIME TIME TIME Note: Utilize the direct ring-down ODS phone when making this notiTication or as applicable dial direct.
ODS Telephone Numbers 5-751-1700, 2495 Ifthe ODS cannot be reached within 10 minutes, Then contact the following and Provide the information from Attachment A:
- 1. Limestone County:
9-232-0111
- 2. Nlorgan County:
9-1-205-353-2515
- 3. Lawrence County:
9-1-205-974-7641
- 4. Lauderdale County:
9-1-205-760-9117 INITIALS INITIALS INITIALS INITIALS TIME TIME TIME
- 5. State of Alabama Rad Health Duty Officer:
Day Shift 8 a.m. - 5 p.m.
9-1-334-206-5391 Holidays-Weekends-Offshifts 9-1-334-242-4378 PAGE 2 OF ll INITIALS TIME REVISION 24
.GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEARPLANT 3.0 INsTRUGTIQNs (CoNTINUED) 3.1.4 Fax a copy of Attachment A to the ODS for confirmation of information or the state ifcontacted directly.
INITIALS TIME ODS Fax 5-751-8620 AL Rad Health 9-1-334-206-5387 3.1.6 Receive confirmation call from the ODS (to verify notification of the State of Alabama), (N/A this step ifthe State was contacted directly).
3.2 NoTIFIcATIQNoF SITE PERsoNNEL TIME 3.2.1 Make the following plant P.A. announcement:
THIS IS (NAME), SHIFT MANAGER. A GENERAL EMERGENCY HAS BEEN DECLARED ON UNIT I HAVEASSUMED THE DUTIES OF SITE EMERGENCY DIRECTOR. REPORT TO YOUR ASSIGNED EMERGENCY RESPONSE FACILITY ATTHIS TIME!
INITIALS TIME 3.3 AccoUNTABILITYAND EVAcUATIoNoF NQN-EMERGENGY RESPONDERS Note:
Prior to sounding the Evacuation Alarm notify Nuclear Security.
Ifthe TSC is staffed notify the TSC Security Manager.
Ifthe TSC is not staffed or the TSC Security Manager position has not been filled then call 3629 or 7830.
3.3.1 Activate the Accountability Alarm, ifnot previously sounded.
(Reference EPIP-8) (N/A STEP IF NQT APPLICABLE) 3.3.2 When accountability is complete, Conduct evacuation of non-emergency responders by activating the Evacuation Alarm, ifnot previously sounded. (N/A STEP IF NQT APPLIGABLE) iNITIALS iNITIALS TIME TIME PAGE 3 OF 11 REVISION 24
GENERAL EMERGENCY EPIP-5 BROWNS FLURRY
~
NUCLEARPLANT 3.0 INsTRUcTIoNs (CoNTINUED) 3.4 DosE AssEssMENT 3.4.1 Evaluate the need for offsite dose assessment.
(NIASTEP IF NQT APPLIGABLE)
INITIALS TIME 3.4.1.1 When offsite dose assessment is required Obtain the information from the CECC when operational.
3.4.1.2 Ifthe CECC is not operational, Contact the TSC, when staffed or the RADCON Shift Supervisor and ~Re uest the implementation of EPIP 14, for dose assessment.
3.5 NQTIFIGATIQNoF THE NRC 3.5.1
~Motif the NRC immediately or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and if requested by the NRC maintain an open and continuous communications channel.
INITIALS TIME Note; Utilize the Emergency Notification System (ENS) when making this notification. Dial the first number listed on the sticker affixed to the ENS telephone, using all 10 digits. Ifthe number is busy, Then select in order, the alternate numbers until a connection is achieved.
Note: Ifthe ENS phones are out-of-service, Then dial direct utilizing the TVAphone system by dialing 9-1-the number listed on the ENS telephones.
No access codes are required.
PAGE 4 OF 11 REVISION 24
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEARPLANT 3.0 INsTRUcTioNs (CoNTINUED) 3.6 PRoTEGTIvE AGTIQN REcoMMENDATIQN 3.6.1 Ifthe CECC is not staffed Then make a Protective Action Recommendation (PAR) using Attachment D. (This PAR shall be made only by the SED.) (N/A STEP IF NQT APPLIGABLE)
INITIALS TIME 3.7 EMERGENGY REsPoNsE TEAM NoTIFIGATIQNs 3.7.1 Ifthe following emergency centers are staffed, Then notify the following of the current emergency classification and plant conditions.
(N/ASTEP IF NQT APPLIGABLE)
INITIALS TIME
~
~
~
~
CONTROL ROOMS
~
PLANTPA ANNQUNGEMENT 3.8 PERIQDIc EUALUATIQNoF THE EvENT 3.8.1 Continue to Evaluate the event using EPIP-1 as conditions warrant.
Note: Conditions that warrant this evaluation are as a minimum when other EAL conditions exist indicating the current emergency classification or significant changes in plant conditions have occurred.
3.8.2 Ifthe CECC is not staffed, Then notify the ODS and provide the current plant status.
Utilize the direct ring-down ODS phone when making this notification or as applicable dial direct.
ODS 751-2495, 1700 Note: Ifthe ODS cannot be reached, Then contact the State of Alabama directly by requesting the Rad Health Duty Officer at:
Day Shift 8 a.m. - 5 p.m.
9-1-334-206-5391 Holidays-Weekends-Offshifts 9-1-334-242-4378 PAGE 5 OF 11 REVISION 24
GENERAL EMERGENCY EPIP-5 BROWNS FERRY
~
NUCLEARPLANT 3.0 INSTRUCTIONS (CONTINUED) 3.8 PERIQDIG EvALUATIQNoF THE EvENT(CQNTINUED) 3.8.3 Ifthe conditions warrant termination of the classification, Then enter EPIP-16, Termination and Recovery Procedure.
3.8.4 After the evaluation has been completed, ifstaffed
~Nottf the following of the status:
~
~
NRC (ENS)
~
~
~
CQNTRQL RooMs
~
PLANTPA ANNQUNGEMENT 3.8.5 Document the completion of the evaluation by log entry.
3.8.6 Re-enter this procedural section as conditions warrant at step 3.8.1 or until directed to exit this procedure by steps 3.8.3.
3.9 CLosURE oF THE GENERAL EMERGENGY 3.9.1
~Uon termination of the General Emergency Send the completed EPIP-5 and all attachments to Emergency Preparedness (EP).
3.9.2 EP shall Forward to the PORC Secretary the completed EPIP and all attachments for review by PORC.
TIME 3.9.3 PORC Review Completed.
PORC Chairman
[NRC/C85/28].
DATE 3.9.4 After PORC review is completed the PORC secretary shall Forward the signed EPIP-5 with all INITIALs attachments to EP for documentation storage.
TIME PAGE 6 OF 11 REVISION 24
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEARPLANT 4.0 ATTACHMENTS Attachment A - Notification Information Attachment B - Unit 1, Unit Operator Notification Attachment C - Protective Action Recommendations PAGE 7 OF 11 REVISION 24
GENERAL EMERGENCY EPIP-5 BROWSES FLURRY NUCLEARPLANT ATTACHMENTA (Page 1 of 1)
NOTIFICATION INFORIVIATION Q THIS IS A REAL EVENT THIS IS A DRILL This is EAL Designator:
Brief Description of the Event:
at Browns Ferry.
Name There has been a GENERAL EMERGENCY declared at Browns Ferry affecting:
Q Unit1 Unit 2 Unit 3 Q Common Plant Conditions:
Q Stable Deteriorating Radiological Conditions:
Q No Abnormal Releases Offsite Q Airborne Release Offsite Q Liquid Release Offsite Q Release Information Not Known Event Declared:
Event Terminated:
Time:
Time:
Date:
Date:
The following Protective Action Recommendation (PAR) is provided (PAR Required for General Emergency).
Q Recommendation 1 - Evacuate 2 mile radius and 10 miles downwind and shelter remainder of 10 mile EPZ.
Q Recommendation 2 - Evacuate 2 mile radius and 5 miles downwind and shelter remainder of 10 mile EPZ.
Q Recommendation 3 - Evacuate 2 mile radius and shelter remainder of 10 mile EPZ.
Q Recommendation 4-Shelter 2 mile radius and shelter 5 miles downwind.
The Meteorological Conditions are:
Wind Speed:
Wind Direction From:
Please re eat the information ou have received to ensure accurac PAGES OF 11 REVISION 24
EMERGENCY EPIP-5 BROWNS FERRY NUCLEARPLANT ATTACHMENTB (Page 1 of 2)
Unit 1, Unit Operator NOTIFICATION Date:
I I
- 1. 'Activate the Automatic Paging System (APS).
Note: See Instructions in EPIP-6 Callout List (List will be maintained by the EP Manager)
Important:
Ifthe APS does NOT activate, Call the ODS (5-751-1700 or 5-751-2495) to activate and notify the SED immediately.
INITIALS TIME 2.
~Notif the Unit Supervisor's on shift.
INmALS TIME 3.
~Notif Nuclear Security Shift Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED," and direct to activate EPIP-11, Security and Access Control.
Plant Extension 3629 or 7830 INITIALS TIME 4.
~Notif the Chemistry Lab Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED," and direct to activate EPIP-13, Radiochemical Laboratory Procedure.
~
Plant Extension 2367 or 2368 INITIALS TIME 5.
~Notif the RADCON Shift Supervisor and state "A GENERAL EMERGENCY HAS BEEN DECLARED," and direct to activate EPIP-14, Radiological Control Procedure.
Plant Extension 2300 or 3104 INITIALS PAGE 9 OF 11 REVISION 24
+
s GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEARPLANT ATTACHMENTB (Page 2 of 2)
Unit 1, Unit Operator NOTIFICATION Date:
I I
6.
'~Motif the "On-Call" MRC Resident and state "A GENERAL EMERGENCY HAS BEEN DECLARED," per BFN-EPIP-05.
~
Plant Extension 2572 [Secretary]
or from weekly duty list INITIALS TIME 7.
IF the APS did not operate properly, Make notifications from the current duty list. Ifthe individuals on the duty list cannot be contacted, INake notifications from the EPIP-6 Call Out List.
~Motif the SED of the condition.
IH<TNLS TIME PAGE 10 OF 11 REVISION 24
vi
~v
~, 'a>
GENERAL EMERGENCY EPIP-5 BROWNS FERRY NUCLEARPLANT ATTACHMENTC (Page 1 of 1)
PROTECTIVE ACTION RECOMMENDATIONS General Emergency Dcclarod NOTES Qt IF Conditions Are not known,
'Ihcn Answer No.
Qr CONIINUB ASSBSSMBNT.
Modifyprotective actions based on available plant and field monitoring infomaiion. Locate and evacuate addluonal Iocahzcd hot spots.
(Q When Dose Asscssmcnt Projections OR Actual Measured Exposures are not known, a stack release rate of> 1.3 ElI uCi/ace noble gas can be utilized to mcct the condition of I Rcrn/hr External Dose at the site boundary.
Projected or Measured Dose Greater Than or Equal to the Table I Limits at ot beyond S htILES NO Indications of Severe Core Damage Greater Than or equal to the Values in Table 2 NO Is there loss of Physical Control of the Facility YES YBS YBS RECOMMENDATIONI EVACUATE2 Milaradar and to Miles downw/nd and SIIELTERtaualnder ef IO MileEPZ TABLE I RA D IOACTIVITY RELEASE DOSE NO TYPE Measured Projected I IMIT 3i9 B-6 uCI/cc of Iodine 131 I REM/hr Bxtcrnal Dose IRBM TBDB 5 RBM Thyroid CDB TABLE 2 INDICATIONS Projeoted or hteasured Dose OreaterThan or Equal to thc Table I Limits at or beyond 2 hllLES NO O's Prcjeoted or Measured Dose Oroaier Than or Equal to the Tabt ~ I Limits at or beyond SITE BOUNDARY NO YBS YBS RECOhlhIENDATION EVACUATE 2 mile radius and 5 Miladoanwind and SIIELTER rauainder of IOMileEPZ RECOMhIENDATION EVACUATE2 Mde rad/us and SI tEL'IERrenudnda of 10 htile EPZ
- 1. Fuel Not Covered And Stcam Cooling Entcrcd (BOI~) or Primar Containm<<nt Flooding Entered (BOIH).
- 2. Unit2-cllRadiation Exceeds 270 R/hr on 2-272 or 2-EM*90-273.
Unit 3 DrywcllRadiation Excccds 90 R/hr on 3-RM-90.272 or 3-RM-90-273.
- 3. EquiTibrium Reactor Coolant Acthltyof
> 300 uCi/
Dose uivslcnt Iodine.
LAST PAGE PAGE 11 OF 11 RECOMh'IENDATION SIIELTER2Mileradius and SIIELTER5 hQa downviind REVISION 24
t i e.