ML18039A415

From kanterella
Jump to navigation Jump to search
Forwards Revised COLRs to Bfn,Units 2 & 3,per TS 6.9.1.7. Revs Provide Correction to Tau Calculation Documented in Section 4.a of Each COLR & Adds Corresponding Reference
ML18039A415
Person / Time
Site: Browns Ferry  
Issue date: 06/30/1998
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18039A416 List:
References
NUDOCS 9807080140
Download: ML18039A415 (6)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRXBUTIO SYSTEM (RIDS)

ACCESSION NBR:9807080140 DOC.DATE: 98/06/30 NOTARIZED: NO DOCKET ¹ FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR, AFFILIATION ABNEY,T.E.

Tennessee Valley Authority.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards revised.

COLRs to BFN,Units 2

6 3,per TS 6.9.1.7.

Revs provide correction to Tau calculation documented in section 4.a of each COLR

& adds corresponding reference.

DISTRIBUTION CODE:

D030D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: TVA Facilities - Routine Correspondence NOTES:

RECIPIENT ID CODE/NAME PD2-3 DEAGAZIO,A COPIES RECIPIENT LTTR ENCL 'D CODE/NAME 1

1 PD2-3-PD 1

1 COPIES LTTR ENCL 1

1 0

INTERNAL: ACRS OGC/HDS3 1

1 0

1 1

I E CENTER Ol RE B

ES NRC PDR 1

1 1

1 1

1

'D 0

N NOTE TO ALL "RIDS" RECIPIENTS:

t PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

~NCL 8

~O ii il~

Tennessee Valley Authority. Post Office Box 2000. Decatur. Alabama 35609 June 30, 1998 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos.

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 CORE OPERATING LIMITS REPORT REVIS IONS FOR UNIT 2 CYCLE 1 0 r AND UNIT 3 CYCLE 8 OPERATION In accordance with the requirements of Technical Specification 6.9.1.7, enclosed is Revision 1 to the Unit 2 Cycle 10, and Revision 2 to the Unit 3 Cycle 8,

Core Operating Limits Reports (COLR).

The revisions provide a

correction to the Tau calculation documented in Section 4.a of each COLR and adds a corresponding reference.

The revised

/

COLRs were issued on May 28,

1998, to support plant operation.

Enclosure 1 to this letter contains the revised Unit 2 Cycle 10 COLR and Enclosure 2 contains the revised Unit 3 Cycle 8

COLR.

There are no new commitments contained in this letter.

If you have any questions, please contact me at (256) 729-2636.

c el r

T.. Ab y

Manager of Lice x g and Industry ff irs Enclosure cc:

See page 2

'P807080i40

'tf80630 PDR ADOCK OM00260 P

PDR

0

~li

U.S. Nuclear Regulatory Commission Page 2

June 30, 1998 Enclosure cc (Enclosure):

Mr. Harold O. Christensen, Branch Chief UPS. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833.Shaw Road

Athens, Alabama 35611 Mr. A'lbert W.

De Agazio, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

0 Ci

'\\

Cl