ML18039A340
| ML18039A340 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 05/11/1998 |
| From: | Abney T TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18039A341 | List: |
| References | |
| NUDOCS 9805210103 | |
| Download: ML18039A340 (6) | |
Text
CATEGORY 1 REGULA'l' INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9805210103 DOC.DATE: 98/05/11 NOTARIZED: NO FA'CIL:50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION ABNEY,T';E. ='ennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards COLR,rev 1,for Unit 3 cycle 8 operation. Revision includes addition of two references
& data to accommodate fule loading mods during mid-cycle outage.
DISTRIBUTION CODE:
D030D COPIES RECEIVED:LTR'NCL SIZE:
TITLE: TVA Facilities - Routine Correspondence NOTES:
DOCKET I 05000296 C
RECIPIENT
~,ID CODE/NAME PD2-3 DEAGAZZO,A COPIES LTTR. ENCL 1
1 1
1 RECIPIENT ID CODE/NAME PD2-3-PD COPIES LTTR ENCL 1
1 INTERNAL: ACRS OGC/HDS3 EXTERNAL: NOAC 1
1 1
0 1
1 E CENTER 01 ES/DE.S EB SES NRC PDR 1
1 1
1 1
1 D
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 8
4i ii I
I
Tennessee Valley Authority. Post Office Box 2000. Decatur. Alabama 35609 May 11, 1998 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Tennessee Valley Authority
)
Docket No.
50-296 BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 3 CORE OPERATING LIMITS REPORT r REVIS ION 1 r FOR UNIT 3 CYCLE 8 OPERAT ION In accordance with the requirements of Technical Specification 6.9.1.7, enclosed is Revision 1 to the Unit 3 Cycle 8, Core Operating Limits Report (COLR).
The revised COLR was issued on April 17,
- 1998, to support Unit 3 operation.
The revision includes the addition of two references and data (Table
- 9) to accommodate fuel loading modifications during the mid-cycle outage.
There are no new commitments contained in this letter.
If you have any questions, please contact me at (256) 729-2636.
sj ncerely, T.
ED Abn y Manager of L'z.n and Indus ry Affa'rs Enclosure cc:
See page 2
98052l0503 9805%i PDR'DOCK 05000296 P
4>
it
U.S. Nuclear Regulatory.Commission Page 2
May ll,'998 Enclosure cc (Enclosure):
Mr. Harold O. Christensen, Branch.
Chief'.S.
Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.
Suite 23T85
- Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road
- Athens, Alabama 35611 Mr. Albert W.
De Agazio, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
0
'I