Text
CATEGORY REGULA ORY INFORMATION DZSTRZBUTZ SYSTEM (RIDS)
ACCESSION NBR:9801260433 DOC.DATE: 98/01/15 NOTARIZED: NO DOCKET ¹ FACZL:50-260,Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.MME 'UTHOR AFFILIATION ABNEY,T.E.
'Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "BFNP Unit 2 Cycle 10 Power Ascension Test Program Start-Up Rept," for period 970929-1105.Cycle is first reload of GE GE13 fuel assemblies.
DISTRIBUTION CODE:
IE26D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Startup Report/Refueling. Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD2-3-PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME DEAGAZIO,A COPIES LTTR ENCL 1
1 INTERNAL: ACRS NRR/DSSA/SRXB/B EXTERNAL: NOAC 1
1 1
1 1
1 FXLE CENTE NRC PDR 01 1
1 1
1 1
1 D
0 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM, DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 8
ENCL 8
ll
Tennessee Valfey Authority, Post Office Box 2000, Decatur. Alabama 35609-2000 January 15, 1998 U.S'. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket No. 50-260 BROWNS 'FERRY NUCLEAR PLANT (BFN)
UNIT 2 - CYCLE 10 POWER ASCENSION TEST PROGRAM. (PATP)
START-UP REPORT This letter provides the BFN Unit 2, Cycle 10 Start-up Report to NRC as required by BFN Technical Specification Section 6.9.1.1 due to the installation of fuel of a different design.
This cycle is the first reload of General Electric (GE)
GE13 fuel assemblies.
The PATP was performed during the period of September 29,
- 1997, through November 5,
1997.
Testing has been completed as defined within the scope of the BFN Unit 2 PATP.
Completed tests met performance criteria or had test deficiencies issued which were satisfactorily dispositioned.
The test results confirm that BFN Unit 2 systems are capable of meeting design functions.
- Further, power operation can be safely and efficiently continued.
There are no known deficiencies that could be detrimental to the continued safe operation of the unit.
980i2b0433 980i15 PDR ADQCK 050002b0 P
PDR 7 g7(~
Il 0
U.S. Nuclear Regulatory Commission Page 2
January 15, 1998 The Final Refueling Test Report is provided in the Enclosure and detailed test packages are available for review on site.
There are no new commitments contained in this letter.
If you have any questions, please contact me at (205) 729-2636.
Si
- erely, T. E. Abney Manager of Lic sing and Indust y Affai s Enclosure cc (Enclosure),:
Mr. Albert W.
De Agazio, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.
Suite 23T85
- Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road
- Athens, Alabama 35611
ib
%i