Forwards Browns Ferry Nuclear Plant Units 1,2 & 3 Simulator Four Yr Test Rept
ML18038B573
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/13/1995
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18038B574 List:
References
NUDOCS 9512180208
Download: ML18038B573 (5)


Text

~

~

5 R.IC3 R.I"P Y'CCE I !"RATED R IDS P ROCESSI XG)~

I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9512180208 DOC.DATE: 95/12/13 NOTARIZED: NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION SALAS,P.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g

05000259 05000260 05000296 p

SUBJECT:

Forwards "Browns Ferry Nuclear Plant Units 1,2 6

3 Simulator Four Yr Test Rept."

DISTRIBUTION CODE:

A005D COPIES RECEIVED: LTR,Q ENCL J SIZE: +4 (

TITLE: Simulator Facility Certification GL-90-08 NOTES:

0 RECIPIENT ID CODE/NAME WILLIAMS,J.

INTERNAL ILE CENT 01 NRR/DRPM/PECB EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR/DRCH/HOLB COPIES LTTR ENCL 1

1 D

dd d O

C U

N T

YOTE To ALL"RIDS" RECIPI E Y'TS:

PLEASE HELP US To REDUCE IVKSTE!COYTACT'I'IIE DOCL'IIEETCOYTROL DESK. ROONI Pl-37 (EXT. 504-0083 ) TO FLIMINATEYOI.'R YAWL'ROII DIS ml!IUTIOY,LIS'I'S I OR DOCnIVi"I'S'>'Ol'Oi"IYL'I;D!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 5

ENCL 5

) '

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609 December 13, 1995 10 CFR 55 ~ 45 (b) (5)

Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos.

50-259 50-260 50-296 BROWS FERRY NUCLEAR 3?LANT (BFN) - UNITS 1g 2g AND 3 10 CFR 55'5 PLANT-REFERENCED SIMULATOR CERTIFICATION REPORT The purpose of this letter is to provide the plant-referenced simulator certification report to NRC as required by 10 CFR 55.45(b)(ii) and (b)(5)(vi).

This report is submitted to the Commission every four years.

TVA submitted the original certification on December 17, 1991.

Accordingly, the enclosure provides the BFN Simulator four year Certification Test Report for the test period December 1991 through December 1995.

Director of Nuclear Reactor Regulation Page 2

December 13, 1995 There are no commitments contained in this correspondence.

If you have any questions, please contact Thomas S. Albright at (205) 729-3434.

Si cere o

as Manager of Site Licensing Enclosure cc (Enclosure):

Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road

Athens, Alabama 35611 Mr. J.

F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

0 4 'I