ML18038B550

From kanterella
Jump to navigation Jump to search

Forwards List of Technical Issues Re Restart of Browns Ferry Unit 3 Which Were Assigned to NRR for Resolution or Assistance
ML18038B550
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 11/17/1995
From: Varga S
NRC (Affiliation Not Assigned)
To: Jerrica Johnson
NRC
References
TAC-M89645, NUDOCS 9511200237
Download: ML18038B550 (8)


Text

November 17, 1995 MEMORANDUM FOR:

Jon R. 'Johnson, Chairman Browns Ferry Unit 3 Restart Panel FROM:

Steven A. Varga; Director Division. of Reactor Projects I/II Office-of Nuclear Reactor Regulation J2'S/

Sow

SUBJECT:

STATUS OF. RESTART ISSUES ASSIGNED TO NRR FOR BROWNS FERRY UNI~T 3 (TAC NO. M89645)

Attached is a 1'ist of'echnical issues related to the restart of Browns Ferry Unit 3 which were assigned to"the Office, of Nuclear Reactor Regulation for resolution or assistance.

NRR. has completed'ction on these items.

There are no open items requiring NRR action that should affect a recommendation by the Restart Panel to allow restart of Browns Ferry Unit 3.

Contact Joe Williams at (301)415-1470 if you have questions about this topic.

Docket No. 50-296

Attachment:

As stated cc:

F.

Hebdon J. Williams M. Lesser L. Wert C. Casto K. Barr E. Herschoff J. Zwolinski Distribution:

Docket Files PUBLIC JZwolinski OGC ACRS DOCUMENT NAME:

G:iBFNiCLOSURE.NRR To receive a copy of this document, indicate in the box:

"C" = Copy without attachment/enclosure "E" = Co y with attachment/enclosure "N" = No co y OFFICE PDII-3/LA PDII-3/PH PDII-3/D DRPE:D NAME BCIayton JMIIIIams FHelxion 4

> fV Svarga DATE 11!

95 11/

7E /95 11/

/95 OFFICIAL RECORD COPY 11/I l /95 95ii200237 'P5iii7 PDR ADOCK 05000296 P

PDR

4i E

f, Jl ),*II

'll t

L jf 1P 1t' 1g, I'

1

Browns Ferry Unit 3 Licensing Activities Special Programs

. TAC No.

Descri tion H69432 M74615 M74616 M76753 H80013 H80015 M80017 H80036 H80620 M80682 H80684 H80686 H80688 H80690 H81791 H82127 H83828 H85254 H85298 H86255 Flexible Conduit (Long-term)

Containment Isolation Dependability - II.E.4.2.1-4 Containment Isolation Dependability II.E.4.2.6 Restart Plan Small Bore Piping Seismic Class II/I Mater Spray Instrument Sensing Lines Concerns Instrument Sensing Line Seismic gualification Lower Drywell and Miscellaneous Steel Design Criteria Cable Installation Cable Tray Supports Torus Long-Term Integrity Design Baseline Verification Program Conduit Supports Restart Test Program HVAC Seismic Design Criteria Component and Piece Parts gualification Appendix R Safe Shutdown Cable Separation Discrepancy Resolution Medium Voltage Cable Bend Radius Applica-tion Date 10/15/93 9/1/92 9/1/92 4/20/90 2/27/91 2/27/91 2/13/91 2/27/91 6/12/91 5/10/91 3/27/91 4/29/91 6/13/91 5/6/91 9/27/91 11/15/91 6/12/92 12/14/94 12/29/92 3/17/93 Licensing Action Date 10/6/95 1/6/95 1/6/95 4/1/92 2/4/92 12/17/91 12/10/91 2/4/92 4/20/94 4/8/92 12/17/91 2/10/92 11/21/92 3/20/92 8/30/94 7/16/92 12/7/93 11/2/95 1/28/93 1/9/95 ATTACHMENT

ii

Browns Ferry Unit 3 Licensing Activities License Amendments TAC No.

Descri tion Application Date Licensing Action Date H82652 H82655 M83122 M83179 M84638 M84043 H86097 H87896 H87902 M87905 H88085 M89245 H89247 H89250 H89253 H91946 H92317 M92501 Core Thermal-Hydraulic Stability (TS 300)

EDGs for Unit 3 Operations (TS 304)

PASS (TS 302)

ADS Timer (TS 308)

ADS Valves (TS 326)

RHR Valve Pressure Switch (TS 314)

Hain Steam Radiation Monitor (TS 322)

Scram Pilot Air Header Pressure Switches (TS 312)

Appendix R License Amendment (TS 337)

Wide Range Radiation Monitors (TS 313)

RWCU Temperature Switches (TS 320)

Diesel Generator Load Shedding (TS 340)

HPCI/RCIC Temperature and Channel Checks (TS 319)

Analog Transmitter/Trip Systems

& other (TS 318)

Extended Load Line Limit and Revised RBH Operability (TS 339)

Reactor Vessel PT Curves and Boltup Temperatures (TS 349)

Scram Air Header Pressure Switches (TS 359)

RHRSW Requirements for Standby Coolant (TS 361) 1/14/92 1/10/92 4/1/92 4/6/92 9/28/92 7/2/92 3/25/93 9/30/93 9/30/93 10/7/93 10/12/93 3/30/94 3/31/94 4/30/94 3/31/94 3/31/95 5/11/95 6/17/95 5/31/94 3/9/94 6/21/94 5/19/94 6/30/94 9/12/94 4/27/95 11/2/95 12/21/94 3/15/95 2/14/95 3/16/95 7/17/95 2/24/95 9/13/95 9/5/95 11/2/95

0 S

Browns Ferry Unit 3 Licensing Activities Other Licensing Issues TAC No..

Descri tion Licensing Application Action Date Date H93759 Reactor Vessel Weld Flaw Evaluation 10/4/95 11/8/95 H93878 Bulletin 95-02 Unexpected Clogging of an RHR Pump Strainer 11/15/95 post-restart TVA's response to Bulletin 95-02 is acceptable for Unit 3 restart.

The licensing action will be closed for the site after restart.

il ii